File dateRefDocument
11/6/201711 1843-PMUTL-DA1 Notice Name & Address of the Engineer.pdf
11/8/201722 SMC4-1 Proposal for approval of Project Manager.pdf
11/8/201733 SMC4-2 Schedule of some documents to prepare for the execution of the Project.PDF
11/8/201744 SMC4-4 Fix the date of Ground Breaking Ceremony PK1.pdf
10/31/201755 1579-PMUTL-DA1 Appointment of the Engineer.pdf
11/16/201766 SMC4- 5 Notice on the Contractor s address.pdf
11/17/201777 SMC4-6 Proposal for approval of Key Personnel.pdf
11/17/201777- SMC4-6 Proposal for approval of Key Personnel.pdf
11/20/201788 SMC4-7 Submission of Performance Security.pdf
11/20/201788- SMC4-7 Submission of Performance Security.pdf
11/22/201799 SMC4-9 Submission of Contract's License.PDF
11/22/201799-SMC4-9 Submission of Contract's License.PDF
11/23/20171010 1436.2017-JICA-YL Review of Contract for PK1 & PK2.pdf
11/23/20171010-1436.2017-JICA-YL Review of Contract for PK1 & PK2.pdf
11/29/20171111 2251-PMUTL-DA1 Request for Review of Contract (2nd).pdf
12/1/20171212 SMC4- 12 Submission Quality Control Plan sửa.pdf
11/25/20171212 SMC4-12 Submission Quality Control Plan.pdf
11/25/20171313 SMC4- 11 Submission of SMCC-CIENCO4 JV's office and Accommodation for Staff Layout.pdf
12/6/20171414 SMC4-LT-02 Capacity Profile of Site Laboratary ( Las-XD668).pdf
12/6/20171414 SMC4-LT-2 Capacity Profile of Site Laboratary ( Las-XD668).pdf
12/4/20171515 SMC4- LC-13 Addtitional Geological Investtigation Plan.pdf
12/4/20171616 SMC4-LC-14 Submission of Project Health and Safety Plan.pdf
12/4/20171717 SMC4-LC-15 Tasks and Technical Options of Topographic Survey.pdf
12/6/20171818 1469.2017-JICA-YL Request Letters Ref 1706;2251PMUTL-DA1.pdf
12/6/20171818-1469.2017-JICA-YL Request Letters Ref 1706;2251PMUTL-DA1.pdf
12/7/20171919 SMC4- MS-01 Method statement of traffic Control for Additional Geological Investtigation.pdf
12/7/20172020 SMC4-WD-01 Working Drawing. General view and Girder arrangement of Main Bridge and off Ramp HQV-B 1st.pdf
12/7/20172020 SMC4-WD-1 Working Drawing. General view and Girder arrangement of Main Bridge and off Ramp HQV-B 1st.pdf
12/7/20172121 SMC4-MA-01 Capacity Profile of Batching Plant Asean.pdf
12/7/20172121 SMC4-MA-1 Capacity Profile of Batching Plant Asean.pdf
12/7/20172222 SMC4-MA-02 Capacity Profile of Bentonite Manufaturer-Truong Thinh.pdf
12/7/20172222 SMC4-MA-2 Capacity Profile of Bentonite Manufaturer-Truong Thinh.pdf
12/8/20172323 LC-0016-17 Replacement of Contractor's key Personnel.pdf
12/8/20172323 LC-16 Replacement of Contractor's key Personnel.pdf
12/26/20172323 SMC4-LC-16 Replacement of Contractor's key Personnel(new).pdf
12/8/20172424 SMC4-LT-03 Laboratory LAS-XD595 of Viet Delta Consultancy Joint Stock Company.pdf
12/8/20172424 SMC4-LT-3 Laboratory LAS-XD595 of Viet Delta Consultancy Joint Stock Company.pdf
12/11/20172525 SMC4-LC-17 Hand over GPS point and secondary tranverse benchmark for survey work.pdf
12/11/20172626 LT-0001-17 the list of apparatuses supplied for Site Laboratory ( LAS-XD 668).pdf
12/11/20172626 LT-01 The list of apparatuses supplied for Site Laboratory ( LAS-XD 668).pdf
1/9/20182626 SMC4-LT-01 Apparatuses supplied for Site Laboratory ( LAS-XD 668)(New).pdf
1/9/20182626 SMC4-LT-1 Apparatuses supplied for Site Laboratory ( LAS-XD 668)(New).pdf
12/12/20172727 SMC4-WD-02 Term of reference (TOR) for additional geological investigation.pdf
12/12/20172727 SMC4-WD-2 Term of reference (TOR) for additional geological investigation.pdf
12/12/20172828 SMC4-WD-03 Working drawing of Relocation of Existing Ultilities- Estimate quantity.pdf
12/12/20172828 SMC4-WD-3 Working drawing of Relocation of Existing Ultilities- Estimate quantity.pdf
12/12/20172929- MOT- Hand over of the GPS Points and the Secondary Control Points of the HRR3.pdf
12/13/20173030 SMC4-LO-02 Notice on Bank account for receiving Contract Payment of package 1.pdf
12/13/20173030 SMC4-LO-2 Notice on Bank account for receiving Contract Payment of package 1.pdf
12/13/20173131 SMC4-LP-01 Notice on the name of beneficiary of package 1.PDF
12/13/20173131 SMC4-LP-1 Notice on the name of beneficiary of package 1.PDF
12/14/20173232 2485-BQLDATL-DA1 Approval of Nominated Sub-Contractors for Execution of Provisional Sum Items PK1.pdf
12/14/20173232-2485-BQLDATL-DA1 Approval of Nominated Sub-Contractors for Execution of Provisional Sum Items PK1.pdf
12/14/20173333 SMC4-LP-03 Submission of Advance Payment Security.pdf
12/14/20173333 SMC4-LP-3 Submission of Advance Payment Security.pdf
12/14/20173434 SMC4-LP-02 Issuance of Power of Attorney of the Contractor's representative.pdf
12/14/20173434 SMC4-LP-2 Issuance of Power of Attorney of the Contractor's representative.pdf
12/14/20173535 SMC4-LP-04 Provide Evidence of Employer's Financial arrangement.pdf
12/14/20173535 SMC4-LP-4 Provide Evidence of Employer's Financial arrangement.pdf
12/14/20173636 SMC4-LC-18 Working drawing design Contractor.pdf
1/9/20183737 SMC4-LT-04 Capacity Profile of Site Laboratory (Las-XD668)(New).pdf
12/14/20173737 SMC4-LT-04 Capacity Profile of Site Laboratory (Las-XD668).pdf
1/9/20183737 SMC4-LT-4 Capacity Profile of Site Laboratory (Las-XD668)(New).pdf
12/14/20173737 SMC4-LT-4 Capacity Profile of Site Laboratory (Las-XD668).pdf
12/20/20173838 SMC4-LC-19 Interim payment Certificate for Advance payment(N).pdf
12/18/20173939 SMC4-LC-20 Tasks and Technical options of Topographic Survey (2nd ).pdf
12/18/20174040 SMC4-LC-21 Submission of Evidence of Insurance.pdf
12/20/20174141 SMC4-LC-22 Manpower and equipment mobilization of project center for geological and topographic investigations.pdf
12/21/20174242 SMC4-LC-23 Power of Attorney for Contractor's Superintendence (Principal Personnel).pdf
12/21/20174343 SMC4-LC-24 Capacity profile of Joint Venture of Technical and Natural Resource Co., Ltd and Hanoi Environment Investment JSC for environment monitoring work.pdf
12/21/20174444 SMC4-LC-26 Approval of Environmental Monitoring plan at pre-construction phase.pdf
12/21/20174545 SMC4-LP-05 Notice again on Bank Account for Receiving contract payment of package 1.pdf
12/21/20174545 SMC4-LP-5 Notice again on Bank Account for Receiving contract payment of package 1.pdf
12/22/20174646 SMC4-MA-03 Capacity profile of 190 steel pipes ,Sonic Tube and Tien Lam.pdf
12/22/20174646 SMC4-MA-3 Capacity profile of 190 steel pipes ,Sonic Tube and Tien Lam.pdf
12/22/20174747 SMC4-LC-25 Quality control plan(2nd Submission).pdf
12/25/20174848 SMC4-LT-05 Capacity profile of Laboratory LAS-XD595 of Viet Delta Consultancy JSC.pdf
12/25/20174848 SMC4-LT-5 Capacity profile of Laboratory LAS-XD595 of Viet Delta Consultancy JSC.pdf
12/25/20174949 SMC4-LT-06 Technical of Crushed stone quarry,yellow sand and water for ASEAN.pdf
12/25/20174949 SMC4-LT-6 Technical of Crushed stone quarry,yellow sand and water for ASEAN.pdf
12/26/20175050 SMC4-LC-27 Capacity profile of infrastructure JSC for Protection and Relocation of Existing Utilities (1).pdf
12/26/20175151 SMC4-LP-06 Submission of Evidence of insurance (2nd).pdf
12/26/20175151 SMC4-LP-6 Submission of Evidence of insurance (2nd).pdf
12/26/20175252 SMC4-LC-28 Withdraw the letter power of Attorney for contractor's Superintendence (principle personnel).pdf
12/26/20175353 SMC4-LC-29 Project Health and Safety plan (2nd).pdf
12/26/20175454 2718 BQLDATL-DA1 Approval for Replacement of Key personnel(Quality control manager and safety manager).pdf
12/27/20175555 SMC4-LC-30 Capacity profile of Thang Long Building and Experiment consulting JSC for test on concrete piles and rotation steel piles.pdf
12/28/20175656 SMC4-MA-4 Capacity profile of batching Plant Asean (2nd submission).pdf
12/28/20175757 SMC4-MA-5 Capacity profile of Nghi Son cement coporation, Cement manufacturer and Construction Material JSC of Center Region, Cement Supplier.pdf
12/28/20175858 SMC4-MA-06 Capacity profile of Truong Thinh Co., Ltd (2nd submission).pdf
12/28/20175858 SMC4-MA-6 Capacity profile of Truong Thinh Co., Ltd (2nd submission).pdf
12/28/20175959 SMC4-LC-31 Notice on New year 2018 holiday Schedule of the Contractor.pdf
12/29/20176060 2693-PMUTL-DA1 The Employer's Financial Arrangement.pdf
12/29/20176161 Minute of Handing over Benchmark for coordination and Elevation.pdf
7/25/20186262 SMC4-LC-32 Deputy Quality control manager and Deputy safety manager.pdf
12/29/20176363 SMC4-MA-7 Capacity profile of BASF Vietnam Ltd., Admixture manufacturer and Hiep An Trading & construction JSC,BASF's admixture Supplier.pdf
12/29/20176464 SMC4-LC-33-Capacity profile of Working drawing design contractor (2nd ).pdf
12/30/20176565 SMC4-LT-07 Capacity profile of laboratories of institute of Transport Science and Technology (ITST).pdf
12/30/20176565 SMC4-LT-7Capacity profile of laboratories of institute of Transport Science and Technology (ITST).pdf
12/30/20176666 SMC4-LT-08 Capacity profile of laboratories of Vietnam institute for Building science and technology (IBST).pdf
12/30/20176666 SMC4-LT-8 Capacity profile of laboratories of Vietnam institute for Building science and technology (IBST).pdf
12/30/20176767 SMC4-MS-03 Additional geological investigation plan (2 nd ).PDF
12/30/20176767 SMC4-MS-3 Additional geological investigation plan (2 nd ).PDF
1/2/20186868 Addendum No.1_PK1_full.pdf
1/3/20186969 SMC4-LP-07 Details of SMCC's Managing Executive officer.pdf
1/3/20186969 SMC4-LP-7 Details of SMCC's Managing Executive officer.pdf
1/3/20187070 SMC4-LC-34 Withdraw the letters SMC4-LC-0022 and SMC4-0011.pdf
1/3/20187171 SMC4-LP-08 Expedition of Additional Geological Investigation.pdf
1/3/20187171 SMC4-LP-8 Expedition of Additional Geological Investigation.pdf
1/4/20187272 SMC4-MA-8 Capacity profile of Batching plant Transmeco.pdf
1/4/20187373 SMC4-WD-04 Technical Clarification to the Employer's Drawing.pdf
1/4/20187373 SMC4-WD-4 Technical Clarification to the Employer's Drawing.pdf
1/4/20187474 SMC4-MS-04 Method statement of Bored pile Diameter D=1.2M.pdf
1/4/20187474 SMC4-MS-4 Method statement of Bored pile Diameter D=1.2M.pdf
1/4/20187575 SMC4-LC-35 Capacity profile of TSP service and trading construction JSC for Traffic control.pdf
1/5/20187676 SMC4-MA-10 Capacity of Vietnam-Japan Steel and Thien Ma JSC.pdf
1/5/20187777 SMC4-LC-36 Environment Management plan.pdf
1/5/20187878 SMC4-MA-09 Capacity of Vietnam Germany steel and VPA Group.pdf
1/5/20187878 SMC4-MA-9 Capacity of Vietnam Germany steel and VPA Group.pdf
1/8/20187979 SMC4-MS-02 General traffic control plan for Construction project.pdf
1/8/20187979 SMC4-MS-2 General traffic control plan for Construction project.pdf
1/9/20188080 SMC4-LP-09 Method of Traffic control and Girder Transportation(N.pdf
1/9/20188080 SMC4-LP-9 Method of Traffic control and Girder Transportation(N.pdf
1/8/20188181 104-BQLDATL Meeting to review the project implementation.pdf
1/8/20188282 SMC4-LC-0037 Clarification of Drainage system design drawings and Highway.pdf
1/8/20188282 SMC4-LC-37 Clarification of Drainage system design drawings and Highway.pdf
1/9/20188383 SMC4-38 manpower and equipment mobilization of the Team for geological and topographic.pdf
1/9/20188484 SMC4-39 Manpower and equipment mobilization of the team 1 for bored pile and Super T girder.pdf
1/9/20188585 SMC4-LC-040 Capacity profile of Subcontractor 479 JSC.pdf
1/9/20188585 SMC4-LC-40 Capacity profile of Subcontractor 479 JSC.pdf
1/9/20188686 SMC4-LT-09 Capacity profile of Laboratory LAS-XD71-VILAS-932.pdf
1/10/20188787 SMC4-MA-11 Capacity profile of Manufacturer and supplier of Sonic Tube (2nd Submission).pdf
1/11/20188888 SMC4-RP-01 GPS Benchmarks Survey Report.pdf
1/11/20188888 SMC4-RP-1 GPS Benchmarks Survey Report.pdf
1/11/20188989 SMC4-RP-02 Benchmark Analytic Grade 1 Report.pdf
1/11/20188989 SMC4-RP-2 Benchmark Analytic Grade 1 Report.pdf
1/11/20189090 SMC4-LC-41 Gradation for Coarse aggregate for Concrete Class A.pdf
1/11/20189191 149 GM-BQLDATL Meeting Invitation on 15 Jan.2018.pdf
1/13/20189292 SMC4-MS-05 Method statement of Arrangement of Temporary facilities on site.pdf
1/13/20189292 SMC4-MS-5 Method statement of Arrangement of Temporary facilities on site.pdf
1/13/20189393 SMC4-LC-42 Geological and topographic investigations(2nd).pdf
1/15/20189494 SMC4-LT-10 Capacity profile of Laboratories of ITST(2nd).pdf
1/15/20189595 SMC4-MA-12 Technical Proofile of crushed stone quarry,Yellow sand and water for Asean Batching(2nd).pdf
1/15/20189696-SMC4-LT-11 Capacity profile of Laboratories of IBST(2nd).pdf
1/15/20189797 SMC4-MS-06 General Traffic control plan for construction project(2nd).pdf
1/15/20189797 SMC4-MS-6 General Traffic control plan for construction project(2nd).pdf
1/16/20189898 SMC4-LP-10 Clarification on the removal of cable line of Widending Project at Pier P26 and P39.pdf
1/16/20189999 SMC4-MA-13 Capacity profile of cement Manufacturer and Supplier (2nd ).pdf
1/16/2018100100 SMC4-SC-01 Capacity profile of the Subcontractor 482 JSC.pdf
1/16/2018100100 SMC4-SC-1 Capacity profile of the Subcontractor 482 JSC.pdf
1/16/2018101101 SMC4-SC-02 Capacity profile of the Subcontractor Construction and Trading JSC 423.pdf
1/16/2018101101 SMC4-SC-2 Capacity profile of the Subcontractor Construction and Trading JSC 423.pdf
1/17/2018102102 SMC4-MS-10 Proposal for approval of additional geological investigation plan (3rd ).pdf
1/17/2018103103 SMC4-SC-03 Capacity profile of the Subcontractor 475 JSC.pdf
1/17/2018103103 SMC4-SC-3 Capacity profile of the Subcontractor 475 JSC.pdf
1/17/2018104104 SMC4-SC-04 Document of manpower and equipment mobilization of the sub-contractor 482 JSC for construction from P32 to P35.pdf
1/17/2018104104 SMC4-SC-4 Document of manpower and equipment mobilization of the sub-contractor 482 JSC for construction from P32 to P35.pdf
1/18/2018105105 SMC4-SC-05 Capacity Profile of Thang Long Bridge No.7 JSC.pdf
1/18/2018105105 SMC4-SC-5 Capacity Profile of Thang Long Bridge No.7 JSC.pdf
1/16/2018106106 SMC4-MS-07 Method statement for coring and concrete testing at pile tip.pdf
1/16/2018106106 SMC4-MS-7 Method statement for coring and concrete testing at pile tip.pdf
1/16/2018107107 SMC4-MS-08 Method Statement for ultra sonic testing of piles.pdf
1/16/2018107107 SMC4-MS-8 Method Statement for ultra sonic testing of piles.pdf
1/18/2018108108 SMC4-MS-09 Method statement for trial excavation of bored pile.pdf
1/18/2018108108 SMC4-MS-9 Method statement for trial excavation of bored pile.pdf
1/17/2018109109 SMC4-MS-11 Traffic control method statement for additional soil investigation (2nd ).pdf
1/18/2018110110 SMC4-MA-14 Capacity Profile of Manufacturer and Supplier for material for traffic control item-TSP Service and Trading construction JSC.pdf
1/18/2018111111 SMC4-LC-43 Manpower and Equipment Mobilization for construcion (P13 to P22).pdf
1/18/2018112112 SMC4-LC-44 Document of manpower and equipment mobilization of the team 3 for construction from P23 to P27.pdf
1/18/2018113113 Meeting Minutes (Agreement on Implementation of Additional geological investigation).pdf
1/19/2018114114 SMC4-LT-13 Capacity profile of laboratory LAS-XD 668 (2nd submission).pdf
1/19/2018115115 SMC4-MA-16 Approval of trial mixing work of concrete proportions class , E and Y.pdf
1/19/2018116116 SMC4-MA-15 Capacity profile of Mighty Admixture Manufacturer and Supplier.pdf
1/19/2018117117 SMC4-MC-1-18-Interim Payment Certificate Form.pdf
1/19/2018118118 SMC4-LT-12 Capacity proffile of LAS-XD 595 of Viet Delta Consultancy JSC (3rd.pdf
1/19/2018119119 SMC4-LC-45 Clarification location of borehole log in Contract Documents.pdf
1/19/2018120120 SMC4-MS-12 General Traffic control plan for Construction Project.pdf
1/19/2018121121 264-BQLDATL-DA1 Alternative of Fencing for Traffic control.pdf
1/19/2018122122 SMC4-LP-12 Announcement of Budget plan for the year 2018.pdf
1/20/2018123123 SMC4-SC 06 Document of Vinh Quynh Disposal Area.pdf
1/20/2018123123 SMC4-SC-6-18 Document of Vinh Quynh Disposal Area.pdf
1/22/2018124124 SMC4-LC-46 Notice on Tet Holiday Schedule of the contractor.pdf
1/22/2018125125 SMC4-LP-13 Request Clarifying items Relocation of Utilities & Demolition overlapped by two projects.pdf
1/22/2018126126 SMC4-MA-17 Capacity profile of Nghi Son cement manufacturer and supplier (3rd).pdf
1/22/2018127127 SMC4-MA-18 Capacity profile of batching plant Transmeco (2nd submission).pdf
1/23/2018128128 SMC4-MS-13 Method statement for grouting of sonic tube of bored pile.pdf
1/23/2018128128 SMC4-MS-13-18-Method statement for grouting of sonic tube of bored pile.pdf
1/23/2018129129 196 TB-BQLDATL Conclusions by PMU Thang Long on implementation progress & Schedule of PK1.pdf
1/24/2018130130 274-TB-BQLDATL Conclusions given by PMUTL at Meeting on reviewing of implementation of MD-STL Section.pdf
1/24/2018131131 SMC4-LP-14 Clarify completion and handing over schedule of Ring Road No.3 Widening Project - MD-STL Section.pdf
1/25/2018132132 SMC4-MA-19 Technical profile of crushed stone quarry, yellow sand and water for ASEAn batching plant (3rd Sub.).pdf
1/25/2018132132-MA-19 Technical profile of crushed stone quarry, yellow sand and water for ASEAn batching plant (3rd Sub.).pdf
1/25/2018133133 SMC4-MA-20 Capacity profile of reinforcing steel manufacturer and supplier VGS-VPA (2nd Sub.).pdf
1/25/2018133133-MA-20 Capacity profile of reinforcing steel manufacturer and supplier VGS-VPA (2nd Sub.).pdf
1/25/2018134134 SMC4-LC-47 Adjustment of Plan and Schedule of additional geological investigation.pdf
1/25/2018135135 SMC4-LC-48 Form of construction diary.pdf
1/25/2018135135-LC-48 Form of construction diary.pdf
1/26/2018136136 SMC4-LC-49 Adjusted schedule, site organization layout and document of additional manpower and equipment for soil investigation.pdf
1/26/2018137137 353-BQLDATL-DA1 Main Acceptance Procedures during Construction Period.pdf
1/26/2018138138 SMC4-LC-50 Manpower and equipment mobilization of Team 4 for abutment construction from A1 to P5.pdf
1/26/2018139139 SMC4-RP-03 Report of environmental monitoring at pre-construction phase.pdf
1/26/2018139139 SMC4-RP-3 Report of environmental monitoring at pre-construction phase.pdf
1/27/2018140140 SMC4-LT-14 Capacity profile of Laboratory LAS-XD71-VILAS- 932 (2nd submission).pdf
1/27/2018141141 SMC4-MA-21 Technical profile of crushed stone quarry, yellow Sand & water -TRANSMECO Batching Plant.pdf
1/30/2018142142 SMC4-LC-51 Environmental Management Plan (2nd.pdf
1/30/2018143143 SMC4-MA-23 Adjust Document of Mix design concrete class A,E & Y in accordance with the material test result.pdf
1/30/2018144144 SMC4-RP-4 Report on checking benchmark system GPS of Packages 01,02(n).pdf
1/30/2018145145 SMC4-LC-52 Capacity profile of working drawing design Contractor (3rd).pdf
1/30/2018146146 SMC4-MA-22 Coarse aggregate for design of concrete class A.pdf
2/1/2018147147 398-PMUTL-DA1 The Employer's Financial Arrangement (2018 Budgdet Plan).pdf
2/1/2018148148 SMC4-MA-24 Capacity profile of Transport Materials Equipment Trading JSC-supplier for PC strand.pdf
2/2/2018149149 SMC4-MA-25 Report on testing results of Bentonite Material for Bored Pile.pdf
2/5/2018150150 SMC4-LC-53 Form of Construction Diary (2nd Sub).pdf
2/5/2018151151 SMC4-RP-05 Report on actual condition of Existing utilities (on ground)-Step 1.pdf
2/5/2018151151 SMC4-RP-5 Report on actual condition of Existing utilities (on ground)-Step 1.pdf
2/6/2018152152 482-BQLDATL-KTTD Construction Organization and Strengthening of Traffic Safety,Labor safety and Environmental hygiene on the Site.pdf
2/6/2018153153 SMC4-LC-55 Request for the clarification for the location of borehole log in contract documents(2nd).pdf
5/15/2018154154 SMC4-MA-25A Report on testing results of Sonic tube material for Bored pile.pdf
2/6/2018155155 SMC4-LC-54 Construction plan of Contractor pk1 and some unclear matters need clarifying with HRR3 Widening Project.pdf
2/7/2018156156 SMC4-LC-58 Locations and Details design of Project information Signs Board.pdf
2/8/2018157157 SMC4-LC-56 Request for the Clarifications of the Contract Drawings.pdf
2/8/2018158158 SMC4-LC-57 Clarifications of Clearance of urban road under bridge in the Contract Drawings.pdf
2/8/2018159159 SMC4-LC-59 Withdrawal of the letter SMC4-RP-0005-2018 Date 5.2.2018.pdf
2/8/2018160160 SMC4-LC-60 Confirmation of actual Existing Utilities' Survey Date (on ground)-step 1.pdf
2/9/2018161161 550-PMUTL-DA1 Preparation of construction plan and Schedule for Package 1 and Package 2.pdf
2/9/2018162162 SMC4-LC-61 Confirmation of Actual Existing Trees; Survey Data P4 to P16 (Km0+487.9-Km0+967.9).pdf
4/16/2018163163 SMC4-MA-27 Capacity profile of Reinforcing steel manufacturer Hoa Phat Steel One Member Ltd and Kyoei Steel VietNam Company.pdf
2/9/2018164164 SMC4-MA-26 Mix Proportion for Trial Mix at Batching Plant Asean (Class B1,C1,C3,C4,D and G) (1st).pdf
2/9/2018165165 SMC4-LT-15 Inspection Minute of Laboratory LAS-XD 71-VILAS 932.pdf
2/10/2018166166 SMC4-MA-28 Report on testing results of Basf Admixture for cement concrete.pdf
2/10/2018167167 SMC4-MA-29 R3,R7 Concrete compressive Strength test Result of Concrete class A, E & Y for Asean Batching plant Mixes at Laboratory.pdf
2/22/2018168168 SMC4-SC-7 Supplement documents for Capacity Profile of Thang Long Bridge No.7JSC.pdf
4/12/2018169169 SMC4-LC-62 Supplemental Manpower and equipment Mobilization document of Team 3(2nd ).pdf
2/22/2018170170 SMC4-LC-63 Supplemental Manpower and equipment Mobilization document of Team 1(2nd ).pdf
2/23/2018171171 SMC4-MA-30 Manufacturer and Supplier of PC Strand Guizhou Wire Rope Incorporated company-TRAMECO.pdf
2/23/2018172172 SMC4-LC-64 Manpower and equipment by team for Koden Test of Bored Pile.pdf
2/26/2018173173 SMC4-LC-65 Construction Schedule of package 1.pdf
2/27/2018174174 SMC4-LP-11 Provision of Calculation Sheet document.pdf
2/27/2018175175 SMC4-LC-67 Additional Request for Clarifications of Contract Drawings.pdf
2/28/2018176176 SMC4-LC-66 Supplemental manpower and equipment mobilization of team 2 (2nd ).pdf
2/28/2018177177 SMC4-MC-02 Interim Payment Certificate Form (2nd Submission).pdf
3/1/2018178178 SMC4-MA-31 Report on testing results of Crushed Stone,Yellow Sand and Water for Batching Plant ASEAN.pdf
3/16/2018179179 SMC4-LC-68 Supplemental Manpower and equipment mobilization document of Team 4(2nd ).pdf
3/3/2018180180 SMC4-SC-08 Proposal for document of Nguyen Khe Disposal site.pdf
3/3/2018181181 SMC4-SC-09 Supplement document of Construction and Trading JSC 423 Capacity Profile.pdf
3/3/2018182182 SMC4-SC-10 Supplement document of Joint Stock Company 479 Capacity Profile.pdf
3/3/2018183183 SMC4-MA-32 Report on testing results of Cement Nghi Son.pdf
3/5/2018184184 SMC4-RP-06 Report on Environmental Monitoring at Pre-Construction Phase (2nd).pdf
3/7/2018185185 SMC4-MA-33 Report on trial mix of concrete class A of Asean Batching Plant mixed at Laboratory.pdf
3/7/2018186186 SMC4-LC-69 Cutting and Pruning Trees from P4 To P16 (Km0+487.9-Km0+967.9).pdf
3/9/2018187187 SMC4-LC-70 Notice of Leave for our Key Personnel (Project Manager.pdf
4/6/2018188188 SMC4-MA-34 Capacity profile of Manufacturer and Supplier for traffic control material (TSP)(2nd ).pdf
3/12/2018189189 SMC4-MA-35 Technical profile of Crushed Stone quarry,Yellow sand and water for TRANSMECO Batching Plant (2nd).pdf
3/12/2018190190 SMC4-LC-71 Notice for Location of Fabrication Yard of Super T girder No.1.pdf
4/9/2018191191 SMC4-LC-72 Proposal for approval of Project information Signs(2 nd Submission).pdf
3/13/2018192192 119-GM-BQLCTGT Invitation-Site inspection & Survey of water transmission pipeline D800 and others existing under embankment of Pham Van Dong Road.pdf
3/13/2018192192-119-GM-BQLCTGT Invitation-Site inspection & Survey of water transmission pipeline D800 and others existing under embankment of Pham Van Dong Road.pdf
3/13/2018193193 843-GM-BQLDA1 Meeting Invitation-Implementation & Construction of PK1 & PK2.pdf
3/13/2018193193-843-GM-BQLDA1 Meeting Invitation-Implementation & Construction of PK1 & PK2.pdf
3/14/2018194194 SMC4-MA-36 Grout Material used for Sonic tube and PC.pdf
3/14/2018195195 SMC4-MA-37 Capacity profile of reinforcing steel manufacturer & supplier (vietnam italy steel JSC; VPA Group JSC).pdf
3/14/2018196196 SMC4-SC-11 Manpower and equipment mobilization of the sub-contractor TSP for Traffic Control.pdf
3/14/2018197197 SMC4-MA-38 Capacity profile of Dong-il steel MFG.Co & Vinh Hung JSC (PC Strand Manufacturer & Supplier).pdf
3/14/2018198198-867-GM-BQLDATL-Invitation- Implementation and construction of PK1 & Pk2.pdf
3/15/2018199199 SMC4-LC-73 Terms of Reference and cost Estimate for Environmental Monitoring Item.pdf
3/16/2018200200 SMC4-SC-12 Mobilization of Manpower & equipment by the Infrastructure JSC for Protection & Relocation of Existing Utilites works.pdf
3/15/2018201201 SMC4-LC-74 Proposals on Steel plate in girder, for Grading and Bearing pad.pdf
3/16/2018202202 SMC4-LC-75 Manpower and Equipment Mobilization document of ASEAN Batching plant for concrete supplying.pdf
3/19/2018203203 SMC4-LC-076 Report on the affected area of the existing water supply D800mm during construction of Viaduct.pdf
3/19/2018203203 SMC4-LC-76 Report on the affected area of the existing water supply D800mm during construction of Viaduct.pdf
3/19/2018204204 SMC4-MA-39 capacity Profile of North Binh Minh Plastics Co.,Ltd, & Tien Lam Material JSC-PVC pipe material Manufacturer & supplier .pdf
3/19/2018205205 SMC4-RP-07 Report on additional geoglgical investigation stage 1.pdf
4/3/2018206206 SMC4-LC-0079 Proposal for approval of Contractor's Programme.pdf
4/3/2018206206 SMC4-LC-79 Proposal for approval of Contractor's Programme.pdf
3/21/2018207207 SMC4-WD-0007 Proposal for Approval of General View of Main Bridge & Ramp HQV-B (2nd).pdf
3/21/2018207207 SMC4-WD-0007 Proposal for Approval of General View of Main Bridge and Ramp HQV-B (2nd).pdf
3/21/2018207207 SMC4-WD-07 Proposal for Approval of General View of Main Bridge and Ramp HQV-B (2nd).pdf
3/21/2018208208 SMC4-WD-06 Working drawing of Cast-in-place concrete pile for piers P22, P31.pdf
3/21/2018209209 SMC4-LC-0078 Adjustment of Coupler Position & Rebar Length of Super-T Girder for Crossbeams.pdf
3/21/2018209209 SMC4-LC-78 Adjustment of Coupler Position & Rebar Length of Super-T Girder for Crossbeams.pdf
3/21/2018210210 SMC4-LC-0077 Calculation Sheet for Soil Bearing capacity of bored pile and pre-cast pile based on additional Geological investigation report.pdf
3/21/2018210210 SMC4-LC-77 Calculation Sheet for Soil Bearing capacity of bored pile and pre-cast pile based on additional Geological investigation report.pdf
3/22/2018211211 SMC4-MS-0014 Method statement for Trial Excavation of Bored Pile (2 nd).PDF
3/22/2018211211 SMC4-MS-14 Method statement for Trial Excavation of Bored Pile (2 nd).PDF
3/19/2018212212 920-GM-BQLDATL-Meeting Invitation- Implementation and construction of PK1 & Pk2.pdf
3/19/2018212212-920-GM-BQLDATL-Meeting Invitation- Implementation and construction of PK1 & Pk2.pdf
3/22/2018213213 SMC4-MS-15 Method statement for Production of Super T girder.pdf
3/13/2018214214 831-PMUTL-DA1 Implementation of Environmental Monitoring in Package 1 and Package 2.pdf
3/13/2018214214-831-PMUTL-DA1 Implementation of Environmental Monitoring in Package 1 and Package 2.pdf
3/22/2018215215 Site Minutes 20.03.2018.pdf
3/22/2018215215-Site Minutes 20.03.2018.pdf
3/22/2018216216 962-PMUTL-DA6-Construction Diary.pdf
3/22/2018216216-962-PMUTL-DA6-Construction Diary.pdf
3/24/2018217217 SMC4-MS-0016 Method Statement of Bored Pile Diameter D=1.2m(2nd).pdf
3/24/2018217217 SMC4-MS-16 Method Statement of Bored Pile Diameter D=1.2m(2nd).pdf
4/5/2018218218 - SMC4-MA-0040 Report on test Result of Reinforcing Steel of Vietnam Germany Steel Mill JSC (VGS).pdf
3/24/2018218218 SMC4-MA-0040 Report on test Result of Reinforcing Steel of Vietnam Germany Steel Mill JSC (VGS).pdf
3/24/2018218218 SMC4-MA-40 Report on test Result of Reinforcing Steel of Vietnam Germany Steel Mill JSC (VGS).pdf
4/5/2018218218 SMC4-MA-40 Test Result of Reinforcing Steel of Vietnam Germany Steel Mill JSC (VGS).pdf
3/24/2018219219 SMC4-MA-0041 Test result of PC Strand 15.2 of Guizhou Wire Rope Incorporated company.pdf
3/24/2018219219 SMC4-MA-41 Test result of PC Strand 15.2 of Guizhou Wire Rope Incorporated company.pdf
3/26/2018220220 1007-PMUTL-DA1-Relocation of some Utilities in the Project.pdf
3/26/2018220220-1007-PMUTL-DA1-Relocation of some Utilities in the Project.pdf
3/26/2018221221 1021-PMUTL-DA6 Checking Project Benchmark Data.pdf
3/27/2018222222 SMC4-MA-0042 Manufaturer's Capacity Profile of U-clip Coupler and Steel plate for grading Vinh Thuc Co Ltd.pdf
3/27/2018222222 SMC4-MA-42 Manufaturer's Capacity Profile of U-clip Coupler and Steel plate for grading Vinh Thuc Co Ltd.pdf
3/28/2018223223 SCM4-MS-17 Traffic control plan for construction at sections P9-P16 and P29-P37.pdf
3/28/2018223223- SCM4-MS-0017-Traffic control plan for construction at sections P9-P16 and P29-P37.pdf
3/28/2018224224 SMC4-LC-80 Method Statement of Traffic control plan for Construction at sections P9-P16 and P29-37.pdf
3/28/2018224224-SMC4-LC-080-Method Statement of Traffic control plan for Construction at sections P9-P16 and P29-37.pdf
3/29/2018225225 SMC4-LP-15 Provision of designed drawing of Widening Project and revised drawing of drainage system.pdf
3/29/2018225225-SMC4-LP-0015-Provision of designed drawing of Widening Project and revised drawing of drainage system.pdf
4/14/2018226226 SMC4-MS-18 Method statement of temporary facilities arrangement at P9-P16 and P29-P37.pdf
3/29/2018226226- SMC4-MS-0018-Proposal for method statement of temporary facilities arrangement at P9-P16 and P29-P37.pdf
4/14/2018226226-SMC4-MS-0018-Method statement of temporary facilities arrangement at P9-P16 and P29-P37.pdf
3/29/2018227227 SMC4-LC-81 Mobilization for manpower & equipment by SubContractor Thanh Long JSC for pile test.pdf
3/29/2018227227-SMC4-LC-0081-Mobilization for manpower & equipment by SubContractor Thanh Long JSC for pile test.pdf
3/30/2018228228 SMC4-MS-0019 Method statement of Demolition and Relocation of Existing Utilities (stage 1).pdf
3/30/2018228228 SMC4-MS-19 Method statement of Demolition and Relocation of Existing Utilities (stage 1).pdf
3/30/2018229229 SMC4-LP-0016 Submission of Contractor's Plan until 30th April 2018.pdf
3/30/2018229229 SMC4-LP-16 Submission of Contractor's Plan until 30th April 2018.pdf
3/31/2018230230 SMC4-MA-43 Technical Profile of yellow sand pit for cement Concrete.pdf
4/4/2018231231 SMC4-WD-09 Working drawing of cast-in-place concrete pile for pier P29,P30.pdf
4/4/2018232232 SMC4-WD-010 WD of demolition & Removal of Existing Utilities for concrete blocks at Median and Lighting system.pdf
4/4/2018232232 SMC4-WD-10 WD of demolition & Removal of Existing Utilities for concrete blocks at Median and Lighting system.pdf
4/4/2018233233 SMC4-WD-08 Working drawing of test pile of Pre-cast concrete pilling for Retaining wall of Ramp HQV-B.pdf
4/4/2018234234 SMC4-LC-82 Proposal for changing road pavement structure for traffic control.pdf
4/5/2018235235 1191-GM-BQLDATL Meeting Invitation.pdf
4/5/2018235235-1191-GM-BQLDATL Meeting Invitation.pdf
4/5/2018236236 255-TB-SGTVT Notice on Traffic Organization and Traffic Lane Distribution on Pham Van Dong Road.pdf
4/5/2018236236-255-TB-SGTVT Notice on Traffic Organization and Traffic Lane Distribution on Pham Van Dong Road.pdf
4/5/2018237237 Working Minutes - Agreement on Implementation Areas between Two Projects - Copy.pdf
5/5/2018238238 SMC4-MS-0020 Method statement for Temporary facilities on site from Pier P9 to P16 and from Pier P29 to P37 - Copy.pdf
5/5/2018238238 SMC4-MS-20 Method statement for Temporary facilities on site from Pier P9 to P16 and from Pier P29 to P37 - Copy.pdf
4/5/2018239239 SMC4-LC-0083 Proposal for Environmental control plan.(3rd Submission ).pdf
4/5/2018239239 SMC4-LC-83 Environmental control plan.(3rd Submission ).pdf
4/7/2018240240 SMC4-MA-44 Capacity Profile of Bentonite Manufacturer Hung Ngoc Produce and Trading Company Limited.pdf
4/10/2018241241 SMC4-WD-11 Working drawing of cast-in-place concrete pile for pier P36,P37.pdf
4/11/2018242242 SMC4-LC-84 Terms of Reference and cost Estimate for Environment Monitoring item(2nd submission).pdf
4/11/2018243243 SMC4-LC-85 Adjustment of the rebar length of Super T Girder for Crossbeams Construction.pdf
4/11/2018244244 1250-PMUTL-DA1 Quick completion of Preparation work and Expedition of Implementation.pdf
4/11/2018245245 Working Minutes on hand-over and take-over of the site & preparation of fencing work (stage 1).pdf
4/11/2018245245-Working Minutes on hand-over and take-over of the site & preparation of fencing work (stage 1).pdf
4/12/2018246246 202-GM-BQLCTGT- Meeting Invitation- Water Transmission Pipeline D800.pdf
4/12/2018247247 1299-PMUTL-DA1-Change Name of PMD1 and PMD6.pdf
4/12/2018248248 SMC4-MA-45 Capacity profile of PC duct manufacturer Ngoc Lam Company.pdf
4/12/2018248248 SMC4-MA-45-Proposal for capacity profile of PC duct manufacturer Ngoc Lam Company.pdf
4/12/2018249249 SMC4-LC-0086 Withdraw the letter Regarding Proposal for changing road pavement Structure for traffic control.pdf
4/12/2018249249 SMC4-LC-86 Withdraw the letter Regarding Proposal for changing road pavement Structure for traffic control.pdf
4/12/2018250250 SMC4-MA-0046 capacity profile of Hoa Phat Steel and Kyoei Vietnam Manufacturer and Supplier (2nd).pdf
4/12/2018250250 SMC4-MA-46 Capacity profile of Hoa Phat Steel and Kyoei Vietnam Manufacturer and Supplier (2nd).pdf
4/16/2018251251 SMC4-RP-0008 Report on additional geoglogical investigation stage 1 (2 Submission).pdf
4/16/2018251251 SMC4-RP-08 Additional geoglogical investigation stage 1 (2 Submission).pdf
4/11/2018252252 1259 GM-BQLDATL Invitation for Site Visit.pdf
4/16/2018253253 SMC4-WD-12 WD of Demolition and Removal of Existing Utilities for concrete blocks at Median and Lighting system (2nd).pdf
4/24/2018254254 SMC4-RP-9 Benchmark Analytic Grade 1 Report (2nd Submission).pdf
4/19/2018255255 SMC4-MS-21 Method statement for trial Excavation of Confirmation the Underground Utilities(repair.PDF
4/20/2018256256 SMC4-MS-22 Traffic control method for public roads for construction P29-37.pdf
5/15/2018257257 SMC4-MS-23 Method statement of Bored pile Diameter D=1.0m.pdf
4/21/2018258258 SMC4-MA-48 Report on testing results of Yellow Sand Lo River for Ceement Concrete.pdf
4/21/2018259259 SMC4-MA-49 Mix Proportion for Trial Mix Class C1,3 ,4 (slump 13+2.5 cm) and D(Slump 10+2.5cm at Batching plant Asean.pdf
4/21/2018260260 SMC4-MA-50 Mix Proportion for Trial Mix class A,B1,C1,C3,C4,D,E,G and Y at Batching plant TRANSMECO.pdf
4/21/2018261261 SMC4-MA-47 Testing Results of Crushed Stone and Water for Batching Plant TRANSMECO.pdf
4/23/2018262262 SMC4-MA-51 Capacity Profile of Manufacturer and Supplier for Vietnam-Italy Reinforcing steel Bar(VIS) (2nd ).pdf
4/26/2018263263 SMC4-LC-87 Proposal for Confirmation and Handing over of Existing Utilities on Pham Van Dong Street for construction at P9-P16 and P29-P37.pdf
4/26/2018264264 SMC4-LC-86 Notice on National Holiday Schedule (South Liberation Day and Labor Day) of The Contractor.pdf
4/26/2018265265 1523-PMUTL-DHDA1 Invitation Salvage of Asset on Pham Van Dong Road.pdf
4/26/2018266266 1524-PMUTL-DHDA1 Invitation Salvage of Asset on Pham Van Dong Road.pdf
4/26/2018267267 4157-BGTVT-CQLXD Request for Coordination & Instruction for Expedition of implementation progress of Project.pdf
4/26/2018268268 SMC4-MA-52 Capacity profile of Manufacturer for U-clip coupler and steel plate for gradingVinh Thuc (2nd).pdf
4/27/2018269269 Working Minutes -Agreement on Inventory and Method of salvage.pdf
4/27/2018270270 SMC4-MA-24 Method statement for Ultrasonic test,tip contract checking test,Static loading test and Dynamic test (PDA) ...pdf
4/27/2018270270 SMC4-MS-24 Ultrasonic test,tip contract checking test,Static loading test and Dynamic test (PDA) ...pdf
4/27/2018271271 1558-PMUTL-DHDA1 Invitation Site Hand-over.pdf
4/27/2018272272 1557 PMUTL-DHDA1 Expedition of Implementation Progress.pdf
4/27/2018272272-1557 PMUTL-DHDA1 Expedition of Implementation Progress.pdf
5/3/2018273273 SMC4-MA-53 Capacity Profile of Manufacturer and Supplier for PVC Pipe material (2nd).pdf
5/3/2018274274 SMC4-LP-17 Propose to Support the contractor in installation of Project information Signs and Temporary electric poles for construction work.pdf
5/3/2018274274 SMC4-LP-17 Support the contractor in installation of Project information Signs and Temporary electric poles for construction work.pdf
5/3/2018275275 Working Mintutes date 2.5.18.pdf
5/3/2018276276 248 GM-BQL-CTGT INVITATION Date 4.5.18.pdf
5/4/2018277277 SMC4-MA-54 Capacity Profile of Manufacturer and Supplier for Bentonite Pil-0-Gel.pdf
5/5/2018278278 1612 PMUTL-DHDA1 Erection of Project information Sign.pdf
5/22/2018279279 SMC4-LC-88 Changing of steel plate in girder and Steel plate for Grading (2nd).pdf
5/7/2018280280 Minutes of Handing Over Section Pier P9-P16,P29-P37.pdf
5/16/2018281281 SMC4-MA-55 Trial mix of concrete class A,B1,E,G,Y of ASEAN Batching plant.pdf
5/8/2018282282 SMC4-MS-25 Layout of traffic control for construction at Section P29-P27.pdf
5/8/2018283283 256-GM-BQL-CTGT Invitation for Site Handover date 10.5.18.pdf
5/8/2018284284 SMC4-LP-18 Speed up the preparation work before land handing over.pdf
5/8/2018285285 SMC4-LC-89 Equipment Mobilization of the Team 4.pdf
5/8/2018286286 SMC4-MA-56 Test result of PC Strand 15.2 of Guizhou Wire Rope Incorporated.pdf
5/9/2018287287 Working Minutes date 7.5.18.pdf
5/16/2018288288 SMC4-LC-90 Approval of Thanh Long Group JSC Capacity Profile.pdf
5/22/2018289289 SMC4-LC-91 Confirmation of actual underground existing utilities survey - stage 1.pdf
5/22/2018289289- SMC4-LC-0091-Confirmation of actual underground existing utilities survey - stage 1.pdf
5/18/2018290290 SMC4-LC-92 Reply to the Engineer's letter regarding TOR and Cost Estimate of Enviroment Monitoring Item.pdf
5/18/2018291291 SMC4-LC-93 Repply to the Engineer's letter regarding Enviromental Control Plan - Copy.pdf
5/18/2018292292 SMC4-LC-0094 Cost Estimate for Test on concrete piles Cast -in - Place Concrete Piles and RC 35x35 cm.pdf
5/18/2018292292 SMC4-LC-94 Cost Estimate for Test on concrete piles Cast -in - Place Concrete Piles and RC 35x35 cm.pdf
5/16/2018293293 SMC4-LC-0095 Enviromental Monitoring Additional at Pre-Construction phase.pdf
5/16/2018293293 SMC4-LC-95 Enviromental Monitoring Additional at Pre-Construction phase.pdf
5/15/2018294294 1747PMUTL-DHDA1-Execution of the Works of PK1 MD-CN Section (Km0+3--Km2+812.5).pdf
5/18/2018295295 SMC4-RP-0010-Report on topographic survey from Km0+660-Km1+000 and Km1+540-Km1+910.pdf
5/18/2018295295 SMC4-RP-10 Topographic survey from Km0+660-Km1+000 and Km1+540-Km1+910.pdf
5/18/2018296296 SMC4-LC-0096-Withdrawal of the letter SMC4-LC-0089 dated 8 May 2018.pdf
5/18/2018296296 SMC4-LC-96 Withdrawal of the letter SMC4-LC-0089 dated 8 May 2018.pdf
5/18/2018297297 SMC4-LC-0097-Proposal for 1st documen for additional equipment mobilization of team 1.pdf
5/18/2018297297 SMC4-LC-97 1st document for additional equipment mobilization of team 1.pdf
5/21/2018298298 SMC4-LC-0098-Proposal for approval of environmental control plan (4th submission).pdf
5/21/2018298298 SMC4-LC-98 Environmental control plan (4th submission).pdf
5/18/2018299299 SMC4-MS-0026-Proposal for method statement of traffic control at P29-P37 Lighting system (2nd).pdf
5/18/2018299299 SMC4-MS-26 Traffic control at P29-P37 Lighting system (2nd).pdf
5/17/2018300300 SMC4-MA-0057-Report on test result of reinforcing steel of kyoei steel Vietnam Company Limited and Hoa Phat Hai Duong Steel JSC.pdf
5/17/2018300300 SMC4-MA-57 Test result of reinforcing steel of kyoei steel Vietnam Company Limited and Hoa Phat Hai Duong Steel JSC.pdf
5/18/2018301301 SMC4-LC-0099-Proposal for TOR and cost estimate for Protection and relocation Utilities at P26-P37.pdf
5/18/2018301301 SMC4-LC-99 TOR and cost estimate for Protection and relocation Utilities at P26-P37.pdf
5/22/2018302302 SMC4-LC-0100-Proposal for approval of documetn of 1st additional equipment of team 4.pdf
5/22/2018302302 SMC4-LC-100 Document of 1st additional equipment of team 4.pdf
5/18/2018303303 SMC4-LC-0101-Proposal for approval of breakdown for lump sum items.pdf
5/18/2018303303 SMC4-LC-101 Breakdown for lump sum items.pdf
5/18/2018304304 SMC4-RP-0011-Report on survey on existing trees condition from P4-P16.pdf
5/30/2018304304 SMC4-RP-11 Survey on existing trees condition from P4-P16.pdf
5/19/2018305305 SMC4-LC-0102-Proposal for approval of TOR and cost estimate for traffic control stage 1 at P29-P37.pdf
5/19/2018305305 SMC4-LC-102 TOR and cost estimate for traffic control stage 1 at P29-P37.pdf
5/21/2018306306 Minutes of Site Hand-Over (Stage 1).pdf
5/21/2018307307 SMC4-LC-0103-Submission of weekly report No.1.pdf
5/26/2018307307 SMC4-LC-103 Submission of weekly report No.1.pdf
5/21/2018308308 SMC4-LC-0104-Traffic control plan for construction at sections A1-P4.pdf
5/21/2018308308 SMC4-LC-104 Traffic control plan for construction at sections A1-P4.pdf
5/21/2018309309 1847 BQLDATL-DA1 Site Hand-over .pdf
5/22/2018310310 SMC4-WD-0013-Proposal for WD of cast in place pile for pier P31 (2nd).pdf
5/22/2018310310 SMC4-WD-13 WD of cast in place pile for pier P31 (2nd).pdf
6/14/2018311311 SMC4-WD-0014-Proposal for approval of working drawing of cast in place pile for P29, P30 (2nd).pdf
5/22/2018311311 SMC4-WD-14 Working drawing of cast in place pile for P29, P30 (2nd).pdf
5/22/2018312312 SMC4-WD-0015-Proposal for WD of cast in place concrete pile for pier P36, P37.pdf
5/22/2018312312 SMC4-WD-15 WD of cast in place concrete pile for pier P36, P37.pdf
5/22/2018313313 SMC4-SC-0013-Proposal for manpower and equipment mobilization of TRANSMECO BP.pdf
5/22/2018313313 SMC4-SC-13 Manpower and equipment mobilization of TRANSMECO BP.pdf
5/22/2018314314 PMUTL-1852-DA1-Approval of The Subcontractor-479 JSC and 423 Construction & Trade Company..pdf
5/22/2018314314 PMUTL-1852-DA1-The Subcontractor-479 JSC and 423 Construction & Trade Company..pdf
5/23/2018315315 PMUTL- 1918- Invitation- Meeting in Traffic Control.pdf
6/1/2018316316 SMC4-WD-16 General view of Main Bridge and Ramp HQV-B (3rd).pdf
5/29/2018317317 SMC4-SC-14 Manpower and equipment mobilization of Co.423.pdf
5/29/2018318318 SMC4-SC-15 Manpower and equipment mobilization of Co.479.pdf
5/23/2018319319 SMC4-LC-106 Location and layout of site office and accommodation for JV and SubContractors.pdf
7/23/2018320320 SMC4-MA-59 Test result of Reinforcing Steel of Vietnam Italy Steel JSC.pdf
5/24/2018321321 SMC4-WD-17 WD of cast in place pile for middle column from P32C-P35C.pdf
5/30/2018322322 SMC4-RP-12 Topographic survey Fr Km0+660-Km1+000 and Km1+540-Km1+910 (2nd).pdf
5/25/2018323323 Minutes of Meeting 21.05.2018.pdf
5/25/2018324324 Minutes of Site Handover 22.05.2018.pdf
5/25/2018325325 1160-PMUTL-DA1 Sub-consultant for implementation of HIV-AIDS prevention program.pdf
5/25/2018326326 SMC4-MA-60 Testing Results of Bentonite Material of Hung Ngoc Co.Ltd for bored pile.pdf
5/25/2018327327 SMC4-WD-18 WD of SuperT girder from P29-P30.pdf
5/25/2018328328 SMC4-MA-58 Capacity Profile of Batching Plant The Gioi Nha.pdf
5/26/2018329329 SMC4-LC-107 Calculation Sheet for Soil Bearing Capacity of Bored Pile and Pre-Cast Pile Based on Additional Geological Investigation Report (2nd).pdf
5/28/2018330330 1978-GM-BQLDATL Meeting Invitation.pdf
5/28/2018331331 SMC4-LC-108 Weekly Report No.2.pdf
5/31/2018332332 1983 PMUTL-DA1 Ensuring traffic control and Traffic Safety during.pdf
5/29/2018333333 2021-GM-BQLDATL Invitation Date 30.5.pdf
5/29/2018334334 SMC4-LC-109 Engineer's Confirmation for Safety and Enviroment Satisfation.pdf
5/31/2018335335 SMC4-MS-27 Traffic control plan and water drain at section A1-P4.pdf
5/31/2018336336 SMC4-LC-110 The Contractor's Programme (2nd).pdf
5/31/2018337337 SMC4-WD-19 WD of Relocation Diversion of Existing Utilities for Electrical and Telecommunication Cable Line (P26-P37) at Right Side.pdf
6/1/2018338338 2074-GM-BQLDATL Invitation Date 5.6.18.pdf
6/1/2018339339 SMC4-MC-03 Application for Interim payment Certificate No.1( period 11May to 31may2018).pdf
6/1/2018340340 2086 PMUTLDA1 Checking and Evaluation of Sub-Contractor.pdf
6/1/2018341341 SMC4-LC-111 TOR and Cost estimate for Environment Monitoring Items (3rd).pdf
6/1/2018342342 SMC4-LC-112 Withdrawal of letter SMC4-LC-0071.pdf
6/1/2018343343 SMC4-LC-113 ReNotice for Location of Fabrication Yard of Super T girder.pdf
6/1/2018344344 SMC4-LC-114 Additional Equipment mobilization document of Team 1(2nd).pdf
6/2/2018345345 SMC4-MA-61 Capacity Profile of Manufacturer and Supplier of Materials for Protection and Relocation of Existing Utilities System.pdf
6/2/2018346346 2065 TB-BQLDATL Notice on Conslusions given by PMU In the Meeting on Implementation.pdf
6/2/2018347347 SMC4-MS-28-18 Submission of Traffic control plan for public road for construction at section P18-P22.pdf
6/2/2018348348 SMC4-LC 115 Additional Geological Investigation at P5 and P39.pdf
6/2/2018349349 SMC4-LC 116 Notification on Arrangement of flagman for traffic control at sections P29-P37.pdf
6/4/2018350350 SMC4-WD-20 WD of Cast in Place concrete pile for P35.pdf
6/5/2018351351 SMC4-LC-117 Submission of weekly report No.3.pdf
6/15/2018352352 SMC4-LC-118 Submission of monthly report No.1.pdf
6/5/2018353353 SMC4-LP-19 Detailed plan for a Joint Inspection of Thanh Long JSC.pdf
6/5/2018354354 SMC4-MS-29 Traffic control plan for public road for construction at section P3-P17.pdf
6/6/2018355355 SMC4-MA-62 Addition of Capacity profiles of Manufacturer and Supplier for Traffic Control Material.pdf
6/6/2018356356 SMC4-LC-119 Legal Document of Electric source (A1- P61) and Water source (A1- P37).pdf
6/7/2018357357 SMC4-LC-120 Notice for Leave for our Key Personnel ( Project Manager).pdf
6/7/2018358358 SMC4-WD-21 WD of Structure Excavation and backfill for Section P29-P37.pdf
6/7/2018359359 SMC4-LC-124 Terms of Reference for Ultrasonic test, tip contact checking test, static loading test and dynamic test (PDA) of Pre cast concrete pile and cast in place concrete pile (2nd).pdf
6/8/2018360360 SMC4-LC-121 Notice of Claim for Extension of time for Completion of the Works.pdf
6/8/2018361361 SMC4-LC-122 Claim No.1 Notice of Claim for additional payment due to the difference between the actual site and the site at the time for bid submission.pdf
6/8/2018362362 SMC4-LC-123 Report on Comparison of Economic Technical Criteria for alternation of Rotation steel Piles into Cast in place concrete piles at P9-15 & P45-P58.pdf
6/8/2018363363 SMC4-LC-125 Breakdown for lump sum items (2nd).pdf
6/8/2018364364 SMC4-MA-63 Capacity Profile of Manufacturer for PC Duct-NgocLam Production and Trading Co.LTD (2nd).pdf
6/8/2018365365 SMC4-LC-126 Report Safety Trading Ducument for Crane Operators.pdf
6/8/2018366366 SMC4-RP-13 Report For Trial Excavation of Bored Pile - Hole No.H5P31.pdf
6/9/2018367367 SMC4-LC-127 Withdrawal of the letter AMC4-RP-0013 dated 08June18.pdf
6/9/2018368368 SMC4-RP-14 Resubmission the RP for Trial Excavation of Bored pile- Hole No.H5P31.pdf
6/11/2018369369 SMC4-LC-128 To Support the Contractor in Coordination with Widening Project to fix the schedule and Completion date of light system of Widening Project.pdf
6/11/2018370370 SMC4-LC-129 Method Statement of Traffic control plan for construction at sections P18-P22.pdf
6/14/2018371371 SMC4-LC-130 Notice of Enviromental Monitoring Schedule in June 2018 at Construction phase.pdf
6/11/2018372372 SMC4-WD-22 WD of Cast in Place Concrete Pile for Pier P32.pdf
6/11/2018373373 SMC4-WD-23 WD of Cast in Place Concrete Pile for Pier P33.pdf
6/11/2018374374 SMC4-WD-24 WD of Cast in Place Concrete Pile for Pier P34.pdf
6/11/2018375375 SMC4-LC-133 Report on Inspecting Capacity of Thanh Long Group JSC.pdf
6/12/2018376376 SMC4-LC-132 Proposals on Adjustment of the Drainage System on Bridge.pdf
6/12/2018377377 SMC4-LC-134 Submission of Weekly Report No.4.pdf
6/12/2018378378 SMC4-LC-135 Confirmation of additional actual underground existing ultilities' survey data - Stage 1 P26-P37 ( 1st supplymentation).pdf
6/12/2018379379 SMC4-MA-65 Report on frequency test of Cement, crushed stone, yellow sand, water and admixture for Cement concrete at ASEAN Batching Plant (1st).pdf
6/12/2018380380 SMC4-MA-66 Report on Test result of Tie anchor ( U-Bolt) of Vinh Thuc Co. LTD.pdf
6/12/2018381381 SMC4-LC-136 Withdrawal SMC4-LC-132-18 Adjustment of the Drainage System on Bridge.pdf
6/12/2018382382 SMC4-LC-137 Proposal on Adjustment of the Drainage System on Bridge.pdf
6/12/2018383383 SMC4-MA-64 Report on Frequency test of Reinforcing Steel for Cast in Place concrete pile Pier P31.pdf
6/13/2018384384 3282 SGTVT-QLKCHTGT Giving opinion on traffic control plan for execution.pdf
6/13/2018385385 2097 BQLDATL-DA1 Fencing and traffic control plan for execution.pdf
6/16/2018386386 SMC4-MC-04 Interim payment Certificate No.1(11.5-31.5.18)(2nd).pdf
6/13/2018387387 SMC4-MS-30 Method Statement of Structure Excavation P29-P37,P29L-P31L.pdf
6/13/2018388388 SMC4-WD-25 WD Relocation of Existing Utilities for Electrical cable Line and Telecommunication P26-P37.pdf
6/20/2018389389 SMC4-MA-67 Report on Frequency test of Reinforcing Steel for Cast in Place concrete pile Pier P35.pdf
6/14/2018390390 SMC4-RP-15 Report for Trial Excavation ofCast in Place concrete pilling Hole No.H8P35.pdf
6/15/2018391391 SMC4-LC-138 The Contractor's Programme (3rd ).pdf
6/15/2018392392 SMC4-WD-27 WD of Super T Girder Span 31 (P30-P31).pdf
6/15/2018393393 SMC4-WD-26 WD of Extension of Pile Top for Static Load Test of Pier P35.pdf
6/16/2018394394 SMC4-LP-20 Notice in changing Contractor's Bank name for receiving Japanese Yen Portion of PK1.pdf
7/3/2018395395 SMC4-MS-31 Method Statement of Temporary Facilitites Arrangement on site from P18-P22.pdf
6/16/2018396396 SMC4-RP-16 Report on Topographic Survey - stage 2 fr Km0+328.8 to Km0+ 487.9.pdf
6/19/2018397397 SMC4-RP-17 Report on trial excavation of cast in place concrete piling - Hole No.H9P37.pdf
6/19/2018398398 SMC4-MA-68 Report on trial mix and proposal for proportion grouting for sonic tube.pdf
6/19/2018399399 SMC4-MA-69 Manufacturer's and suppliers capacity profile of couple and steel plate for grading.pdf
6/19/2018400400 SMC4-LC-139 Submission of weekly report No.5.pdf
6/19/2018401401 SMC4-MS-32 Method Statement of Protecting and relocating utilitites, stage 1 P26-P37.pdf
6/19/2018402402 SMC4-MS-33 Scheme of Additional geological investigation at pier P5 and P39.pdf
6/19/2018403403 SMC4-MS-34 Traffic control Plan for Public road for Construction at section A1-P22.pdf
6/19/2018404404 2348-PMUTL-DHDA1 18Jun Temporary Lighting during Execution of PK1.pdf
6/19/2018405405 2346-PMUTL-DHDA1-Fencing & Traffice Control during execution of the project.pdf
6/20/2018406406 SMC4-RP-18 The Incident report on construction of Cast in Place concrete pilling- Pier No.3 of pier P31.pdf
6/19/2018407407 2347-PMUTL-DHDA1 Coordination between Viaduct Construction Project & Widening Project.pdf
6/20/2018408408 SMC4-MA-70 Report on Frequency Test of Reinforcing Steel for Cast in Place concrete Pile P37.pdf
6/21/2018409409 SMC4-WD-28 WD of Cast in Place Concrete Pile for A1.pdf
6/21/2018410410 SMC4-WD-29 WD of Cast in Place Concrete Pile for P1.pdf
6/21/2018411411 SMC4-WD-30 WD of Cast in Place Concrete Pile for P2.pdf
6/22/2018412412 SMC4-LC-140 Request for Confirmation of Specification Requirement on Cement brand.pdf
8/11/2018413413 Minutes of the Scane-Enviromental Mornitoring 17-31May18.pdf
6/22/2018414414 SMC4-MS-35 Steel bridge Fabrication Procedure of Thanh Long Group JSC.pdf
6/23/2018415415 SMC4-LC-141 Supplement Document of Fabrication Yard of Super T girder.pdf
7/9/2018416416 SMC4-MS-36 Method Statement of Production of Super T girder (Rev.2).pdf
6/25/2018417417 SMC4-LC142 Submission of Weekly Report No.6.pdf
6/25/2018418418 SMC4-LC143 Withdrawal of the letter SMC4-LC-0140 21JUN18.pdf
6/26/2018419419 SMC4-MS-26A Traffic Control Plan for Public Road at P45-P60.pdf
7/26/2018420420 SMC4-LC-144 TOR for Ultrasonic Test, Tip Contract Checking Test, Static Loading Test & PDA (3rd).pdf
6/28/2018421421 SMC4-LC-146 Request for Clarification of Detail of Basement for Traffic Sign Board.pdf
6/27/2018422422 SMC4-LC-145 Reply to the Engineer's letter Regarding Environment Control Plan.pdf
6/28/2018423423 498 TB-SGTVT Notice on Alternatives for Adjustment of Construction fence,Traffic diversion and Traffic control.pdf
6/28/2018424424 SMC4-MS-37 Method Statement of Traffic control for Construction of P29-P37-Volume I.3 Layout Plan of Road Marking.pdf
6/28/2018425425 SMC4-MS-38 General Traffic Control Plan for Public Road for Construction stage 1.pdf
6/28/2018426426 SMC4-LC-147 Additional Equipment Mobilization Document of Team 1(3rd).pdf
6/28/2018427427 SMC4-LC-148 Additional Report on Environmental Monitoring at Pre-Construction Phase.pdf
6/28/2018428428 Minutes of Inspection Capability for Production Fabrication and Construction of Steel Bridge of Thanh Long.pdf
6/29/2018429429 2511 PMUTL-DA1 Approval for Subcontrator,Thanh Long Group JSC.pdf
6/29/2018430430 371 GM-BQLCTGT Invitation Letter.pdf
6/30/2018431431 SMC4-LC-149 Additional Report on Comparison of Economic-Technical Criteria for Alternation of Rotation Steel Piles into CIP Concrete Pile at P9-P19 & P45-P58.pdf
7/2/2018432432 SMC4-MS-39 Method of Traffic Control for Public Road during the Fence Trial at P18-P22.pdf
7/2/2018433433 SMC4-LC-150 Submission of Weekly Report No.7.pdf
7/2/2018434434 2556-GM-BQLDATL Invitation.pdf
7/4/2018436436 SMC4-RP-19 Report on Trial Excavation of Cast in Place Concrete Pilling- Hole No.H5'P30.pdf
7/4/2018437437 2596 GM-BQLTL Invitation Letter.pdf
7/5/2018438438 2614 PMUTL-KTTD Strengthening of Quality Management during Construction.pdf
7/5/2018439439 SMC4-LC-151 Submission of Monthly Report No.2.pdf
7/13/2018440440 SMC4-MA-71 Report on Trial of Concrete Class A,B1,C1,C3,C4,D,G,Y of Transmeco Bathching Plant.pdf
7/7/2018441441 SMC4-LC-152 New Design for Cast in Place Concrete Pile In Replacement of Rotation Steel Pile at P9-P15& P45-P58 (9 Piles per 1Pile Cap) (2nd).pdf
7/7/2018442442 SMC4-MS-40 WD of General Layout of Road Marking in Traffic Control Method.pdf
7/7/2018443443 SMC4-LC-153 Additional Equipment Mobilization Document of Team 1 (4th).pdf
7/9/2018444444 2629-PMUTL Notice on Conclusions by PMUTL on the Meeting on Expedition of Construction & Disbursement Progress of PK1 & PK2.pdf
7/9/2018445445 7303-BGTVT-CQLXD Design Change of Pilling Foundation From Rotation Steel Pile to Bored Steel Pile.pdf
7/9/2018446446 SMC4-RP-20 Report on Trial Excavation of Cast in Place Concrete Piling - Hole H5'P31.pdf
7/9/2018447447 SMC4-MS-41 Quality Control Method of Reinforcing Steel Bars.pdf
7/9/2018448448 SMC4-MS-42 Detail plan on Personnel Arrangement & Traffic Control Work at P29-P37.pdf
8/3/2018449449 SMC4-MS-43 Method Statement of Traffic Control at P29-P37-Vol I.2.2 Adjustted of Temporary lighting system.pdf
7/9/2018450450 SMC4-LC-155 Notice on Implementation of Official Fencing Work for P18-P22.pdf
7/10/2018451451 SMC4-LC-154 Engineer's Confirmation for Safety & Environment Satisfaction (June -2018).pdf
7/10/2018452452 WM onTrial Fencing From Pier P18-P22 & Section P84-P96.pdf
7/10/2018453453 2670-PMUTL-DHDA1 Design Change of Pilling Foundation for Some Piers in Project.pdf
7/13/2018454454 SMC4-MA-72 Report on Trial Mix of Concrete Class C1,C3,C4,D of ASEAN Bathching Plant.pdf
7/10/2018455455 SMC4-LC-156 Submission of Weekly Report No.8.pdf
8/24/2018456456 Minutes of Site Hand-Over (stage2).pdf
8/3/2018457457 Agreement on Additional Suppervision Costs.pdf
7/26/2018458458 SMC4-LC-157 Design Change for Replacement of Rotation Steel Pipe with Cast in Place Concrete Pile.pdf
7/12/2018459459 SMC4-LC-158 Response to the Engineers letter on Claim for Extension of Time for Completion.pdf
7/13/2018460460 2682 BQLDATL-ĐHDA1 Comments on Road-Markings for Traffic Control.pdf
7/13/2018461461 2722 PMUTL-DHDA1 Protection & Relocation of Ultilities for Construction fr P32-P35.pdf
7/16/2018462462 SMC4-MS-44 Method Statement of Demolition & Relocation of Existing Ultilities ( Stage 2).pdf
7/13/2018463463 SMC4-WD-31 WD of Super T Girder Span 32 (P31-P32).pdf
7/13/2018464464 SMC4-WD-32 WD of Super T Girder Span 37 (P36-P37).pdf
7/13/2018465465 398-GM-BQLCTGT Prepare for Construction of Substructure of 5 Pedestrian Brigde at Km0+938,5, Km1+940, Km2+ 720, Km3+745,Km4+235.pdf
7/13/2018466466 SMC4-WD-34 D of Substructure - Pile Cap of Pier P31.pdf
7/13/2018467467 SMC4-WD-33 WD of Substructure - Pile Cap of Pier P37.pdf
7/14/2018468468 SMC4-MS-45 Method Statement of Traffic Control for Public Road during Trial Fencing Installation at A1-P16.pdf
7/14/2018469469 SMC4-MA-73 Manufacturer & Supplier of Bituminous Waterproofing Material for Concrete.pdf
7/16/2018470470 2723-GM-BQLDATL Inspect & Evaluate the Fencing Work & Traffic Control.pdf
7/20/2018471471 SMC4-RP-21 Topographic survey report stage 2 (Km0+326.15-Km0+660 & Km1+000-Km1+300).pdf
7/16/2018472472 SMC4-LC-159 TOR & Cost Estimate for General Traffic Control for Public Road for Construction Stage 1.pdf
7/16/2018473473 SMC4-LC-160 Submission of Weekly Report No.9.pdf
7/17/2018474474 SMAC4-MA-74 Report on Frequency Test of Reinforcing Steel for Cast in Place Concrete Pile P33 & P34.pdf
8/3/2018475475 SMC4-MS-47 Method Statement of Temporary Facilities Arrangement on Site at P3-P16.pdf
8/7/2018476476 SMC4-MS-46 Supplement & Updating the Method Statement Plan Drawing of Trial Excavation & Cast in Place Concrete Pilling from P18-P22.pdf
7/17/2018477477 SMC4-WD-35 WD of Substructure Pile Cap of P30.pdf
7/17/2018478478 SMC4-WD-36 WD of Substructure Pile Cap of P35.pdf
7/17/2018479479 SMC4-WD-37 WD of Substructure Pile Cap of P36.pdf
7/18/2018480480 SMC4-MA-75 Report on Trial Mix of Concrete Class E of TRASMECO Batching Plant.pdf
7/18/2018481481 SMC4-LC-161 Notice of Claim Regarding Delay of Review & Approval for Working Drawing of Cast In Place Concrete Pile for P32.pdf
7/18/2018482482-LC-162 Notice for Prevention of Typhoon No.3 ( Son Tinh).pdf
7/18/2018483483 238-TB-SGTVT Invitation Review & Agree on Taking Over & Handing Over of the Site; Method statement & traffic control plan; Coordination for expedition of Construction Progress.pdf
7/19/2018484484 SMC4-MA-76 Capacity Profile of Manufaturer & Supplier for PC Strand & Anchorage for Pier Head-Zhemao Science & Technology Co.,ltd- Vinh Hung Trading Consulting & Construction JSC.pdf
7/20/2018485485 SMC4-MA-78 Capacity Profile of Zhemao Science & Technology Co.,Ltd; PC Strand Manufacturer & Vinh Hung Trading Consulting & Construction JSC, PC Strand Supplier.pdf
7/20/2018486486 SMC4-MA-77 Capacitiy Profile of Home World Batching Plant (2nd).pdf
8/18/2018487487 SMC4-MS-48 Method Statement of Pile Cap from P29-P37 & Ramp P29L-P31L.pdf
7/20/2018488488 SMC4-WD-38 WD of Cast in Place Concrete Pile for P18.pdf
7/20/2018489489 SMC4-WD-39 WD of Cast in Place Concrete Pile for P19.pdf
7/20/2018490490 SMC4-WD-40 WD of Cast in Place Concrete Pile for P20.pdf
7/20/2018491491 SMC4-WD-41 WD of Cast in Place Concrete Pile for P21.pdf
7/20/2018492492 SMC4-WD-42 WD of Cast in Place Concrete Pile for P22 (2nd).pdf
7/20/2018493493 SMC4-WD-43 WD of Substructure - Pile Cap of P34.pdf
7/20/2018494494 SMC4-WD-44 General View of Main Bridge & Ramp HQV-B (4th).pdf
8/1/2018495495 SMC4-MA-79 Report on Test Result of MIGHTY Admixture.pdf
7/25/2018496496 SMC4-RP-22 Report on Additional Geological Investigation Stage 2 ( Including Drilling Holes BS P5 & P39.pdf
7/23/2018497497 SMC4-LC-166 Submission of Weekly Report No.10.pdf
7/23/2018498498 SMC4-LC-164 Calculation Sheet for Soil Bearing Capacity of Bored Pile of P5 & P39 based on Additional Geological Investigation Report-Stage 2.pdf
7/23/2018499499 SMC4-LC-163 Document for Water Truck Mobilization.pdf
7/26/2018500500 SMC4-LC-165 Cost Estimate for Test on Concrete Pile Cast in Place Concrete Piles & RC 35x35cm (2nd).pdf
7/24/2018501501 2872 GM-BQLDATL Meeting Safety Expert of JICA with PMUTL on Labor safety for Construction Project.pdf
7/24/2018502502 SMC4-LC-167 Notice for Leave Key Personnel ( Project manager).pdf
8/11/2018503503 SMC4-MA-80 Capacity Profile of the Manufacturer & Spplier for Blinding Stone, Granular Backfill, Permeable Backfill, Subbases & Bases Materials.pdf
8/18/2018504504 SMC4-MS-49 Method Statement for Assembling & Loading Test of Gantry Crane at Fabrication Yard for Super T Girder of Group No.3- 414 Co.Lt.pdf
7/26/2018505505 SMC4-MA-76A Report on Frequency Test of Reinforcing Steel for Cast in Place Concrete P30.pdf
7/26/2018506506 SMC4-WD-45 WD of Cast in Place Concrete Pile for P4.pdf
7/26/2018507507 SMC4-WD-46 WD of Cast in Place Concrete Pile for P6.pdf
7/26/2018508508 SMC4-WD-47 WD of Cast in Place Concrete Pile for P7.pdf
7/26/2018509509 SMC4-WD-48 WD of Cast in Place Concrete Pile for P8.pdf
7/26/2018510510 SMC4-WD-49 WD of Substructure-Pile Cap of P29.pdf
7/26/2018511511 SMC4-WD-50 WD of SuperT Girder Span P36 (P35-P36).pdf
7/26/2018512512 TCQM-Invitation for Site Visit.pdf
8/8/2018513513 SMC4-MA-81 Report on Test Result of Coupler & Steel Plate for Grading of Vinh Thuc Co.,Ltd.pdf
7/27/2018514514 SMC4-MA-82 Capacity Profile of MINH TAM Batching Plant.pdf
7/27/2018515515 SMC4-MA-83 Capacity Profile of Manufacturer for Tie Anchor, Steel Plate for Grading & Dowel of Viet Thang Co.pdf
7/28/2018516516 SMC4-MA-84 Report on Frequency Test of Cement, Crushed Stone, yellow Sand, Water & Admixture at Transmeco Batching Plant (1st).pdf
7/28/2018517517 SMC4-WD-51 WD of Substructure - Pile cap of P33.pdf
7/28/2018518518 SMC4-WD-52 WD of Super T Girder Span P35 (P34-P35).pdf
8/30/2018519519 SMC4-LC-168 Changing Some Items of Technical Specifications.pdf
7/28/2018520520 SMC4-LP-21 VAT Invoices for Interim Payment Certificate No.1 of PK 1.pdf
7/30/2018521521 SMC4-LC-169 Document for Mobilization of Additional Equipment of Team 2 (2nd).pdf
7/30/2018522522 SMC4-LC-170 Submission of Weekly Report No.11.pdf
8/25/2018523523 SMC4-MS-50 Method Statement of Structure Excavation from P29-P37 & Ramp P29L-P31L (Rev.02).pdf
8/1/2018524524 SMC4-LC-171 Application for Interim Payment Certificate No.02 01stJune-31stJuly,2018.pdf
8/1/2018525525 SMC4-WD-53 WD of Cast in Place Concrete Pile for P29L.pdf
8/1/2018526526 SMC4-WD-54 WD of Cast in Place Concrete Pile for P30L.pdf
8/1/2018527527 SMC4-WD-55 WD of Cast in Place Concrete Pile for P31L.pdf
8/1/2018528528 SMC4-MA-87 Reinforcing Steel-Kyoei Steel Vietnam Co.Ltd for Cast-in-place Concrete Pile Pier P30 will be used for Cast-in-place Concrete Pile Pier P29.pdf
8/2/2018529529 SMC4-MA-85 Report on Frequency Test of Reinforcing Steel for Cast in Place Concrete Pile P36.pdf
8/2/2018530530 SMC4-MA-86 Report on Frequency Test of Reinforcing Steel for Cast in Place Concrete Pile P33&P34 (2nd).pdf
8/3/2018531531 SMC4-MA-89 Report on Frequency Test of Reinforcing Steel for Cast in Place Concrete Pile P29.pdf
8/3/2018532532 SMC4-MA-88 Capacity Profile of Manufacturer & Supplier for Rubbler Bearing Kawakin Core-Tech Vietnam.pdf
8/3/2018533533 SMC4-LC-172 Mobilization for Manpower & Equipment by Thanh Long JSC for Test of Concrete Pile & Rotation Steel Pile (2nd).pdf
8/3/2018534534 SMC4-WD-56 WD of SuperT Girder Span 30 (P29-P30)(2nd).pdf
8/3/2018535535 SMC4-WD-57 WD of SuperT Girder Span 31 (P30-P31) (2nd).pdf
8/4/2018536536 SMC4-MS-30A Method Statement of Traffic Control for Public Road at A1-P4 - Vol II.1 WD of Slope for Traffic Control.pdf
8/4/2018537537 SMC4-MS-30B Method Statement of Traffic Control for Public Road at A1-P4 - Vol II.2 WD of Drainage System.pdf
8/4/2018538538 SMC4-RP-23 Report on Survey of Existing Traffic Light System at HQV Intersection.pdf
8/4/2018539539 SMC4-LC-119A-Approval for Utilizing Equipment & Materals Used by Widening Project for Construction of Road Connecting at A1-P4.pdf
8/4/2018540540 SMC4-LC-173 Report on Land Obstruction during Installation of Fence at P3-P16.pdf
8/6/2018541541 SMC4-LC-174 Submission of Monthly Report No.3.pdf
8/8/2018542542 SMC4-MA-90 Technical Profile of Coarse Aggregate, Fine Aggregate & Water for Minh Tam Batching Plant.pdf
8/8/2018543543 SMC4-MA-91 Report on Frequency Test of Reinforcing Steel for Cast In Place Concrete Piles of P33 & P34 (3rd).pdf
8/8/2018544544 SMC4-MA-92 Report on Frequency Test of Reinforcing Steel for Cast In Place Concrete piles for P35 (2nd).pdf
8/8/2018545545 SMC4-LC-175 Document for Mobilization of Additional Equipment Team 2 (3rd).pdf
8/17/2018546546 SMC4-LC-176 Project Health and Safety Plan (2nd).pdf
8/8/2018547547 3014-QD-BQLDATL Decision on Coordination Mechanism for Implementation of PK1 & PK2.pdf
8/8/2018548548 3057-BQLDATL-DHDA1 To give comments on Traffic Signs Plan.pdf
8/8/2018549549-3058-PMUTL-ĐHDA1 Coordination in Quality Management During Construction of PK2.pdf
8/8/2018550550 SMC4-LC-177 Engineer's Confirmation for Safety & Environment Satisfaction (July 2018).pdf
8/8/2018551551 SMC4-LC-178 Report on Additional Environmental Monitoring at Pre-Construction Phase (2nd).pdf
9/4/2018552552 SMC4-LC-179 Proposal for 5th Additional Equipment Mobilization Document of Team 1 (Co.414).pdf
8/9/2018553553 SMC4-MS-51 Submission of Traffic Control Plan for public Road for Construction at Sections P23-P28 & P38-P43.pdf
8/10/2018554554 SMC4-LC-180 Notice on Environmental Monitoring Schedule in Aug 2018.pdf
8/10/2018555555 SMC4-MA-93 Report on Trial Mix & Proposal for Approval Mix Proportion Grouting for PC Duct.pdf
8/10/2018556556 SMC4-LC-181 Stamp of As-Built Drawing.pdf
8/10/2018557557 SMC4-LC-182 Withdrawal of the letter SMC4-LC-016918 dated 28Jul18 & LC-017518 dated 7Aug18.pdf
8/17/2018558558 SMC4-LC-183 Document for Mobilization of Additional Equipment of Team 2 ( 2nd).pdf
8/14/2018561561 SMC4-LC-184 Notice for Leave for our Key Personnel (Project Manager).pdf
8/14/2018562562 SMC4-LC-185 Request for Review & Approval of WD of Cast In Place Pile of P29L, P30L, P31L.pdf
8/14/2018563563 SMC4-LC-186 Request for Review & Approve WD of Cast In Place Piles of Abutment A1, P1, P2, P4, P6-P8.pdf
8/14/2018564564 SMC4-LC-187 Submission of Weekly Report No.13.pdf
8/14/2018565565 SMC4-WD-61 WD of SuperT girder Span 34 (P33-P34).pdf
8/14/2018566566 SMC4-WD-59 WD of SuperT Girder Span 33 (P32-P33).pdf
8/14/2018567567 SMC4-LC-188 Proposal for Changing the Location of Static Load Test at P22.pdf
8/14/2018568568 SMC4-MS-52 MS of Traffic Control for Public Road at A1-P22-Layout of Flagman, Signboard.pdf
8/15/2018569569 SMC4-MA-94 Report on Frequency Test of Reinforcing Steel for Cast In PLace Piles of P21 and P22.pdf
8/14/2018570570 SMC4-MA-95 Proposal of Mix Proportion for Trial Mix Class B1, C1, C3, C4, D, E, G & Y at Transmeco Batching Plant.pdf
8/14/2018571571 3146-BQLDATL-DHDA1 Design Change of Pile cap of Pier and Abutment.pdf
8/16/2018572572 SMC4-LC-189 Notice of Envioronmental Monitoring Schedule in August 2018 at Construction Phase (2nd).pdf
8/18/2018573573 SMC4-SC-16 Document for Mobilization of Manpower & Equipment of Sub Contractor 423 Co. (2nd).pdf
8/16/2018574574 SMC4-WD-58 WD of Substructure - Pile Cap of P21.pdf
8/16/2018575575 SMC4-WD-60 WD of Substructure - Pile Cap of P20.pdf
8/16/2018576576 3186-GM-BQLDATL Traffic Management.pdf
8/16/2018577577 408-CQLXD-DB1 Report on Result of Site Inspection.pdf
8/16/2018578578 SMC4-WD-62 WD of Substructure - Pile cap of P22.pdf
8/16/2018579579 SMC4-WD-63 WD of Cast In Place Concrete Pile for P17.pdf
8/17/2018580580 SMC4-RP-26 Report on Trial Excavation of Cast In Place Concrete Piles - Hole H3P22.pdf
8/17/2018581581 SMC4-LC-190 Withdrawal of the Letter SMC4-LC-0122.18 dated 7 June 2018.pdf
8/16/2018582582 448-GM-BQLCTGT Invitation-Fence Installation from Mai Dich Intersection to HQV Intersection.pdf
8/17/2018583583 SMC4-LC-191 Prevention of the Storm No.4.pdf
8/17/2018584584 SMC4-RP-24 Topographic Survey Report of Existing Drainage System.pdf
8/17/2018585585 SMC4-RP-25 Topographic Survey Report at Section ( fr Km0+ 880 to Km1+00) after Box Culvert is Completed by Widening Project.pdf
8/23/2018586586 SMC-LC-192 Result of Ultrasonic Test of CIP Concrete Piles at P35C.pdf
8/20/2018587587 SMC4-MS-53 Traffic Control Plan for Public Road for Construction at P23-P28.pdf
8/20/2018588588 SMC4-LC-0195-Proposal for WD of Structure Excavation & Backfill for Section P29-P37 (2nd).pdf
8/20/2018589589 SMC4-LC-196 Report of Trial Excavation of Underground Utilities on the Central Median Stage 2 P29-P37 (1st).pdf
8/24/2018590590 SMC4-SC-17 Document for Mobilization of Equipment for Structure Excavation Work of Sub Contractor Co.479.pdf
8/21/2018591591 SMC4-LC-194 Design Change Document for Replacement of Rotation Steel Pile with CIP Concrete Pile at P9-P15 P45-P58- Option 2.pdf
9/13/2018592592 SMC4-LC-193 Design Change Document for Replacement of Rotation Steel Pile with CIP Concrete Pile at P9-P15 & P45-P58, Option 1- 9 Piles per 1 Pile Cap.pdf
8/20/2018593593 SMC4-MS-54 General Traffic Control Plan for Public Road for Construction Stage 1- Construction Bored Piled Pile & Substructure.pdf
8/20/2018594594 SMC4-MA-96 Capacity Profile of Manufaturer & Supplier for PVC Pipe Material Thuan Phat & Hiep An JSC.pdf
8/30/2018595595 SMC4-LC-197 Result of Ultrasonic Test of CIP Concrete Piles at P31.pdf
8/20/2018596596 SMC4-LC-198 Submission of weekly report No.14.pdf
8/22/2018597597 SMC4-LC-199 Notice of Equipment Demobilization of Team 1.pdf
8/22/2018598598 SMC4-MA-97 Capacity Profile of Company Carries Our Galvanizing Work An Viet Co..pdf
8/22/2018599599 SMC4-LC-202-Notice of Equipment Demobilization of Sub Contractor Co.423.pdf
8/23/2018600600 SMC4-MA-98-Report on Frequency Test of Cement, Crushed Stone, Yellow Sand for Cement Concrete at Asean BP (2nd).pdf
8/22/2018601601 SMC4-MA-99 Report on Frequency Test of Reinforcing Steel for Pile Cap & Pier Column of P33, P34, P35 (1st).pdf
8/22/2018602602 SMC4-MA-100 Additional Submission of Report on Frequency Test of Cement for Cement Concrete at ASEAN BP (1st).pdf
8/22/2018603603 SMC4-WD-64 WD of SuperT Girder Span 20 (P19-P20).pdf
8/22/2018604604 SMC4-WD-65 WD of Super T Girder Span 21 (P20-P21).pdf
8/22/2018605605 SMC4-WD-66 WD of SuperT Girder Span 22 (P21-P22).pdf
8/22/2018606606 SMC4-LC-201 Report on Environmetnal Monitoring at Construction Phase.pdf
8/22/2018607607 287-GM-SGTVT Invitation Date 23.8.pdf
8/22/2018608608 SMC4-LC-203 Notice of Equipment Demobilization of Team 1.pdf
8/23/2018609609 SMC4-RP-26 Report on Trial Excavation of CIP Pile -Hole No. H9P36.pdf
8/29/2018610610 SMC4-RP-27 Topographic Survey Report Stage 3 (Km1+300 to Km1+540).pdf
8/23/2018611611 SMC4-MA-101 Capacity Profile of Borrow Material Manufacturer Minh Dat JSC & Supplier Diep Trang Co.LTD.pdf
8/23/2018612612 SMC4-LC-204 TOR & Cost Estimate for Environmental Monitoring (4th).pdf
8/27/2018613613 SMC4-MA-102 Report on Test of Coupler & Steel Plate for Grading of Viet A Machine Co.LTD.pdf
8/27/2018614614 SMC4-LC-205 Submission of Result of Ultrasonic Test of CIP Concrete Pile at P30.pdf
9/27/2018615615 SMC4-LC-206 Replacement of Contractor's Key Personnel.pdf
8/27/2018616616 SMC4-LC-207 Submission of Result of Ultrasonic Test of CIP Concrete Piles at P34C.pdf
8/27/2018617617 SMC4-LC-208 Submission of Weekly Report No.15.pdf
9/18/2018618618 SMC4-WD-67 WD of Substructure- Pile Cap P29 (2nd).pdf
9/18/2018619619 SMC4-WD-68 WD of Substructure- Pile Cap of P31(2nd).pdf
8/27/2018620620 SMC4-WD-69 WD of Substructure- Column & Pier Head of P31.pdf
9/18/2018621621 SMC4-WD-70 WD of Substructure- Pile Cap of P30 (2nd).pdf
8/28/2018622622 SMC4-LC-209 Additional cranes Mobilization Document of Team 1 (414 Co) at Fabrication Yard.pdf
8/28/2018623623 3313-PMUTL-DHDA1 Traffic Control, Labor Safety, Enviroment Sanotation during Construction.pdf
8/28/2018624624 SMC4-WD-71 WD of CIP Concrete Pile for P23.pdf
8/28/2018625625 SMC4-WD-72 WD of CIP Concrete Pile for P24.pdf
8/28/2018626626 SMC4-WD-73 WD of CIP Concrete Pile for P28.pdf
8/28/2018627627 3353-PMUTL-DA1 Approval of TOR & Cost Estimates for Test on RC Pile.pdf
8/29/2018628628 Working Minutes 16Aug18 On Checking, review & Assessment of the Status of Traffic Control & Agree on the Adjustment Plan.pdf
8/30/2018629629 3374 PMUTL-DA1 Some Contents of Detailed Design Document and Technical Specifications.pdf
8/30/2018630630 SMC4-LC-0210 Term of Reference & Cost Estimate for General Traffic Control for Public Roads for Construction Stage 1- Construction of Bored Piles & Substructures.pdf
8/30/2018631631 SMC4-MA-103 Capacity Profile of Manufacturer & Supplier of Bituminous Waterproofing for Concrete - Ha An JSC.pdf
8/30/2018632632 SMC4-LC-211 Document for Mobilization of Equipments for Structure Excavation Work of 423 Co..pdf
8/30/2018633633 SMC4-LC-212 Supplement Document of Team 1 (Co. 414).pdf
8/30/2018634634 SMC4-LC-213 Additional Manpower Document for Foreman of Co.423.pdf
9/1/2018635635 SMC4-LC-214 Design Change Document for Drainage System on Bridge.pdf
9/1/2018636636 SMC4-LC-215 Notice on National Holiday Schedule of the Contractor.pdf
9/1/2018637637 SMC4-MA-104 Additional Capacity Profile of Manufacturer & Supplier VietThang Co. for Steel Plate, Joint Steel for Head of RC Pile & Auxiliary Steel Material.pdf
9/1/2018638638 SMC4-MA-105 Report on Frequency Test of Cement, Crushed Stone, Yellow Sand for Cement Concrete at ASEAN BP (3rd).pdf
9/1/2018639639 SMC4-WD-74 WD of CIP Pile for P16.pdf
9/1/2018640640 SMC4-WD-75 WD of CIP Pile for P25.pdf
9/1/2018641641 SMC4-WD-76 WD of CIP Pile for P26.pdf
9/1/2018642642 SMC4-WD-77 WD of CIP Pile for P27.pdf
9/5/2018643643 SMC4-MS-56 Traffic Control Method for Public Roads- Removal Traffic Light System at HQV Intersection.pdf
9/1/2018644644 SMC4-LC-218 Application for IPC No.3 -Period 01Aug to 31Aug18.pdf
9/1/2018645645 SMC4-MS-55 Traffic Control Plan for Public Road at P23-P28 & P38-P43 (2nd).pdf
9/1/2018646646 SMC4-LC-217 Changing Hook Shape of Rebar F9, C2A, C3, C4, C5, C6 of Substructure.pdf
9/5/2018647647 Working Minutes 17Aug18 Coorperation for Construction Implementation & Traffic Control of HRR3.pdf
9/5/2018648648 SMC4-LC-219 Engineer's Confirmation for Safety & Environment Satisfaction (Aug2018).pdf
9/5/2018649649 SMC4-SC-19 Document for Mobilization of Drilling Machine of Team 2- 407 Co..pdf
9/5/2018650650 SMC4-LC-220-Submission of Weekly Report No.16.pdf
9/5/2018651651 SMC4-LC-221-Submission of Monthly Report No.4.pdf
9/5/2018652652 3455 PMUTL-DHDA1 Coordination in Implementation of Package 11 Quality Inspection of the Works.pdf
9/5/2018653653 3457 GM-BQLDATL Invitation date 5.9.18.pdf
9/6/2018654654 SMC4-MA-106 Report on Frequency Test of Cement for Grouting Sonic Tube use for P29 to P37.pdf
9/6/2018655655 SMC4-MA-107 Report on Frequency Test of Water for Grouting Sonic Tube.pdf
9/6/2018656656 3468-GM-BQLDATL Working on the Matters of Price Adjustment & Enviromental Monitoring.pdf
9/6/2018657657 3469-TB-BQLDATL Notice on Conclusions Given by PMUTL in the Meeting to Review the Implementation.pdf
9/7/2018658658 SMC4-LC-222 Notice of Equipment Demobilization of Team 1.pdf
9/7/2018659659 SMC4-MS-57-Supplement & updating the MS of Trial Excavation & CIP Concrete Piling from P23-P28.pdf
9/7/2018660660 SMC4-LC-174A-Submission of Weekly Report No.12.pdf
9/10/2018661661 SMC4-RP-28 Topographic Survey Report of Existing Drainage System (2nd).pdf
9/10/2018662662 SMC4-MS-58 Method Statement of Pier Column 1st Stage from P29-P37 and Ramp (P29L to P31L).pdf
9/10/2018663663 SMC4-LC-223 Additional Supervision Cost of Engineer's Staff (upto July 2018).pdf
9/10/2018664664 SMC4-LC-224 Changing Blast Cleaned & Inorganic Zinc Rich Primer at Steel Mill into Blast Cleaned & Inorganic Zinc Rich Primer at Fabrication Factory.pdf
9/20/2018665665 SMC4-LC-225 Additional Mobilization of Mainpower & Equipment by Subcontractor Thanh Long JSC for Test on RC Pile.pdf
9/11/2018666666 SMC4-MA-108 Information on the Super T Cable Tensioning Equipment of the Constructure Team 2 -414 Co..pdf
9/15/2018667667 SMC4-LC-227 TOR of Ultrasonic Test, Tip Contact tChecking Test, Static Loading Test and PDA of Pre cast Concrete Pile & CIP Concrete Pile(4th).pdf
9/11/2018668668 SMC4-LC-226 Submission of Weekly Report No.17.pdf
9/11/2018669669 836-TB-UBND Notice Conclusions by the Chairman of Hanoi People's Committee at the Meeting on Land Acquisition and Inplementation of Projects.pdf
9/11/2018670670 3540 Notice on Conclusions Given By Leader PMUTL in the Meeting on Environmental Monitoring & Price Adjustment.pdf
9/12/2018671671 3543 PMUTL-DHDA1 Implementation of MOT's Instructions Vide Letters No.10172-BGTVT-CQLXD & 107173-BGTVT-CQLXD.pdf
9/13/2018672672 01-CDEDE-BCHIV-MDNTL Report on the Implementation on JULY18 HIV-AIDS Prevention Program.pdf
9/13/2018673673 02-CDEDE-BCHIV-MDNTL Report on the Implementation on Aug18 HIV-AIDS Prevention Program.pdf
9/13/2018674674 SMC4-LC-228 Notice on Implementation of Assembling Work for Gantry Crane Group 3 Co.414 at Super T Farbrication Yard.pdf
9/13/2018675675 SMC4-LC-229 Result of Ultrasonic Test of CIP Concrete Piles at P37.pdf
9/22/2018676676 SMC4-LC-230 Certification on Performance of the Laboratory Satisfying Requirement (8.2018).pdf
9/25/2018677677 SMC4-LC-231 Certification of Satisfatory Laboratory Operation (8.2018).pdf
9/13/2018678678 SMC4-LC-232 Submission of Updated Cost Estimate of Test on Concrete Piles.pdf
9/13/2018679679 SMC4-MA-109 Profile of Manufacturer & Supplier for Rubber Bearing Kawakin -THQ JSC (2nd).pdf
9/13/2018680680 SMC4-LC-233 Reply to the Engineer's Letter Regarding Document for Mobilization of Drilling Machine of Team 2 Co.407.pdf
9/14/2018681681 SMC4-MS-59 MS of Traffic Control at section A1-P22-Vol III.2 ...- Stage 2 Open the Left Side & Right Side at P3-P16.pdf
9/14/2018682682 SMC4-MA-110 Characteristic Strength for Concrete Class Y of Asean BP- Report No.01.pdf
9/22/2018683683 SMC4-LC-234 Response to the Engineer's Request on Overtime Supervision Expense for Safety & Environment Monitoring Works.pdf
9/14/2018684684 SMC4-LC-236 Submission of Result of Ultrasonic Test of CIP COncrete Piles at P33C.pdf
9/19/2018685685 SMC4-MA-0111 Report on Test Result of Granular Backfilling Material & Blinding Stone Material at Trung Do Moutain ( KV5), Cao Duong Commune, Luong Son, Hoa Binh.pdf
9/17/2018686686 SMC4-LC-237 Document for Addtional Mobilization of Equipments for Structure Excavation Work of the Sub Contractor 479 Co..pdf
9/18/2018687687 SMC4-LO-23 Exchange Rate - VAT Amount.pdf
9/18/2018688688 SMC4-LC-238 Notice of Equipment Demobilization of Sub Contractor 423 Co..pdf
9/18/2018689689 SMC4-LC-239 Submission of weekly report No.18.pdf
9/21/2018690690 SMC4-MS-60 Method statement of Demolition & Relocation of Existing Utilities (stage 1).pdf
9/19/2018691691 SMC4-MS-61 MS of Temporary Facilities Arrangement on Site from P38-P43.pdf
9/19/2018692692 SMC4-MS-62 MS of Temporary Facilities Arrangement on Site from P23-P29.pdf
9/19/2018693693 SMC4-MA-114 Capacity of Anufacturer & Supplier of Bolds & Stud Shear Connectors of Steel Bridge.pdf
9/19/2018694694 SMC4-WD-78 WD of SuperT Girder Span 10-16 and 23-26.pdf
9/19/2018695695 SMC4-MA-112 Report on Frequency Test of Reinforcing Steel for Pile Cap & Column of P29, 30, 31(1st).pdf
9/19/2018696696 SMC4-MA-113 Capacity Profile of Building Material & Geotechnics Laboratories LAS-XD 175.pdf
9/19/2018697697 SMC4-LC-240 Request for Detail Instruction on Legal Basis of Flagman for Traffic Control.pdf
9/19/2018698698 SMC4-LC-241 Reply to The Consultant's Letter RE1-0263 Regarding Confirmation of Safety & Environmental Satisfaction (Aug2018).pdf
9/19/2018699699 SMC4-MA-115 Minutes of Checking Hot Dip Galvanized Factory An Viet Company.pdf
9/19/2018700700 SMC4-MA-116 Report on Frequency Test of Reinforcing Steel for Pile Cap & Column of P36, P37.pdf
9/19/2018701701 SMC4-Acceptance Invitation 19Sep2018.pdf
9/20/2018702702 SMC4-AD-01 As-Built Drawings of CIP Concrete Pile for Pier P31.pdf
9/20/2018703703 SMC4-MA-118 Report on Frequency Test of PC Strand for Super T Girder (1st).pdf
9/20/2018704704 SMC4-MA-117 Report on Frequency Test of Cement for Grouting Sonic Tube (2nd).pdf
9/20/2018705705 SMC4-RP-29 Submision of Report on Trial Excavation of CIP Concrete Piles- Hole H3'P20.pdf
9/21/2018706706 SMC4 Acceptance Invitation.pdf
9/21/2018707707 SMC4-MA-119 Capacity Profile of Manufacturer & Supplier of No-Shrink, Flowable Grout -Nutech Jsc.pdf
9/21/2018708708 SMC4-WD-79 WD of Substructure - Pile cap of P34 (2nd).pdf
9/21/2018709709 SMC4-WD-80 WD of Substructure - Pile cap of P36 (2nd).pdf
9/21/2018710710 SMC4-WD-81 WD of Substructure - Pile cap of P37 (2nd).pdf
9/21/2018711711 SMC4-LC-242 Notice on Enviromental Monitoring Schedule in Sep18 in the Construction Phase.pdf
9/22/2018712712 SMC4-LC-243 Report on Environmental Monitoring at Construction Phase (August 2018).pdf
9/24/2018713713 SMC4-MS-65 Method Statement of Structure Excavation from P19-P22.pdf
9/24/2018714714 SMC4-MS-64 Traffic Control Plan for Public Road at P23-P28 & P38-P43 Left Side (3rd).pdf
9/24/2018715715 SMC4-WD-83 WD of SuperT Girder Span P37 (2nd).pdf
9/24/2018716716 SMC4-WD 82 WD of Super T Girder Span 36 (P35-P36) (2nd).pdf
9/24/2018717717 SMC4-WD-84 WD of Substruture - Pile Cap of P33 (2nd).pdf
9/24/2018718718 SMC4-WD-85 WD of Substruture - Pile Cap of Pier P35 (2nd).pdf
9/25/2018719719 SMC4-MA-121 Report on Frequency Test of Cemen, Crushed Stone, Yellow Sand for Cement Concrete at Asean BP (4th).pdf
9/25/2018720720 SMC4-LC-246 Submission of Weekly Report No.19.pdf
9/25/2018721721 SMC4-MA-120 Profile of Manufacturer & Supplier for Steel Plate, Shape, Filler Metal for Steel Bridge Hyundai Cor. Thanh Long Group JSC.pdf
11/13/2018722722 SMC4-LC-245 Variation Order 001- Test on Concrete Piles & Rotation Steel Piles - Part 1 Test in Concrete Piles.pdf
9/27/2018723723 SMC4-LC-244 Report on Environmental Monitoring in Construction Phase in Aug 2018 ( base on Specification).pdf
9/26/2018724724 SMC4-LC-247 Submission of Environmental Protection Plan for Fabrication Yard.pdf
9/26/2018725725 SMC4-MS-66 MS of Traffic Control for PR at A1-P22 - Vol III.3 Playout of Flag man, Signboard for Traffic Control ( Stage 3- Construction P7-P17 & P18-P22).pdf
9/26/2018726726 SMC4-MA-122 Capacity Profile of Manufacturer & Supplier of Bridge Bearings ( Elastomeric Bearing & Pot Bearing).pdf
9/26/2018727727 SMC4-MA-123 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile P19 & P20.pdf
10/3/2018728728 SMC4-RP-30 Topographic Survey Report at Km1+910-Km2+150 (left side).pdf
9/26/2018729729 SMC4-LC-248 Schedule for Document Submission & Organization Chart of Steel Bridge.pdf
9/26/2018730730 SMC4-MA-124 Report on Frequency Test of Reinforcing Steel for Super T Girder (1st) of Team 1.pdf
9/26/2018731731 SMC4-LC-249 Request for Speeding up Land Handover for PK1 (Km0+130-Km2+812.5).pdf
9/26/2018732732 3773-PMUTL-DHDA1 Interim Payment Certificate (ICP) No.2 PK1.pdf
9/27/2018733733 540-GM-BQLCTGT Meeting for Agreement on Relocation-Connection Raw Water Pipeline DN500 & Fresh Water Pipeline DN300.pdf
9/28/2018734734 SMC4-MA-125 Report on Test Result of uPVC Pipe - North Binh Minh Co.,ltd.pdf
9/28/2018735735 SMC4-MA-126 Capacity Profile of Manufacturer for PC duct - Ngoc Lam Co LTD (3rd).pdf
9/28/2018736736 SMC4-MA-127 Capacity Profile of Manufacturer & Supplier for Epoxy Coated PC Trand & Anchorage- ZHEMAO Co.,ltd - Vinh Hung JSC(2nd).pdf
9/29/2018737737 SMC4-MA-128 Report on Test Result of Steel Plate for Grading, Steel Plate, Joint Steel for RC Pile Head & Auxiliary Steel Material- Viet Thang Co.,Ltd.pdf
9/28/2018738738 SMC4-AD-02 As-built Drawing of CIP Concrete Pile for P34C.pdf
9/28/2018739739 SMC4-MA-121A Report on Ferequency Test of Reinforcing Steel fo CIP Concrete Pile P36, P38, P39, P40.pdf
9/28/2018740740 SMC4-LC-241A Report for Static Loading Test of CIP Concrete Piling C5-P35.pdf
9/28/2018741741 SMC4-WD-86 WD of CIP Concrete Pile for P38.pdf
9/28/2018742742 SMC4-WD-87 WD of CIP Concrete Pile for P39.pdf
9/28/2018743743 SMC-WD-88 WD of CIP Concrete Pile for P40.pdf
9/28/2018744744 SMC4-MS-67 MS of Assembling & Loading Test of Gantry Crane at Fabrication Yard for Super T Girder of Group 2 Co.407.pdf
9/28/2018745745 SMC4-MS-68 MS of Temporary Facilities Arrangement on Site from P38-P43 (2nd).pdf
9/28/2018746746 SMC4-LT-16 Inspection Minute of Building Material & Geotechnics Laboratories LAS-XD 175.pdf
9/29/2018747747 3812-BQLDATL-DA1 Approval for Contractor's Proposal of Key Personnel.pdf
10/1/2018748748 SMC4-MS-69 MS of Traffic Control for Public Road during the Trial Fencing Installation at P23-P28 & P38-P43 left side.pdf
10/1/2018749749 SMC4-MS-70 Calculation for Pre-Stressing of Super TGirder 38m - Group 3 (414 Co.).pdf
10/1/2018750750 SMC4-MA-129 Report on Test Result of Jack, Anchorage & Synchronous Experiment of Jack, PC Strand, Anchorage for Construction Super T Girder(1st).pdf
10/1/2018751751 SMC4-LC-251 Engineer's Confirmation for Safety & Environment Satisfaction (Aug2018).pdf
10/1/2018752752 SMC4-LC-250 Resubmit Additional Supervision Cost of Engineer Staff ( Up to July2018).pdf
10/1/2018753753 SMC4-LC-252 Design Change of Foundation Structure at Some Location of Piers, Abutments.pdf
10/1/2018754754 SMC4-LC-253 Notice of Equipment Demobilization of Team 2- 407 Co..pdf
10/2/2018755755 3855-BQLDATL-DHDA1 Invitation letter of Fencing & Traffic Lane Distribution on PVD Road for Execution of the PVD Road for Execution of the Project (Stage 3).pdf
10/2/2018756756 769-TB-SGTVT Notice on Fencing & Traffic Lane Distribution on PVD Road for Execution of the Project (stage 3).pdf
10/3/2018757757 SMC4-LC-254 Withdrawal of Letter MS-57 dated 7 Sep 2018.pdf
10/3/2018758758 SMC4-MS-72 Supplement & Updating the MS Plan Drawing of CIP Concrete Pile P38-P43.pdf
10/3/2018759759 SMC4-MS-71 Supplement & Re Updating the MS Plan Drawing of Trial Excavation & CIP Concrete Pile P23-P28.pdf
10/3/2018760760 3827-BQLDATL-DHDA1 The Payment for the Interim Payment Certificate No.02 of PK1.pdf
10/16/2018761761 SMC4-LC-255 Resubmit for Interim Payment Certificate No.03 ( period 1Aug2018 to 31Aug2018).pdf
10/4/2018762762 SMC4-LC-256 Reply to the Letter RE1-0316-1.70 dated 27 Sep 2018.pdf
10/4/2018763763 SMC4-LC-257 Changing Position of Cable C7, C8, C9 in Pier Head - B24M-Type CA1, CB1.pdf
10/4/2018764764 SMC4-LC-258 Submission of Weekly Report No.20.pdf
10/4/2018765765 SMC4-LC-259 Submission of Monthly Report No.5.pdf
10/12/2018766766 SMC4-MS-73 MS of Temporary Facilities Arrangement on Site from P23-P29 (2nd).pdf
10/4/2018767767 SMC4-LC-260 Notice on Implementation of Assembling Work for Gantry Crane Group 2-407 Co. at Super T Fabrication Yard.pdf
10/5/2018768768 SMC4-LC-254A Interim Payment Certificate No.02 Period 01June2018 to 31July2018.pdf
10/4/2018769769 SMC4-LC-262 Submission of Result of Tip Contact Checking Test of CIP Concrete Piles at C3-P30.pdf
10/4/2018770770 SMC4-MA-130 Technical Profile of Coarse Aggregae, Fine Aggegate & Water for Home World Batching Plant.pdf
10/4/2018771771 SMC4-LC-261 Withdrawal of the Letter SMC4-LC-0254A18 dated 03 October, 2018.pdf
10/5/2018772772 SMC4-LP-25 Submission of VAT Invoices for Interim Payment Certificate No.02 PK1.pdf
10/6/2018773773 SMC4-LC-264 Notice of Environmental Monitoring Schedule in Oct 2018 at Construction Phase.pdf
10/6/2018774774 SMC4-LC-263 Notice on Temporary Suspension of Environmental Monitoring at Some Locations.pdf
10/6/2018775775 SMC4-WD-90 WD of CIP Concrete Pile for P41.pdf
10/6/2018776776 SMC4-MS-74 MS of Demolition & Relocation of Existing Utilities (stage 3).pdf
10/6/2018777777 SMC4-MA-131 Capacity Profile of Manufacturer & Supplier for Painting Material for Steel Bridge Hai Phong Paint JSC.pdf
10/6/2018778778 SMC4-MA-133 Report on Test Result of PC Strand 15.2 of Dong il Steel MFG Co.Ltd.pdf
10/6/2018779779 SMC4-MA-130A Report on Frequency Test of Cement, Cushed Stone, Yellow Sand, Admixture & Water for Cement Concrete at ASEAN (5th).pdf
10/6/2018780780 SMC4-WD-89 WD of SuperT Girder Span 35 (P34-P35) (2nd).pdf
10/6/2018781781 SMC4-MA-132 Capacity Profile of Batching Plant Viet Tiep.pdf
10/6/2018782782 Working Minutes 03Oct2018 Evaluation of the Actual Situation of Traffic Division & Organization under the 225 & Checking the Trial Fencing Work under 769 of DOT.pdf
10/6/2018783783 Minutes of Handing Over Traffic Signal System 09 Oct 2018 in HQV & Nam Cuong Intersection.pdf
10/6/2018784784 SMC4-LC-265 Engineer's Confirmation for Safety & Environment Satisfation ( Sep2018).pdf
10/6/2018785785 SMC4-LC-266 Notice of Equipment Re Mobilization for Construction.pdf
10/8/2018786786 SMC4-AD-03 Proposal for Approval of As-Built Drawing of CIP Concrete Pile for Pier P33C.pdf
10/8/2018787787 SMC4-MA-134 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile P33, P34 (4th).pdf
10/9/2018788788 SMC4-MA-135 Report on Test Result of uPVC Pipe for SuperT Gider & Proposal for uPVC Pipe used for Drainage System of Thuan Phat JSC.pdf
10/9/2018789789 SMC4-LC-267 Submission of Weekly Report No.21.pdf
10/9/2018790790 SMC4-WD-91 WD of CIP Concrete Pile for P42.pdf
10/9/2018791791 SMC4-WD-92 WD of CIP Concrete Pile for Pier P43.pdf
10/9/2018792792 SMC4-WD-93 Calculation Sheet for Camber Steel Girder.pdf
10/11/2018793793 SMC4-WD-94 WD of Substructure - Column and Pier Head of P31 (2nd).pdf
10/10/2018794794 Acceptance Invitation 09Oct2018 of Completion of Pile Foundation at P33C.pdf
10/10/2018795795 SMC4-LC-268 Design Change of Foundation Structure at Some Location of Piers, Abutments.pdf
10/11/2018796796 SMC4-AD-04 Approval of As built Drawings of Cast In Place Concrete Pile for P37.pdf
11/1/2018797797 SMC4-MS-75 Temporary Traffic Control Plan at Sections A1-P22 & P29-P37.pdf
10/11/2018798798 SMC4-LC-269 Result of Environment Monitoring at Construction Phase (1st Sep2018. Parameter TSP).pdf
10/11/2018799799 SMC4-MS-76 Traffic Control Method for Public Roads - Relocation of Light System at HQV (2nd).pdf
10/11/2018800800 SMC4-MA-136 Report on Test Result of Bituminous Waterproofing for Concrete HAN BT.pdf
10/11/2018801801 SMC4-MA-137 To Choose the Paint for Concrete Structure & Completion Paint Layer of Steel Structure.pdf
10/11/2018802802 SMC4-WD-95 WD of CIP Concrete Pile for P32C (2nd).pdf
10/11/2018803803 SMC4-MS-77 MS of Temporary Facilities Arrangement on Site From P38-P43 (3rd).pdf
10/12/2018804804 Acceptance Invitation of Completion of Pile Foundation at P37 11Oct18.pdf
10/12/2018805805 SMC4-MA-138 Report on Test of Reinforcing Steel for Pile Cap, Pile Column, Pier Head P29, P30, P31.pdf
10/12/2018806806 SMC4-MA-139 Report on Test Result of Borrow Material.pdf
10/17/2018807807 SMC4-WD-96 WD of Substructure - Pile Cap P20 (2nd).pdf
10/17/2018808808 SMC4-WD-97 WD of Substructure - Pile Cap of P21 (2nd).pdf
10/17/2018809809 SMC4-WD-98 WD of Substructure of Substructure - Pile Cap of P22 (2nd).pdf
10/12/2018810810 SMC4-WD-99 WD of Demolition & Removal of Existing Utilities - Drainage System from P26-P35.pdf
10/12/2018811811 SMC4-WD-100 WD of Structure Excavation & Backfill for P29-P37 (3rd).pdf
10/12/2018812812 SMC4-MC-05 Application for IPC No.4.pdf
10/12/2018813813-03-CDECE-Report on Implementation HIV-AIDS Prevention Program (Sept.2018).pdf
10/15/2018814814 4004 GM-BQLDATL Invitation Letter.pdf
10/22/2018815815 SMC4-LC-270 Result of Ultrasonic Test of CIP Concrete Piles at P21.pdf
10/15/2018816816 SMC4-MA-142 Report on Test Result of Jack, Anchorage & Synchronous Experiment of Jack, PC Strand, Anchorage for Construction Super T Girder (2nd).pdf
10/15/2018817817 SMC4-MA-141 Report on Frequency Test of PC Strand for SuperT Girder (2nd time).pdf
10/15/2018818818 SMC4-MA-140 Report on Frequency Ttest of Reinforcing Steel for CIP Concrete Piles of Pier P35 (3rd time).pdf
10/15/2018819819 SMC4-MS-78 Calculation for Pre-Stressing of SuperT Girder 28m-Group No.2 (407 Co).pdf
10/15/2018820820 SMC4-MA-143 Report on Frequency Test of Reinforcing Steel for SuperT Girder (1st time) of Team 2.pdf
10/16/2018821821 SMC4-AD-05 As-built Drawing of CIP Concrete Pile for P21 (1).pdf
10/16/2018822822 SMC4-LC-271 Additional Supervision Cost of Engineers Staff (August 2018).pdf
10/16/2018823823 SMC4-WD-100A WD of Substructure- Column & Pier Head of P34.pdf
10/17/2018824824 SMC4-LC-272 Schedule for Document Submission & Organization Chart of Steel Bridge.pdf
10/17/2018825825 SMC4-LC-273 Submission of Weekly Report No.22.pdf
10/17/2018826826 SMC4-MS-79 Traffic Control Plan for Public Road for Construction at P7-P17 (2nd).pdf
10/17/2018827827 SMC4-MA-144 Profile of Supplier Thang Long JSC for Borrow Material of Minh Dat JSC.pdf
10/17/2018828828 SMC4-AD-06 Proposal for AD of CIP Concrete Pile for P29.pdf
10/17/2018829829 SMC4-AD-07 Proposal for AD of CIP Cocrete Pile P30.pdf
10/17/2018830830 SMC4-MS-80 MS for Assembling & Loading Test of Gantry Crane at Fabrication Yard for Super T Girder of Group No.01 -Co.422.pdf
10/17/2018831831 SMC4-LC-274 Submission of Result of Ultrasonic Test of CIP Concrete Piles at P22.pdf
10/17/2018832832 SMC4-LC-275 Submission of Result of Ultrasonic Test of CIP Concrete Piles at P29.pdf
10/17/2018833833 4055 PMUTL-DHDA1 Implementation of MOT Decision No.2172-QD-BGTVT Date 9.10.18.pdf
11/15/2018834834 SMC4-WD-101 WD of Substructure - Column & Pier Head of P36.pdf
11/2/2018835835 SMC4-WD-102 WD of Substructure - Column & Pier Head of P37.pdf
10/18/2018836836 4071-BQLDATL-DHDA1 Evaluate the Actual Traffic Control & Traffic Organization of PK1.pdf
10/19/2018837837 SMC4-MS-81 Supplement Method for Lifting Super T Girder by Cranes at Fabrication Yard of Group 2 - 407 Co..pdf
10/19/2018838838 SMC4-MA-145 Capacity Profile of Manufacturer & Supplier of Non-woven Geotextile-VN Geotextile JSC.pdf
10/19/2018839839 SMC4-LC-276 Result of Ultrasonic Test of CIP Concrete Piles at P33L.pdf
10/19/2018840840 SMC4-LC-277 Result of Ultrasonic Test of CIP Concrete Pile P34L.pdf
10/19/2018841841 SMC4-WD-103 WD of Substructure - Column & Pier Head P33.pdf
10/19/2018842842 SMC4-AD-08 As Built Drawings of CIP Concrete Pile at P36.pdf
10/26/2018843843 SMC4-MA-146 Report on Test Result of Base & Subbase Material at Trung Do Moutain (KV5) , Cao Duong Commune, Luong Son, Hoa Binh.pdf
10/22/2018844844 SMC4-LC-278 Changing Road Pavement Structure for Temporary Road at the U turn Areas P24-P25 & P37-P38.pdf
10/22/2018845845 SMC4-LC-0273A Report for Static Loading Test of CIP Concrete Piling, Pile No.C4-P22.pdf
10/22/2018846846 SMC4-LC-0279 Result of Ultrasonic Test of CIP Concrete Piles at P36.pdf
10/22/2018847847 SMC4-WD-104 WD of CIP Concrete Pile for P17 (2nd ).pdf
10/22/2018848848 SMC4-MS-82 Method Statement of Pile Cap From P23-P28.pdf
10/22/2018849849 SMC4-MS-83 Method Statement of Structure Excavation from P23-P28.pdf
11/6/2018850850 SMC4-MS-84 Method Statement for Lower Part of Pier Head from P29-P37.pdf
10/22/2018851851 SMC4-WD-105 WD of CIP Concrete Pile for Pier P18 (2nd ).pdf
10/22/2018852852 1910-CDECE-KHHIV-MDNTL Changing 01 training course Location 10.2018.pdf
10/23/2018853853 SMC4-WD-110 WD of Substructure - Column & Pier Head of P21.pdf
11/2/2018854854 SMC4-WD-112 WD of Substructure - Column & Pier Head of P30.pdf
11/10/2018855855 SMC4-WD-111 WD of Substructure - Column & Pier Head of P29.pdf
10/23/2018856856 SMC4-WD-113 WD of Structure Excavation & Backfill for Section P18-P28.pdf
10/23/2018857857 SMC4-WD-108 WD of SuperT girder span 27 (P26-P27).pdf
10/23/2018858858 SMC4-MA-147Capacity Profile of Manufacturer & Supplier Vinh Thuc Co.,LTD for Auxiliary Steel Material for Super T Girder.pdf
10/23/2018859859 SMC4-LC-280 Withdrawal of the Letter SMC4-MA-0132 dated 05Oct2018.pdf
10/23/2018860860 SMC4-WD-109 WD of Super T Girder Spans 28 & 29.pdf
10/23/2018861861 SMC4-WD-106 WD of CIP Concrete Pile for P23 (2nd).pdf
10/23/2018862862 SMC4-WD-107 WD of CIP Concrete Pile for P27 (2nd).pdf
10/23/2018863863 SMC4-MS-86 MS of Pile Cap P19-P22.pdf
10/23/2018864864 SMC4-MS-85 Supplement & Updating the MS Plan Drawing of Trial Excavation Hole No. H10P42- 422 Co..pdf
10/23/2018865865 SMC4-LC-281 Site Hand Over of PK1 (Km0+130-Km2+812.5).pdf
10/26/2018866866 SMC4-MA-146A Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile P19 & P20 (2nd).pdf
10/25/2018867867 SMC4-LC-282 Submission of Weekly Report No.23.pdf
10/26/2018868868 SMC4-MA-148 Profile of Anchorage 15-19 Manufactured by Zhemao Science and Technology,Supplier By Vinh Hung Trading Consulting.pdf
11/13/2018869869 SMC4-MA-0149 The Characteristic Strength for Concrete class Y of Asean Batching plant-Report No.2.pdf
10/26/2018870870 SMC4-LC-285 Detail Schedule of Super-T Fabrication Yard and Steel Bridge.pdf
10/29/2018871871 SMC4-LC-283 Updates Environmental Control Plan (5th Submission).pdf
10/26/2018872872 SMC4-LC-284 Acceptance of CIP Concrete Pile Foundation Construction atage and Transfer to Construction of Substructure work for P21.pdf
10/26/2018873873 Site Minutes Date 24.10.18.pdf
10/27/2018874874 SMC4-MA-146B Notice on Changing Name of Supplier for Reinforcing Steel of Vietnam Germany Steel Mill JSC(VGS) & Vietnam Italy Steel (VIS).pdf
11/16/2018875875 SMC4-MA-150 Drawing & Calculation Sheet for Laminated Elastomeric Bearings.pdf
10/27/2018876876 SMC4-WD-114 WD of CIP Concrete Pile for P9.pdf
10/27/2018877877 SMC4-WD-115 WD of CIP Concrete Pile for P10.pdf
10/27/2018878878 SMC4-WD-116 WD of CIP Concrete Pile for P11.pdf
10/27/2018879879 SMC4-WD-117 WD of CIP Concrete Pile for P12.pdf
10/27/2018880880 SMC4-WD-118 WD of CIP COncrete Pile for P13.pdf
10/27/2018881881 SMC4-WD-119 WD of CIP Concrete Pile for P14.pdf
10/27/2018882882 SMC4-WD-120 WD of CIP Concrete Pile for P15.pdf
10/27/2018883883 SMC4-WD-121WD of CIP Concrete Pile for P43C (2nd).pdf
10/27/2018884884 4181-PMUTL-DA1-Implementation of MOT's Letter No.12023-BGTVT-TCQM 23.10.2018.pdf
10/27/2018885885 SMC4-MA-155 Report on Frequency Test of Reinforcing Steel for Super T Girder (1st) of Team 4.pdf
10/27/2018886886 SMC4-MA-151 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile at P38, P39, P40 (2nd).pdf
10/27/2018887887 SMC4-MA-152 Report on Frequency Test of Reinforcing Steel for Pile Cap & Pier Column of P21.pdf
10/27/2018888888 SMC4-MA-153 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile of P18.pdf
10/27/2018889889 SMC4-MA-154 Capacity Profile of Manufacturer & Supplier for Welding Material for Steel Bridge-Hyundai Welding Co..pdf
10/27/2018890890 SMC4-RP-31 Report on Checking the Periodic Benchmarks System (1st).pdf
10/29/2018891891 SMC4-MS-87 MS of Traffic Control at P23-P28 & P38-P43.pdf
10/29/2018892892 SMC4-AD-09 As Built Drawings of CIP Concrete Pile for P22.pdf
10/30/2018893893 SMC4-MS-88 Method of Protection Cable Head after Finish Cutting Tenden Cable Work of SuperT Girder.pdf
10/30/2018894894 SMC4-MA-156 Report on Frequency Test of Reinforcing Steel of VN Germany Steel for SuperT Girder (2nd) of Team 2.pdf
10/30/2018895895 SMC4-WD-122 WD of Substructure - Pile Cap of P40.pdf
12/5/2018896896 SMC4-WD-123 WD of Precast Plank for SuperT Girder.pdf
10/31/2018897897 SMC4-WD-124 WD of Substructure - Column and Pier Head P22.pdf
10/31/2018898898 SMC4-WD-125 WD of Substructure - Column and Pier Head of P35.pdf
10/31/2018899899 SMC4-LC-287 Submission of Weekly Report No.24.pdf
10/31/2018900900 SMC4-LC-286 Resubmit for Interim Payment Certificate No.02 ( Period 01June2018 to 31July2018).pdf
11/1/2018901901 SMC4-LC-287A Withdrawal of the Letter SMC4-LC-025518 dated 03Oct2018.pdf
11/2/2018902902 SMC4-MA-159 Report on Frequency Test of Reinforcing Steel of VN Germany Steel for Pile Cap,Pier Column & Pier Head of P36, P37 (2nd).pdf
11/2/2018903903 SMC4-MS-89 Calculation for Pre-Stressing of SuperT Girder 38m Group No.1 (422 Co.).pdf
11/2/2018904904 SMC4-MA-157 Report on Frequency Test of PC Strand for Super T Girder (3rd).pdf
11/2/2018905905 SMC4-MA-158 Report on Test Result of Jack, Anchorage & Synchrounous Experiment for SuperT Girder (3rd).pdf
11/2/2018906906 SMC4-LC-289 Notice of Environmental Monitoring Schedule in Nov 2018 at Construction Phase.pdf
11/2/2018907907 SMC4-WD-126 WD of Substructure - Pile Cap of P19.pdf
11/2/2018908908 SMC4-LC-288 Application for Interim Payment Certificate No.03 ( Period 01AUG2018 to 30SEP2018).pdf
11/1/2018909909 4247 GM BQLDATL Invitation date 6.11 Review the Progress & Implementation of the Project.pdf
11/2/2018910910 SMC4-LP-26 Report on the Work Suspension of Traffic Signs at HQV Intersection.pdf
11/3/2018911911 SMC4-MA-161 Report on Frequency Test of Steel for Pier Column & Pier Head P31, Pile Cap & Column P29 & P30.pdf
11/3/2018912912 SMC4-MA-160 RP on Frequency Test of Reinforcing Steel for CIP CP of P32,P33,(5th), Substructure of P33,P34,P35 (2nd), PileCap of P36 (2nd) & PierColumn of P36(1st).pdf
11/3/2018913913 SMC4-LC-290 Submission of Environment Monitoring Data at Pre-Construction & Construction Phases.pdf
12/28/2018914914 SMC4-LC-291 TOR & Cost Estimate for General Traffic Control for Public Roads.pdf
11/5/2018915915 SMC4-LC-292 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P36.pdf
11/5/2018916916 SMC4-AD-10 Proposal for AD of CIP Concrete Pile of P36.pdf
11/23/2018917917 SMC4-LC-293 Document for 2nd Additional Mobilization of Team 4 -Co.422.pdf
11/6/2018918918 SMC4-LC-294 Design Change Document for Drainage System on Bridge.pdf
11/27/2018919919 SMC4-LC-295 Design Change Document for Foundation Structure at P4-P8,P44,P59 & Change Elevation of Pile Cap at P1-P3,P60.pdf
11/6/2018920920 SMC4-MA-162 Report on Frequency Test of PC Ctrand for Super T Girder (4th).pdf
11/7/2018921921 SMC4-LT-17 Capacity Profile of Laboratory LAS-XD 1733 of TIEN THANH JSC.pdf
11/7/2018922922 SMC4-MA-163 Mix Proportion for Trial Mix Class A ( Version 2) & Y (Version 2) at Batching Plant ASEAN.pdf
11/7/2018923923 SMC4-LC-296 Engineer's Confirmation for Safety & Environment Satisfaction (October 2018).pdf
11/7/2018924924 SMC4-LC-297 Submission of Weekly Report No.25.pdf
11/7/2018925925 SMC4-WD-127 WD of Substructure- Column & Pier Head P20.pdf
11/7/2018926926 SMC4-WD-128 WD of Substructure- Column & Pier Head P17.pdf
11/7/2018927927-SMC4-WD-129 WD of Substructure- Column & Pier Head P18.pdf
11/7/2018928928 SMC4-WD-130 WD of Substructure-P23.pdf
11/7/2018929929 SMC4-WD-131 WD of Substructure- P24.pdf
11/7/2018930930 SMC4-WD-132 WD of Substructure-P38.pdf
11/7/2018931931 SMC4-WD-133 WD of Substructure-P39.pdf
11/7/2018932932 SMC4-WD-134 WD of Substructure- P40.pdf
11/8/2018933933 4283-BQLDATL-DHDA1 Traffic Control during Construction of Project- MD-STL Section.pdf
11/8/2018934934 4015-PMUTL-DA1 Approval of Variation Order No. VO-HRR3-PK1-001 of Test on Concrete Piles.pdf
11/9/2018935935 SMC4-MS-90 Supplement Method Drawing Divided Layer of Backfilling Foundation P29-P37.pdf
11/8/2018936936 SMC4-LC-298 Submission of Monthly Report No.6.pdf
11/8/2018937937 SMC4-MA-164 Capacity Profile of Viet Tiep Batching Plant.pdf
11/9/2018938938 SMC4-WD-148 WD of CIP Concrete Pile for P58.pdf
11/9/2018939939 SMC4-WD-147 WD of CIP Concrete Pile for P57.pdf
11/9/2018940940 SMC4-WD-146 WD of CIP Concrete Pile for P56.pdf
11/9/2018941941 SMC4-WD-135 WD of CIP Concrete Pile for P45.pdf
11/9/2018942942 SMC4-WD-136 WD of CIP Concrete Pile for P46.pdf
11/9/2018943943 SMC4-WD-137 WD of CIP Concrete Pile for P47.pdf
11/9/2018944944 SMC4-WD-138 WD of CIP Concrete Pile for P48.pdf
11/9/2018945945 SMC4-WD-139 WD of CIP Concrete Pile for P49.pdf
11/9/2018946946 SMC4-WD-140 WD of CIP Concrete Pile for P50.pdf
11/9/2018947947 SMC4-WD-141 WD of CIP Concrete Pile for P51.pdf
11/9/2018948948 SMC4-WD-142 WD of CIP Concrete Pile for P52.pdf
11/9/2018949949 SMC4-WD-143 WD of CIP Concrete Pile for P53.pdf
11/9/2018950950 SMC4-WD-144 WD of CIP Concrete Pile for P54.pdf
11/9/2018951951 SMC4-WD-145 WD of CIP Concrete Pile for P55.pdf
11/9/2018952952 SMC4-LC-299 Report on Environment Monitoring at Pre Construction & Construction Phases (8.2018).pdf
11/12/2018953953 SMC4-MA-165 Report on Frequency Test of PC Strand for Super T Girder (5th).pdf
11/9/2018954954 04-CDECE-MDNTL Report on the Implementation on October 2018 HIV-AIDS Prevention Program for Project.pdf
11/12/2018955955 SMC4-MS-91 MS of Traffic Control at P7-P18.pdf
11/10/2018956956 SMC4-WD-149 WD for Miscellaneous-Drainage-Genenal Layout of Drainage under Viaduct.pdf
11/12/2018957957 SMC4-LC-300 Proposal for Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Constructure of Substruction Work for P29.pdf
11/12/2018958958 SMC4-LC-301 Proposal for Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P22.pdf
11/12/2018959959 SMC4-LC-302 Report on Environment Monitoring at Construction Phases (June and July 2018).pdf
11/12/2018960960 SMC4-MA-168 Report on Test Result of PC duct of Ngoc Lam Production & Trading Co..pdf
11/12/2018961961 SMC4-AD-11 AD of CIP Concrete Pile for P22.pdf
11/12/2018962962 SMC4-AD-12 AD of CIP Concrete Pile for P29.pdf
11/12/2018963963 SMC4-MS-92 MS of Pier Column P19-P22.pdf
11/10/2018964964 4356 TB BQLDATL Notice on Conclusions Given by PMU Thang Long in the Meeting to Review the Implementation.pdf
11/13/2018965965 SMC4-MA-169 Report on Trial Mix of Concrete Class A,B1,C1,C3,C4,D,G,Y of Transmeco BP (used Mighty Admixture).pdf
11/13/2018966966 SMC4-MA-170 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile P41 & P42.pdf
11/13/2018967967 SMC4-MA-171-Report on Test Result of Tie Anchoe (U-Bolt) & Dowel of Viet Thang Co..pdf
11/13/2018968968 SMC4-MA-166 Report on Frequeny Test of Reinforcing Steel for Pile Cap, Column & Pier Head of P21(2nd).pdf
11/13/2018969969 SMC4-LC-303 Notice on Re Mobilization of Drilling Machine of Team 4- 422 Co..pdf
11/13/2018970970-SMC4-LC-304 Submission of Weekly Report No.26.pdf
11/14/2018971971 SMC4-LC-305 TOR & Cost Estimate for Environment Monitoring Item Part 1-Base on Appendix A of the Technical Specifications.pdf
11/14/2018972972 SMC4-LC-306 TOR & Cost Estimate for Environment Monitoring Part 2- Base on Clause S1.43 of Technical Specification.pdf
11/14/2018973973 SMC4-LC-307 Withdrawal of Letter SMC4-MA-0082 dated 27 July 2018.pdf
11/14/2018974974 SMC4-LC-308 Result of Ultrasonic Test of CIP Concrete Piles at P19.pdf
11/14/2018975975 SMC4-LC-309 Result of Ultrasonic Test of CIP Concrete Piles at P20.pdf
11/14/2018976976 SMC4-MA-167 Profile of Manufacturer & Supplier for Painting Material for Steel Bridge- Jotun Paints VN Co.,Ltd.pdf
11/14/2018977977 SMC4-MS-93 Supplement Method Drawing the Divided Layer of Backfilling Foundation from P19-P22.pdf
11/14/2018978978 SMC4-WD-150 WD of Substructure - Pier P25.pdf
11/14/2018979979 SMC4-WD-151 WD of Substructure P27.pdf
11/14/2018980980 SMC4-WD-152 WD of Substructure - Pier P41.pdf
11/14/2018981981 SMC4-MA-172 Mix Proportion for Trial Mix Class B1, C1,C3,C4,D,E,G,Y at Home World BP (using Mighty Admixture).pdf
11/15/2018982982 SMC4-MA-173 Capacity Profile of Manufacturer Posco for Steel Plate, Shape & Filler Metal for Steel Bridge.pdf
11/14/2018983983 SMC4-MA-175 The Plan of Relocation of ASEAN BP & Proposal for Early Approval of Viet Tiep BP.pdf
11/16/2018984984 SMC4-LC-310 Proposal for Payment for SuperT girders & Excavation with Cofferdam.pdf
11/16/2018985985 SMC4-LC-311 Submission for Result of Internal Inspection at Fabrication Yard.pdf
11/16/2018986986 SMC4-MA-174 Capacity Profile of Coupler Manufacturer Tran Huy Construction Trading JSC.pdf
11/16/2018987987 SMC4-MA-176 Report on Frequency Test of Reinforcing Steel Vn Germany Steel for Pile Cap, Pier Column Pier Head P28(1st) P29(4th), Pier Head P30 & P31 (4th).pdf
11/16/2018988988 SMC4-MA-177 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile P28.pdf
11/16/2018989989 SMC4-MS-94 Traffic Control Method for Public Roads- Arranging of Traffic Control at P24-P25 & P37-P38.pdf
11/21/2018990990 SMC4-MS-95 MS of Traffic Control for Public Road at P38-P43-Volume VI.1 Plan Layout of Flagman, Signboard & Detour Road.pdf
11/26/2018991991 SMC4-LC-312 Changing Road Pavement Structure for Detour Road at P38-P43 Right Side.pdf
11/16/2018992992 SMC4-LC-313 Report on Environment Monitoring at Construction Phases (September & October 2018).pdf
11/16/2018993993 SMC4-MC-06 Interim Payment No 4 ( Period 01 Oct2018 to 31 Oct2018).pdf
11/16/2018994994 SMC4-WD-153 WD of SuperT Girder Span 38 (P37-P38).pdf
11/16/2018995995 SMC4-LC-314 Proposal for Replacement of Structure Engineer for Project-PK1.pdf
11/19/2018996996 SMC4-MA-178 Report on Frequency Test of Reinforcing Steel-VN Germany Steel for Pile Cap, Pier Column, Pier Head P19,P20 &P22 (1st).pdf
11/19/2018997997 SMC4-MS-96 Supplement the Method Darwing of CIP Concrete Piling.pdf
11/20/2018998998 SMC4-MS-97 Traffic Control Method for Public Roads- Arranging ofr Temporary Lighting System at P24-P25 & P37-P38.pdf
11/19/2018999999 SMC4-MA-179 Submission of Characteristic Strenghth for Concrete Class Y of ASEAN BP - Report No.3.pdf
11/19/201810001000 SMC4-MS-98 Traffic Control Plan for Public Road at P46-P49 Left Side & P55-P60.pdf
11/20/201810011001 SMC4-WD-154 WD for Miscellaneous - Basement for Traffic Sign Board at P37.pdf
11/20/201810021002 SMC4-LC-315 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P35C.pdf
11/21/201810031003 SMC4-MA-180 Inspection Minutes of Home World BP & Report on Solving all Remaining Content.pdf
11/21/201810041004 SMC4-MA-181 Capacity Profile of VIET TIEP BatchingPlant (2nd ).pdf
11/21/201810051005 SMC4-MA-182 Technical Profile of Coarse Aggregate, Fine Aggregate & Water & Mix Proportion of Concrete for Viet Tiep BP.pdf
11/21/201810061006 SMC4-MA-183 Report on Frequency Test of Cement, Crushed Stone, Yellow Sand for Cement Concrete at ASEAN BP (6th).pdf
11/21/201810071007 SMC4-AD-13 AD of CIP Concrete Pile for P35C.pdf
11/21/201810081008 SMC4-LC-316 Contractor's Programme (Rev 1).pdf
11/21/201810091009 SMC4-MA-184 Report on Testing Results of Water for Home World Batching Plant.pdf
11/21/201810101010 SMC4-WD-155 WD of Column and Pier Head of P19.pdf
11/22/201810111011 SMC4-MA-185 Proposal for Approval of Report on Frequency test of Reinforcing Steel for Pier Column and Pier Head of Pier P33,P34,P35,P36 and P37 (3rd Time).pdf
11/22/201810121012 SMC4-MA-186 Proposal for Approval of Report on Frequency test of Reinforcing Steel for Pier Column and Pier Head of Pier P36 (4th Time).pdf
11/22/201810131013 SMC4-LC-317 Submission of Manpower Report No.1 (407 ,423 Co).pdf
11/27/201810141014 SMC4-LC-323 Document for Additional Mobilization of Team 3 - 412 Co.pdf
11/27/201810151015 SMC4-LC-318A Submission of Weekly Report No.27.pdf
11/24/201810161016 SMC4-LC-319 Cost Estimate from Rotation Steel Pile into CIP Concrete Pile Item.pdf
11/24/201810171017 SMC4-LC-321 Result of Ultrasonic Test of CIP Concrete Piles at P34R.pdf
11/24/201810181018 SMC4-LC-322 Result of Ultrasonic Test of CIP Concrete Piles at P35L,P35R.pdf
11/24/201810191019 SMC4-MA-187 Capacity Profile of Manufacturer & Supplier for Bearing-Kwang Won Industrial Company-Transport Materials Equipment Trading JSC (2nd).pdf
11/24/201810201020 SMC4-LC-320 Submission Breakdown of Cost for Changing Foundation Design at Some Locations of Piers.pdf
11/24/201810211021 SMC4-WD-156 Working Drawings - General View of Main Bridge & Ramp HQV-B(5th).pdf
11/24/201810221022 SMC4-WD-157 Working Drawings of Substructure of Pier P16.pdf
11/24/201810231023 SMC4-MS-100 MS of Traffic Control for Public Road at Section P38-P43-Volume VI.3-Construction Method for Detour Road at P38-P43.pdf
11/24/201810241024 SMC4-LC-318 Proposal for Using Subbase Material for Subgrade Layer of Road Structure for Traffic Control.pdf
12/28/201810251025 SMC4-MS-101 MS of Pier Head from P28-P31.pdf
11/26/201810261026 SMC4-WD-159 Working Drawings of Substructure of Pier P26.pdf
11/26/201810271027 SMC4-RP-32 Report on Trial Excavation of Cast in Place Concrete Piles-Hole No.H4P23.pdf
11/26/201810281028 SMC4-LC-324 Notice on Demobilization of Service Crane of Team 2-407 Co.pdf
11/26/201810291029 13372-BGTVT-VP Invitation to Attend Working Delegation by Minister of MOT for Site Inspection of Some Transport Construction & Investment Projects.pdf
11/26/201810301030 4547-PMUTL-DA6 Strengthening Quality Control for the Whole Project.pdf
11/26/201810311031 SMC4-WD-160 WD of Extension of Pile Top for PDA Test at P23.pdf
11/26/201810321032 SMC4-WD-161 WD of Substructure of P28.pdf
11/26/201810331033 SMC4-WD-162 WD of Extention of Pile Top for PDA Test at P42.pdf
11/26/201810341034 SMC4-WD-158 WD of Substructure of P42.pdf
11/28/201810351035 SMC4-LC-325 Additional Supervision Cost of Engineer's Staff (September 2018).pdf
11/28/201810361036 SMC4-MA-189 Report on Frequency Test of Reinforcing Steel - VGS for Pile Cap, Pier Column, Pier Head P33, P34, P35 (4th).pdf
11/28/201810371037 SMC4-MA-188 Capacity Profile of Manufacturer & Supplier for Bolts & Stud Shear Connectors for Steel Bridge-Daewoo & Khai Nguyen.pdf
11/30/201810381038 SMC4-MS-102 MS of Temporary Facilities Arrangement on Site form P8-P17.pdf
11/28/201810391039 SMC4-MS-99 MS for Transportation of SuperT Girder.pdf
11/28/201810401040 SMC4-MA-190 Report on Frequency Test of Reinforcing Steel- VGS for CIP Concrete Pile of P23,P24,P25,P26 & P27 (1st).pdf
11/28/201810411041 SMC4-LC-327 Submission of video CDs No.1 (May 2018- October 2018).pdf
11/28/201810421042 SMC4-MA-191 Changing Steel Plate SM400 with the Filler Steel Plate 2mm & 5mm in Thickness & Changing the Thickness of the Filler Steel Plate from 5mm to 6mm.pdf
11/28/201810431043 SMC4-LC-326 Submission of Weekly Report No.28.pdf
11/28/201810441044 SMC4-LC-328 Acceptance of CIP Concrete Pile Construction Stage & Transfer to Contruction of Substructure Work for P34L.pdf
11/28/201810451045 SMC4-LC-329 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Contruction of Substructure Work at P20.pdf
11/30/201810461046 SMC4-AD-14 As-Built Drawings of CIP Concrete Pile for P20.pdf
11/30/201810471047 SMC4-AD-15 As-Built Drawings of CIP Pile for Pier P34L.pdf
11/30/201810481048 SMC4-MA-192 Capacity Profile of Manufacturer & Supplier for Stud Shear Connectors - Samjin Fastners Co.Ltd - Duc Son Construction Material Co.Ltd.pdf
11/30/201810491049 SMC4-LC-330 Manpower & Equipment Mobilization Document of Viet Tiep Batching Plant for Concrete Suppling.pdf
12/3/201810501050 SMC4-MA-193 Report on Frequency Test of PC Strand for Super T Girder (6th).pdf
11/30/201810511051 SMC4-LC-332 Notice of Environmental Monitoring Schedule in December 2018 at Construction Phase.pdf
11/30/201810521052 SMC4-LC-331 Result of Environment Monitoring in Construction Phase (1st Phase in Nov 2018 Parameter TSP).pdf
3/29/201810521052-BQLDATL-DA1 Works affected to Construction of Viaduct Investment Project.pdf
12/1/201810531053 661-CQLXD-ĐB1 Result of Site Inspection & Treatment of Some Shortcomings of Construction Quality at HRR3.pdf
3/29/201810531053-BQLDATL-DA1 Agreement on Fencing installation method for traffic control for construction.pdf
12/1/201810541054 13575-BGTVT-CQLXD Treatment of Some Errors of Construction Quality in HRR3.pdf
12/3/201810551055 SMC4-MS-103 Supplement & Updating the Method Statement Plan Drawing of Trial Excavation & CIP Concrete Piling form P11-P17.pdf
12/3/201810561056 SMC4-MS-104 Supplement the MS of Structure Excavation from P32R-P35R.pdf
12/3/201810571057 SMC4-MS-105 Outline for Loading Test of Pier Head'S Supporting System fromP28-P31.pdf
12/3/201810581058 SMC4-LC-334 Changing PDA Test Pile at P23.pdf
12/3/201810591059 SMC4-LP-27 Payment for Super T Girders & Structure Excavation with Coffedam.pdf
12/3/201810601060 SMC4-MA-194 Report on Test of PC Strand for Girder (7th).pdf
12/3/201810611061 SMC4-LC-333 Detail Environment Protection Project & Report on Environment Monitoring of Thanh Long Steel Structure Plant.pdf
12/3/201810621062 SMC4-MA-195 Report on Frequency Test of Reinforcing Steel of VGS for Super T Girder (3rd) of Team 2.pdf
12/3/201810631063 SMC4-MA-196 Report on Frequency Test of Steel VGS for Pile Cap, Column, oier head P19, P20, P22 (2nd).pdf
12/3/201810641064 SMC4-MA-197 Report on Frequency Test of Reinforcing Steel for Super T Girder (2nd) of Team 1.pdf
12/5/201810651065 SMC4-MA-198 Report on Frequency Test of Reinforcing Steel VGS for CIP Concrete Pile of P17(1st).pdf
12/3/201810661066 SMC4-WD-163 WD of Super T Girder Span 41(P40-P41).pdf
12/3/201810671067 SMC4-WD-164 WD of Substructure - Pile Cap Center of P32.pdf
12/3/201810681068 SMC4-WD-165 WD of Diaphragm from Span 10-16 and 20-32.pdf
12/3/201810691069 SMC4-WD-166 WD of Detail of Test Pile 35x35cm.pdf
12/4/201810701070 SMC4-MS-106 MS for Lower Part of Pier Head P19-P22.pdf
12/6/201810711071 SMC4-MS-107 MS for Production of Precast RC Plank of SuperT Girder.pdf
12/4/201810721072 SMC4-MA-199 Report on Test of Reinforcing Steel VGS for Pile Cap,Pier Column, Pier Head P32, P33, P34, P35 (5th).pdf
12/4/201810731073 SMC4-LC-335 Notice of the Leave of our Key Personnel (Safety Manager).pdf
12/5/201810741074 SMC4-MA-201 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile P27.pdf
12/5/201810751075 SMC4-LC-0336 Engineer's Confirmation for Safety & Environment Satisfaction (Nov 2018).pdf
12/5/201810761076 SMC4-LC-0337 Document for 3rd Additional Mobilization of Team 4 - Co.422.pdf
12/5/201810771077 SMC4-MA-200 Report on Test of PC Strand for Super T Girder (8th).pdf
12/6/201810781078 SMC4-MA-202 Report on Frequency Test of Reinforcing Steel VGS for CIP Concrete Pile of P16.pdf
12/6/201810791079 SMC4-WD-167 WD of Elastomric Bearing (P19-P61).pdf
12/6/201810801080 SMC4-LC-338 Replacement of Quality Control Manager.pdf
12/6/201810811081 SMC4-LC-339 TOR & Cost Estimate for Environment Monitoring Part 1- Base on Appendix A of the Technical Specifications (2nd).pdf
12/6/201810821082 SMC4-LC-340 Submission of Weekly Report No.29.pdf
12/6/201810831083 SMC4-MS-54A MS of Traffic Control for Public Road A1-P4-Volume II.3- Additional Slope for Traffic Control Document.pdf
12/6/201810841084 SMC4-LC-341 Changing Position of Supper Coupler & Rebar B1, B2a of Super T Girder.pdf
12/7/201810851085 4637 QD-BQLDATL Approval Decision Design Change Document of Foundation Structure & Raising Elevation of Pile Cap of P44,P59,P60 & Piers from P87 -P98 under HCRR3.pdf
12/7/201810861086 SMC4-LC-342 Reply to the Engineer's Letter Regarding Arrangement of Temporary Facilities on Site at the Section from P8-P43.pdf
12/7/201810871087 SMC4-LC-344 Submission of Monthly Report No.7.pdf
12/7/201810881088 SMC4-LC-345 Report on Environment Monitoring in Construction Stage (2nd Phase in Nov 2018, Parameter TSP).pdf
12/7/201810891089 SMC4-WD-168 Calculation Sheet for Camber of Steel Girder (2nd).pdf
12/7/201810901090 SMC4-LC-346 Notice for Leave of Our Key Personnel (Project Manager).pdf
12/8/201810911091 4715-TB-BQLDATL Notice on Conclusions given by PMUTL on the Meeting to Review the Implementation of PK1 & PK2 under the HCRR3 Construction Project.pdf
12/10/201810921092 SMC4-WD-169 Changing Dimension of Wing of Super T Girder.pdf
12/10/201810931093 SMC4-LC-347 Improvement of Quality for Pier Head's Lower Part Formwork.pdf
12/10/201810941094 SMC4-LC-343 Result of Ultrasonic Test of CIP Concrete Pile at p18.pdf
12/10/201810951095 SMC4-MA-203 Report on Test of Reinforcing Steel VGS for CIP Concrete Piel of P23, P24, P25, P26 (2nd).pdf
12/10/201810961096 SMC4-MA-206 Report on Test Result of Epoxy Coated PC Strand & Anchorage of Zhemao Science and Technology Co..pdf
12/10/201810971097 SMC4-MA-191 Changing Steel Plate SM400 w the Filler Steel Plate 2mm & 5mm in Thickness & Changing the Thickness of the Filler Steel Plate fr 5mm to 6mm.pdf
12/10/201810981098 SMC4-MA-204 Capacity Profile of MINH TAM Batching Plant.pdf
12/10/201810991099 SMC4-LC-348 Result of Tip Contact Checking Test of CIP Concrete Piles C5 at P18.pdf
12/10/201811001100 SMC4-LC-349 Report on Environment Monitoring in Construction Stage (3rd Phase in Nov 2018, Parameter TSP).pdf
12/10/201811011101 SMC4-LO-37 Urgent Request to Import Steel Material to the Mill as Committed Schedule.pdf
12/11/201811021102 SMC4-RP-33 Report on Trial Excavation of CIP Concrete Piles - Hole No. H1P14.pdf
12/11/201811031103 SMC4-MS-108 Outline for Loading Test of Pier Head's Supporting System at P31.pdf
12/11/201811041104 SMC4-MA-207 TOR for Testing of Elastomeric Bearing.pdf
1/23/201911051105 SMC4-MA-205 Report on Test of Cement,Coarse Aggregates, Fine Aggregates for Cement Concrete at ASEAN Batching Plant ( 7th to 13th).pdf
12/11/201811061106 SMC4-MA-208 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column, Pier Head of P19 (3rd).pdf
12/11/201811071107 4757-BQLDATL-DHDA1 Invitation to attend the Site Inspection in order to Evaluate the Actual Traffic Control.pdf
12/13/201811081108 SMC4-MC-07 Interim Payment Certificate No.05 ( Period 1Nov2018 to 30Nov2018).pdf
12/12/201811091109 SMC4-MS-107A MS of Structure Excavation from P15-P18.pdf
12/12/201811101110 SMC4-LC-350 Inspection Minutes & Quantity Summary Table of Waste Disposal Implemented by the Subcontractors at Nguyen Khe Disposal fr Jun-Oct2018.pdf
12/13/201811111111 SMC4-LT-18 Additional Submission of Profile of Laboratory LAS-XD 1733 of Tien Thanh JSC..pdf
12/12/201811121112 SMC4-MA-209 Capacity Profile of Supplier JV of New Link-Nhan Luat Corp. for Reinforcing Steel of Hoa Phat Hai Duong JSC.pdf
12/13/201811131113 SMC4-LC-351 Submission of Weekly Report No.30.pdf
12/13/201811141114 SMC4-MA-210 capacity profile of manufacturer & Suppier for Expansion Admixture VT-TN01 Center for Corrosion Prevention & Construction Consultancy of IBST.pdf
12/14/201811151115 SMC4-LC-352 Report on Environment Monitoring in Construction Stage (1st Phase in Dec 2018, Parameter TSP).pdf
12/14/201811161116 SMC4-LC-353 Result of Ultrasonic Test of CIP Concrete Piles at P28.pdf
12/14/201811171117 SMC4-MS-109 MS of Pier Column from P23-P28.pdf
12/15/201811181118 SMC4-LC-355 Acceptance of CIP Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P34R.pdf
12/17/201811191119 SMC4-LC-354 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Subtructure Work for P19.pdf
12/17/201811201120 4810-PMUTL-DA6 Settlement of Some Construction Quality Defects in the Project.pdf
12/17/201811211121-SMC4-MA-211 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column, Pier Head of P18.pdf
12/17/201811221122 SMC4-MA-212 Report on Frequency Test of Reinforcing Steel VGS for CIP Concrete Pile of P16& P17 (2nd).pdf
12/17/201811231123 SMC4-MA-213 Report on Frequency Test of Reinforcing Steel for Super T Girder (2nd) of Team 4 Co.422.pdf
12/18/201811241124 SMC4-MA-214 Report on Frequency Test of Reinforcing Steel for CIP Pile P12 & P13.pdf
12/17/201811251125 SMC4-MA-215 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column, Pier Head P32,P33,P34 & P35 (6th).pdf
12/17/201811261126 SMC4-AD-16 As Built Drawings of CIP Concrete Pile for Pier P19.pdf
12/17/201811271127 SMC4-AD-17 As Built Drawings of CIP Concrete Pile for Pier P34R.pdf
12/18/201811281128 SMC4-LC-356 Design Change Document for Foundation Structure & Elevation of Pile Cap of Piers P44, P59, P60.pdf
12/18/201811291129 SMC4-LC-358 Submission of Weekly Report No.31.pdf
12/18/201811301130 SMC4-LC-357 Reply to the Engineer's Letter Regarding Document of Manpower & Equipment Mobilization of Viet Tiep BP.pdf
12/18/201811311131 SMC4-MA-216 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile P38, P39, P40 (3rd).pdf
12/18/201811321132 SMC4-MA-217 Capacity Profile of Manufacturer & Supplier for Expansion Admixture Denka Power CSA type S & R for Concrete.pdf
12/19/201811331133 SMC4-MS-110 MS of Steel Bridge Fabrication of Thanh Long Group JSC.pdf
12/19/201811341134 SMC4-WD-171 Calculation Sheet & WD of Deck sSab of Steel Bridge( Including Kadawa Certification & A11,02(1)(a) & S11,18 (1)(c) of Japan Bridge Association.pdf
12/19/201811351135 SMC4-WD-170 WD of Substructure - Pile Cap of P15.pdf
12/20/201811361136 SMC4-MA-219 Report on Trial Mix of Concrete Class A,B1,C1,C3,C4,D, E,G,Y for Viet Tiep BP ( used BASF Admixture).pdf
12/20/201811371137 SMC4-LC-316A Changing the Location of PDA Test from Pile No.4 Abutment A1 to No.2 of P23 & No.4 of P60 to No.4 of P42.pdf
12/20/201811381138 SMC4-MA-215A Capacity Profile of Manufacturer Posco for Steel Plate, Shape & Filler Metal for Steel Bridge (2nd).pdf
3/20/201911391139 SMC4-LC-359 Report on the Phenomenon of CIP Concrete Pile D1.2m - Pile 5 of P27.pdf
12/20/201811401140 SMC4-MS-111 Quality Control Quality Assurance Plan and Welding Plan for Steel Bridge Fabrication of Thanh Long Group JSC.pdf
12/21/201811411141 SMC4-LC-360 Changing the Type of Welding Line of Pier Head & Girder of Steel Bridge.pdf
12/22/201811421142 SMC4-MA-220 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile of O38,P39,P40 ( 4th).pdf
12/22/201811431143 SMC4-MA-221 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile of P41,P42,P43 (2nd).pdf
12/22/201811441144 SMC4-LC-361 Document for Mobilization of Subcontractor Thang Long Group JSC for Construction of Steel Bridge.pdf
12/22/201811451145 SMC4-LC-362 Document for Mobilization of Subcontractor Thang Long Builtding & Consulting Experiment JSC for PDA Test.pdf
12/22/201811461146 SMC4-LC-363 Document for Additional Manpower & Equipment Mobilization of Subcontractor Thang Long Building & Consulting Experiment JSC for Ultrasonic Test.pdf
12/22/201811471147 SMC4-LC-364 Notice for the Schedule of Mobilization & Inspection of Steel Material at the Factory of Thang Long.pdf
12/22/201811481148 SMC4-WD-172 WD of Substructure - Pier P18 (2nd).pdf
12/24/201811491149 SMC4-MA-222 Report on Test Result of Compressive Strength for 28 days of Trial Mix Concrete Class A,B1,C1,C3,C4,D,E,G,Y for Viet Tiep Batching Plant.pdf
12/24/201811501150 SMC4-MA-223 Test Result of Water used for Cement Concrete of Viet Tiep Batching Plant.pdf
12/25/201811511151 SMC4-AD-18 As Built Drawings of CIP Concrete Pile for Pier P18.pdf
12/25/201811521152 SMC4-LP-29 To Support the Contractor in Extending the Method of Fencing, Traffic Congtrol at Sections A1-P17 & P18-P22.pdf
12/26/201811531153 SMC4-LC-366 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction Substructure Works for P18.pdf
12/26/201811541154 SMC4-LP-30 To Support the Contractor in Relocating the Drainage Culvert at P26.pdf
12/27/201811551155 SMC4-MS-112 Submission of Traffic Control Plan for Public Road for Construction at P44-P60.pdf
12/26/201811561156 SMC4-LC-367 Reply to the Engineer's Letter on Report on Environmental Monitoring in Construction Stage(1st Phase -Dec2018,Parameter TSP).pdf
12/26/201811571157 SMC4-MA-224 Report on Test of Cement, Coarse Aggregate, Fine Aggregate and admixture of Viet Tiep BP (1st)& Admixture for Cement Concrete at Viet Tiep BP (1st).pdf
12/26/201811581158 SMC4-MA-225 Report on Frequency Test of PC Strand for Super T Girder (9th).pdf
12/26/201811591159 SMC4-MA-226 Report on Frequency Test of PC Strand for Super T Girder (10th).pdf
12/26/201811601160 SMC4-LC-368 Submission of Weekly Report No.32.pdf
12/26/201811611161 SMC4-MA-227 Report on Frequency Test of PC Strand for Super T Girder (11th).pdf
12/27/201811621162 SMC4-MS-113 Method Statement for Pile Cap P17, P18.pdf
12/28/201811631163 SMC4-WD-173 WD for General Arrangement of Traffic Sign for Expressway.pdf
12/28/201811641164 SMC4-MA-228 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile P11, P12, P13, P14 (2nd).pdf
12/28/201811651165 SMC4-MA-229 Report on Frequency Test of Reinforcing Steel for Super T Girder (3rd) of Team 4 ( Co. 422).pdf
12/28/201811661166 SMC4-LC-369 Notice on Carrying Out PDA Test by Thanh Long JSC by Existing Crane At Site.pdf
12/28/201811671167 SMC4-LC-370 Notice on New Year 2019 Holiday Schedule of the Contractor.pdf
12/28/201811681168 SMC4-MA-230 Approval of Report on Frequency Test of Reinforcing Steel CGS for Precast Panel of Super T Girder.pdf
12/28/201811691169 SMC4-MA-231 Approval Manufacturer & Supplier of Coupler D25 & Coupler D32.pdf
12/28/201811701170 SMC4-LC-371 Report on Incident of Installation of Manufactured Reinforcing Steel at P21 & P22.pdf
12/28/201811711171 SMC4-LC-373 Notice on New Year 2019 Holiday Schedule of the Contractor ( on Site).pdf
12/28/201811721172 SMC4-LC-372 Notice of Environmental Monitoring Schedule in January 2019 at Construction Phase.pdf
12/28/201811731173 SMC4-LC-374 Notice for Leave for Our Key Personnel (Project Manager).pdf
12/28/201811741174 SMC4-LT-19 Inspection Minute of Laboratory LAS-XD 1733 of TIEN THANH JSC.pdf
12/29/201811751175 SMC4-LC-378 Notice òn Demobilization of Drilling Machine of Team10 414 Co..pdf
12/29/201811761176 SMC4-LC-376 Slope Protection of Detour Road on the Right Side from P38-P43 (Km1+990-Km2+010).pdf
1/2/201911771177 SMC4-LC-377 Changing Design of Drainage Pipe Culvet D500.pdf
1/2/201911781178 SMC4-LC-379 Report on Environment in Construction Stage (2nd Phase in December 2018, Parameter TSP).pdf
12/29/201811791179 SMC4-LC-380 Position of the Upper Coupler & Upper Rebar B1, B2A of Super T Girder for Crossbeam Construction.pdf
1/2/201911801180 SMC4-AD-19 As Built Drawings of CIP Concrete Pile for P28.pdf
1/2/201911811181 SMC4-AD-20 As Built Drawings of CIP Concrete Pile for P33L.pdf
1/3/201911821182 SMC4-MA-232 Report on Frequency Test of Reinforcing Steel of VGS for Super T Girder (4th) of Team 2 (407).pdf
1/3/201911831183 SMC4-LC-381 Reult of Ultrasonic Test of CIP Piles at P27.pdf
1/3/201911841184 SMC4-WD-174 WD for General Layout Drainage (2nd).pdf
1/3/201911851185 SMC4-WD-175 WD of Superstructure - Steel Bridge - Detail of Segment 7 & 15-Ridig Pier Head.pdf
1/3/201911861186 SMC4-WD-176 WD of Superstructure - General Dimension of Steel Girder.pdf
1/3/201911871187 SMC4-LC-379A Document of Steel Import for Steel Bridge Fabrication of Thanh Long JSC.pdf
1/3/201911881188 SMC4-LC-382 Acceptence of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Subtructure Work for P33L.pdf
1/3/201911891189 SMC4-LC-383 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Constructure Work for P28.pdf
1/2/201911901190 05-BQLDATL-GM Inviatation Letter Date 3.1.19.pdf
1/3/201911911191 SMC4-MA-231A Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile P38,P39 & P40 (5th).pdf
1/4/201911921192 SMC4-WD-177 WD of Substructure pier P17 (2nd).pdf
1/4/201911931193 SMC4-LC-384 Submission of weekly report No.33.pdf
1/10/201911941194 SMC4-MS-114 MS of Gate Arrangment at P18-P19, P21-P22, P32-P33.pdf
1/4/201911951195 SMC4-LC-385 Result of Ultrasonic Test of CIP Concrete Pile at P33R.pdf
1/4/201911961196 SMC4-MA-233 Proposal of Mix Proportion for Trial Mix Class B2 at Viet Tiep & Batching Plant Transmeco.pdf
1/4/201911971197 SMC4-LC-386 Propose to Use the Gate at P18-P19 for Casting Concrete at Piers P18, P19.pdf
1/4/201911981198 SMC4-MA-234 Report on Frequency Test of Reinforcing Steel VGS Steel for Pile Cap, Pier Column, Pier Head P32, P33, P34, P35 (7th).pdf
1/4/201911991199 SMC4-MC-08 Application for Interim Payment Certificate No.06 (Period 01Dec2018 to 31Dec2018).pdf
1/5/201912001200 SMC4-LC-381A Engineer's Confirmation for Safety & Environmental Satisfaction (Dec2018).pdf
1/5/201912011201 SMC4-MA-235 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile Pier P25 & P26 ( 1st).pdf
1/5/201912021202 SMC4-LC-387 Replacement of Utility Engineer for HCRR3 Construction Project-PK1.pdf
1/8/201912031203 SMC4-MA-237 Report on Test Result of Coupler D32 of Vinh Thuc Co.Ltd.pdf
1/8/201912041204 SMC4-MA-238 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile P25 & P26 (2nd).pdf
1/9/201912051205 SMC4-MA-237A Profile of Manufacturer & Supplier for Painting Material for Steel Bridge Hai Phong Paint JSC (2nd).pdf
1/9/201912061206 SMC4-LC-388-Notice of Equipment Demobilization of Team 4 - Co.422.pdf
1/9/201912071207 SMC4-MA-236 Report on Frequency Test of PC Strand for Super T Girder (13th & 14th).pdf
1/10/201912081208 SMC4-LC-389 Submission of Monthly Report No.8.pdf
1/10/201912091209 SMC4-LC-390 Correction Items of the Design Drawing of Steel Pier Head & Girders of Steel Bridge.pdf
1/24/201912101210 SMC4-MS-115 MS of Pier Head from P20-P22.pdf
1/14/201912111211 SMC4-MS-116 Outline for Loading Test of Pier Head's Supporting System at P21.pdf
1/9/201912121212 118-BQLDATL-DA1 Approval for Replacement of Key Personnel ( Quality Control Manager).pdf
1/10/201912131213 SMC4-MA-236A Report on Frequency Test of PC Strand for Super -T Girder (12th).pdf
1/10/201912141214 SMC4-MA-239 Report on Frequency Test on Reinforcing Steel Vietnam Germany Steel for Pile Cap, Pier Column, Pier Head P28(2nd); Pier Column, Pier Head P29 (5th); Pier Head P30 &P31 (5th).pdf
1/10/201912151215 SMC4-RP-34 Report for Loading Test of Pier Head's Supporting System at P31.pdf
1/10/201912161216 SMC4-LC-391 Submission of Weekly Report No.34.pdf
1/10/201912171217 SMC4-MA-240 Report on Test Result of Epoxy Coated PC Strand & Anchorage of Zhemao Science & Technology Co.,Ltd.pdf
2/20/201912181218 SMC4-MS-117 MS of Pier Head from P32-P35.pdf
1/12/201912191219 SMC4-WD-178 WD of Substructure - Pier P23 (2nd).pdf
1/12/201912201220 SMC4-WD-179 WD of Substructure P27 (2nd).pdf
1/12/201912211221 SMC4-MA-242 Report on Frequency Test of Epoxy Coated PC Strand & Anchorage of Zhemao Science & Technology Co.,LTd (1st).pdf
1/12/201912221222 SMC4-MA-243 Report on Test Result of Jack & Synchronous Experiment of Jack, PC Strand, Anchorage for Post- Tensioning Pre Stressed Cantilever Pier Head (1st).pdf
1/14/201912231223 SMC4-MA-241 Report on Frequency Test of Reinforcing Steel for Pile Cap, Pier Column & Pier Head of Pier P23 & P24 (1st).pdf
1/22/201912241224 SMC4-LC-392 Additional Supervision Cost of Engineer's Staff ( Oct2018).pdf
1/14/201912251225 SMC4-MA-244 Report on Frequency Test of PC Strand for Super T Girder (15th).pdf
1/14/201912261226 SMC4-LC-393 Term of Reference for Ultrasonic Test, Tip Contact Checking Test ( Stage 2).pdf
1/14/201912271227 SMC4-MA-245 Report on Frequency Test of Reinforcing Steel Vietnam Germany Steel for CIP Concrete Pile of P14,P15.pdf
1/14/201912281228 SMC4-MA-246 Mix Proportion for Mix Class A ( Ver.2) at Batching Plant Viet Tiep.pdf
1/14/201912291229 SMC4-MA-247 Capacity Profile of Manufacturer & Supplier for Welding Material for Steel Bridge- Huyndai Welding Co.,Ltd (2nd).pdf
1/14/201912301230 SMC4-LC-334 Notice on Tet Holiday Schedule of The Contractor.pdf
1/14/201912311231 SMC4-LC-395 Reply to Engineer's Letter on Disposal Area.pdf
1/14/201912321232 SMC4-LC-396 Report on Environment Monitoring in Construction Stage (erd Phase in Dec2018 & 1st Jan 19, Parameter TSP).pdf
1/15/201912331233 SMC4-AD-21 As Build Drawings of CIP Concrete Pier P33R.pdf
1/21/201912341234 SMC4-MS-118 Calculation of Tendon cable Elongation for Pier Head from P30-P31.pdf
1/15/201912351235 SMC4-MS-119 Outline for loading test of Pier head's Supporting System at P34.pdf
1/15/201912361236 SMC4-LP-0033-Report and proposal for countermeasures for detour road slope protection P38-P40.pdf
1/15/201912371237 SMC4-MA-0248 Report on Frequency test of Reinforcing Steel-VN Germany steel for Pile Cap,Pier column,pier head of Pier P19(4th).pdf
1/15/201912381238 SMC4-251 Report on frequency test of cement and water for Grouting Sonic tube(3rd ).pdf
1/15/201912391239 SMC4-MA-250 Report on Frequency test of Reinforcing steel for Pier Column and Pier head of Pier P36,P37(5th)...Pier P38.pdf
1/15/201912401240 SMC4-MA-249 Report on Frequency test of Reinforcing steel-VN For Pile cap,Pier Column,pier head P32,33,34,35.pdf
1/15/201912411241 SMC4-LC-0397 Proposal for Acceptance of CIP Concrete Pile Foundation Construction stage and transfer to construction of Substructure work for P33R.pdf
2/16/201912421242 SMC4-MA-243A Report on Test Result of Expansion Admixture VT-TN01.pdf
1/16/201912431243 SMC4-LC-398 Submission of Weekly Report No.35.pdf
1/16/201912441244 SMC4-MS-120 Outline for Loading Test of Pier Head Supporting System P37.pdf
1/16/201912451245 SMC4-RP-35 Report for Loading Test of Pier Head's Supporting System P21.pdf
1/16/201912461246 SMC4-RP-36 Topographic Survey Report at section from Km2+225 to Km2+350.pdf
1/16/201912471247 Working Minutes on Hand-over and Take-over of the Site.pdf
1/15/201912481248 183 QD BQLDATL Approval Decision on Design Change document of Drainage System on Bridge at The Piers.pdf
1/16/201912491249 191 BQLDATL-DHDA1 Road Marking for Traffic Control on Pham Van Dong Road.pdf
1/16/201912501250 Invitation for Site Visit Date 18.1.19.pdf
1/18/201912511251 SMC4-MS-121 Supplement Drawing the Divided Layer of Backfilling Foundation from P23-P28.pdf
1/19/201912521252 SMC4-MA-252 Report on Frequency Test of Reinforcing Steel of Vietnam Germany Steel for Super T Girder (5th) of Team 2 (407Co.).pdf
1/23/201912531253 SMC4-MA-253 Report on Frequency Test of Cement, Coarse Aggregates, Fine Aggregates, Water for Cement Concrete at ASEAN Batching ( 14th to 16th).pdf
1/23/201912541254 SMC4-MA-254 Report on Frequency Test of Cement, Coarse Aggregate, Fine Aggregate & Admixture for Cement Concrete at Transmeco Batching Plant (2nd & 4th).pdf
1/22/201912551255 SMC4-MA-255 Report on Trial Mix of Concrete Class A (Cement 525kg) for Viet Tiep Batching Plant (used BASF Admixture).pdf
1/19/201912561256 SMC4-WD-180 WD for General Arrangement Location of Traffic Signs Expressway Section Km0+700-Km2+812.5 (2nd).pdf
1/19/201912571257 SMC4-WD-181 WD of Structure Excavation for Section P11-P17, P38-P43.pdf
1/19/201912581258 SMC4-WD-182 WD of CIP Pile for P46 (2nd).pdf
1/19/201912591259 SMC4-WD-183 WD of CIP Concrete Pile P47 (2nd).pdf
1/19/201912601260 SMC4-WD-184 WD of CIP Concrete Pile for P48 (2nd).pdf
1/22/201912611261 SMC4-LC-399 Report on Incidents of SuperT Girder Using Concrete Privided by Viet Tiep Batching Plant.pdf
1/19/201912621262 SMC4-MA-256 TOR of Concrete Quality Control.pdf
1/21/201912631263 SMC4-MS-122 MS for Lower Part of Pier Head from P23-P28.pdf
1/21/201912641264 SMC4-MS-123 Supplement Method Drawing the Divided Layer of Backfilling Foundation from P15-P18.pdf
1/21/201912651265 SMC4-MS-124 Supplement Method Drawing the Lower Part of Pier Head P19.pdf
1/21/201912661266 SMC4-LC-400 Changing Diameter of Shear Stud of Girder of Steel Bridge.pdf
1/21/201912671267 SMC4-MS-125 Outline for Loading Test of Pier Head's Supporting System at P22.pdf
1/21/201912681268 SMC4-WD-185 WD of Adjustment for Exterior Girder, Spans 10-16, 24-28 & 32.pdf
1/21/201912691269 SMC4-WD-186 WD of Substructure - Pier P16 (2nd ).pdf
1/22/201912701270 SMC4-MA-257 Using Mix Proportion Class A ( Cement 525 kg) at Viet Tiep Batching Plant for Construction of Super T Girder.pdf
1/22/201912711271 SMC4-LC-401 Result of Ultrasonic Test of CIP Concrete Piles at P24.pdf
1/23/201912721272 SMC4-MS-126 Document of Protection & Relocation Existing Utilities at P26.pdf
1/23/201912731273 SMC4-RP-37 Report for Pile Dynamic Analysis Test of CIP Concrete Pilling, Pile C4-P42.pdf
1/22/201912741274 SMC4-MS-127 MS for Transportation of Super T Girder.pdf
1/23/201912751275 SMC4-MA-258 Report on Frequency Test of Reinforcing Steel VGS Steel for Pile Cap, Pier Column, Pier Head P32, P33, P34, P35 (9th).pdf
1/23/201912761276 SMC4-LC-402 Report on Environment Monitoring in Construction Stage (Dec 18 base on EMP).pdf
1/23/201912771277 SMC4-LC-403 Result of Ultrasonic Test of CIP Concrete Piles at P32C.pdf
1/23/201912781278 SMC4-LC-404 Result of Tip Contact Checking Test of CIPConcrete Pile C5-P23.pdf
1/23/201912791279 SMC4-RP-38 Report on Loading Test of Pier Head's Supporting System at P34.pdf
1/23/201912801280 SMC4-MA-259 Report on Frequencry Test of Reinforcing Steel VGS for Pile Cap, Pier Column, Pier Head P20, P22 (3rd).pdf
1/23/201912811281 SMC4-LC-405 The Contractors Schedule Plan Until 31st Mar 2019.pdf
1/23/201912821282 SMC4-MS-128 MS of Pier Column from P17 to P18.pdf
3/5/201912831283 SMC4-MS-129 MS of Pier Head from P36-P37.pdf
1/24/201912841284 SMC4-AD-22 AsBuilt Drawings of CIP Concrete Pile for P24.pdf
1/24/201912851285-NST-1112 Proposal for Applying the Primer Coating Layer.pdf
1/25/201912861286 SMC4-LC-408 Breakdown of Cost for Changing Foundation Structure from Rotation Steel Pile to CIP Concrete Pile P9-P15, P45-P58.pdf
1/25/201912871287 SMC4-LC-406 Report on Environment Monitoring in Construction Stage (2nd Phase in Jan 2019, Parameter TSP).pdf
1/25/201912881288 SMC4-LC-407 Submission of Weekly Report No. 36.pdf
1/25/201912891289 SMC4-LP-34 VAT Invoices for Interim Payment Certificate No.04 of PK1.pdf
1/25/201912901290 SMC4-LP-35 VAT Invoices for Interim Payment Certificate No.05 off PK1.pdf
1/25/201912911291 SMC4-LP-36 VAT Invoices for Interim Payment Certificate No.06 of PK1.pdf
1/28/201912921292 SMC4-LC-409 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P24.pdf
1/28/201912931293 SMC4-LC-410 Engineer's Confirmation for Safety & Environment Satisfaction ( January-2018).pdf
1/29/201912941294 SMC4-MC-09 Interim Payment Certificate No.07 ( Period 01st Jan2019 to 25th Jan2019).pdf
1/28/201912951295 SMC4-MA-260 Report on Test of Cement, Coarse Aggregate, Fine & Water for Cement Conscrete at Transmeco BP ( 5th to 7th).pdf
1/28/201912961296 SMC4-MA-261 Report on Result of Jack & Experiment of Jack, PC Strand, Anchorage for Post- Tensioning Pre Stressed Cantilever Pier Head (2nd sub).pdf
1/28/201912971297 SMC4-LC-411 Report on Inspection of Current Pavement Structure at Section P12=P43 & Proposed Backfill Structure at P12-P43.pdf
1/28/201912981298 SMC4-LC-412 Report on Environment Monitoring in Construction Stage- 3rd Phase of Dec2018 & 1st Phase of Jan2019 (2nd submission).pdf
1/28/201912991299 SMC4-LC-413 Notice of Environnmental Monitoring Schedule in Feb 2019 at Construction Phase.pdf
1/29/201913001300 SMC4-RP-39 Incident Report on Construction of CIP Concrete Pilling- Pile No.9 of Pier 25.pdf
1/29/201913011301 SMC4-MS-130 Traffic Control Plan for Public Road for Construction at Sectiont P46-P60.pdf
1/29/201913021302 SMC4-MS-131 Calculation of Tendon Cable Elongation for Pier Head from P21-P22.pdf
1/29/201913031303 SMC4-MA-262 Report on Frequency Test of Epoxy Coated PC Strand of Zhemao Science & Technology Co. LTD Used for Pier Head (2nd).pdf
1/29/201913041304 SMC4-MA-263 Report on Test Result of No Shrink, Flowable Gout NUCEMIX G50, NUCTECH-CT JSC.pdf
1/29/201913051305 SMC4-MA-264 Report on Frequency Test of PC Strand for Super T Girder (16th).pdf
1/28/201913061306 93-GEN-0689-1.01 Lunar Tet Holiday Notice.pdf
1/30/201913071307 SMC4-MA-265 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile pier P11, P12, P13 (3rd).pdf
1/30/201913081308 SMC4-RP-40 Report for Pile Nynamic Analysis Test of CIP Concrete Pilling. Pile C2-P23.pdf
1/30/201913091309 SMC4-LC-415 Submission of Weekly Report No.37.pdf
1/30/201913101310 SMC4-LC-414 Submission of Inspection Minutes & Quantity Table of Waste Disposal Implemented by the Subcontractors at Nguyen Khe from Nov till Dec 2018.pdf
1/31/201913111311 SMC4-LC-416 Report on Environment Monitoring in Construction Stage (3rd Phase in Jan 2019. Parameter TSP).pdf
1/30/201913121312 400 PMUTL-DHDA1 Assurance of safety and Environmental hygiene During Lunar Tet of the Year of Pig 2019.pdf
1/31/201913131313 SMC4-WD-187 WD of Backfill for Section P19-P31.pdf
1/31/201913141314 SMC4-WD-188 WD for Basement for Traffic Sign Board at Pier P34.pdf
1/31/201913151315 SMC4-MA-267 TOR for Testing of Elastomeric Bearing (2nd).pdf
2/27/201913161316 SMC4-MS-132 Resubmission of Method Statement of Steel Bridge Fabrication of Thanh Long Group JSC (2nd).pdf
1/31/201913171317 SMC4-MA-266 Report on Frequency Test of Reinforcing Steel for Pile Cap, Pier Column and Pier Head of Pier P23 and P24 (2nd).pdf
1/31/201913181318 SMC4-LC-417 Report of Cracks on Super T Girders Found in November.pdf
1/31/201913191319 SMC4-LC-189 Calculation Sheet for Camber of Steel Girder (3rd).pdf
1/31/201913201320 SMC4-LC-118 Notification of Working Plan for Tet Holiday 2019 ( 1Feb2019-10Feb2019).pdf
1/31/201913211321 426 PMUTL-DHDA1 Traffic Control and Environmental Hygiene in the Hanoi City.pdf
2/12/201913221322 433 PMUTL-DHDA1 Design Modification of Relocation of Abutment A1.pdf
2/12/201913231323 55 CQLXD-DB1 Report on Result of Site inspection.pdf
2/12/201913241324 SMC4-MA-268 Improvement of Steel Storage and Arrangement on Site.pdf
2/12/201913251325 905 TB-SGTVT Notice on Alternative for traffic diversion and Traffic control on Pham Van Dong.pdf
2/12/201913261326 SMC4-LC-419 Notification of the Replacement of the Contractor's Deputy Project Manager.pdf
2/13/201913271327 SMC4-LC-421 Notice for leave for our key Personnel(Project Manager and Structure.pdf
4/26/201913281328 SMC4-LC-420 Proposal for Changing Shape of Parapet's Start Rebar.pdf
3/1/201913291329 SMC4-MS-133 Quality control-Assurance plan and Welding plan for steel Bridge Fabrication at Factory of Thanh Long Group JSC(2nd).pdf
2/14/201913301330 23-TTHNDTNN-GD3 Notice on Plan for Site Inspection to the HCRR3 Construction Project MD-STL Section.pdf
2/13/201913311331 126 GM-BGTVT Invitattion Letter Date 13.2.19.pdf
2/14/201913321332 1014-BGTVT-CQLXD Strengthening Quality Control, Progress & Labor Safety in HCRR3 Construction Project MD-STL Section.pdf
2/19/201913331333 SMC4-LC-422 Additional Supervision Cost of Engineer's Staff ( Nov 2018).pdf
2/14/201913341334 SMC4-WD-190 WD for Basement for Traffic Sign Board at P34 & P37.pdf
2/15/201913351335 Minutes of Discussion on Addendum No.02 PK1.pdf
2/15/201913361336 SMC4-RP-41 Report for Loading Test of Pier Head's Supporting System at P22.pdf
2/15/201913371337 SMC4-RP-42 Report for Loading Test of Pier Head's Supporting System at P37.pdf
2/15/201913381338 SMC4-LC-424 Submission of Monthly Report No.9.pdf
2/16/201913391339 SMC4-MS-134 Outline for Loading Test of Pier Head's Supporting System at P30.pdf
2/16/201913401340 SMC4-LC-423 Report on Inspection of Current Pavement Structure at Section P12-P43 & Backfill Structure at Section P12-P43.pdf
2/16/201913411341 SMC4-MS-136 Outline for Loading Test of Pier Head's Supporting System at P19.pdf
2/21/201913421342 SMC4-MS-135 Document of Protection & Relocation Existing Utilities P26 (2nd).pdf
2/18/201913431343 SMC4-LC-425 Breakdown of Cost for Changing Foundation & Pile Cap Elevation P44, P59, P60.pdf
2/19/201913441344 1279-BGTVT-CQLXD Modification of Some Contracts for PK1 & PK2.pdf
2/19/201913451345 SMC4-LC-426 Submission of Weekly Report No.38.pdf
2/20/201913461346 SMC4-MS-138 MS of Gate Arrangement at P19-P20.pdf
2/20/201913471347 SMC4-MS-137 MS of Traffic Control for Public Road at P38-P60- Vol VII-1 Arranging Traffic Control at P46-P48 &P57-P60.pdf
2/20/201913481348 SMC4-MS-139 MS of Temporary Facilities Arrangement on Site from P46-P48.pdf
2/20/201913491349 SMC4-LC-427 Result of Ultrasonic Test of CIP Piles P27.pdf
2/20/201913501350 SMC4-LC-428 Result of Ultrasonic Test of CIP Concrete Piles P23.pdf
2/22/201913511351 SMC4-MA-269 Capacity Profile of Manufacturer & Supplier for Connectors for Steel Bridge-Samjin Fastners - Duc Son (2nd submission).pdf
2/22/201913521352 SMC4-MA-273 Report on Trial Mix of Concrete Class B2 of Transmeco BP.pdf
2/22/201913531353 SMC4-MA-274 Report on Trial Mix of Concrete Class B2 of Viet Tiep.pdf
3/1/201913541354 SMC4-MS-140 The Pile Head Treatment Method for CIP Concrete Pilling- Pile No C5 of P27.pdf
2/22/201913551355 SMC4-WD-191 WD of Backfill for Section P12-P18 & P33-P40.pdf
2/22/201913561356 SMC4-WD-192 WD for Basement for Traffic Sign Board at P37 (2nd).pdf
2/22/201913571357 SMC4-WD-193 Calculation Sheet & WD of Deck Slab of Steel Bridge Including KAWADA Certification & JBA (2nd).pdf
2/22/201913581358 SMC4-MS-142 MS for Transportation of Super T Girder.pdf
2/22/201913591359 SMC4-AD-23 As Built Drawings of CIP Concrete Pile for P23.pdf
2/25/201913601360 1182-SGTVT-QLKCHTGT Suspension of Works in Service of Diplomatic Delegations in Feb2019 in Hanoi.pdf
2/22/201913611361 549-PMUTL-DA1 Approval of TOR & Cost Estimates for Traffic Control ( Stage 1).pdf
2/22/201913621362 SMC4-MA-275 Capacity Profile of Minh Tam BP (2nd).pdf
2/22/201913631363 SMC4-WD-195 WD of Adjustment for Exterior Girder Span 36 (P35-P36).pdf
2/22/201913641364 SMC4-LC-429 Submission of Weekly Report No.40.pdf
2/22/201913651365 SMC4-RP-43 Topographic Survey Report at Section From Km2+640-Km2+812.50.pdf
2/22/201913661366 SMC4-WD-194 WD of CIP Concrete Pile for P57.pdf
3/6/201913671367 SMC4-LC-430 Cost Estimate for Test on Concrete Pile- Ultrasonic Test, Tip Contact Checking Test on CIP Concrete Piles (Stage 2).pdf
2/23/201913681368 SMC4-WD-196 WD of Adjustment for Exterior Girder Span 38 (P37-P38).pdf
2/23/201913691369 SMC4-WD-197 WD for Basement for Traffic Sign Board at Pier P35.pdf
2/23/201913701370 SMC4-WD-198 WD of CIP Concrete Pile for P59 (2nd).pdf
2/23/201913711371 SMC4-WD-199 WD of CIP Concrete Pile for Pier P60 (2nd).pdf
2/23/201913721372 SMC4-LC-431 Acceptance of Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P23.pdf
2/25/201913731373 SMC4-MA-270 Capacity Profile of Manufacturer & Supplier of Drainage Pipe Material.pdf
3/18/201913741374 SMC4-MA-271 Capacity Profile of Manufacturer & Supplier of Membrane on Pier Head for Friction Cut Material-SBS.pdf
2/25/201913751375 SMC4-MA-272 Capacity Profile of Manufacturer& Supplier of Membrane on Pier Head for Friction Cut Material -LEMAX 4mm PE-APP.pdf
3/14/201913761376 SMC4-MS-143 MS of Pier Head from P19 and P23-P26.pdf
2/25/201913771377 SMC4-MS-144 Outline for Loading Test of Pier Head's Supporting System at P33.pdf
2/25/201913781378 SMC4-MS-145 Supplement & Updating MS Plan Drawing of CIP Concrete Pilling from P46-P48 & P57-P60.pdf
2/25/201913791379 SMC4-LC-432 Additional Supervision Cost of Engineer's Staff ( Dec2019).pdf
2/25/201913801380 580 PMUTL-DHDA1 Suspension of Works for Services of Diplomatic Delegation in February 2019 in Ha Noi.pdf
3/4/201913811381 SMC4-WD-200 WD of CIP Concrete Pile for P58 (2nd).pdf
2/26/201913821382 SMC4-MS-146 MS of Temporary Facilities Arrangement on Site from Pier P57-P60.pdf
2/26/201913831383 SMC4-LC-433 Notice of Environmental Monitoring Schedule in Mar2019 at Construction Phase.pdf
2/26/201913841384 SMC4-MA-276 Capacity Profile of Supplier & Manufacturer of Shape Steel for Steel Bridge Hanwa Co.Ltd-Nippon Steel & Sumitomo Metal Corp.pdf
2/26/201913851385 SMC4-MA-277 Report on Frequency Test of Reinforcing Steel for Super T Girder (3rd) of Team 1.pdf
2/26/201913861386 SMC4-MA-278 Report on FrequencyTest of Reinforcing Steel VGS for Pile Cap, Pier Column, Pier Head of P19 (5th).pdf
2/27/201913871387 SMC4-MA-279 Primer Coating of Paining Material for Steel Bridge of Manufacturer & Supplier Hai Phong Paint JSC.pdf
2/27/201913881388 SMC4-MA-280 Capacity Profile of Manufacturer & Supplier Viet Thang LTD Co for Stainless Steel 3mm of Super Structure.pdf
2/27/201913891389 SMC4-LC-434 Reply to the Engineer's Letter Regarding Document for Manpower & Equipment Mobilization of Thanh Long Gr JSC.pdf
3/1/201913901390 SMC4-LC-435 Submission of Weekly Report No.41.pdf
3/1/201913911391 634-PMUTL-DHDA1 Approval of TOR & Cost Estimate of Environmental Monitoring.pdf
3/1/201913921392 SMC4-LC-436 Report on Environment Monitoring in Construction Stage (1st Phase in Feb 2019, Parameter TSP).pdf
3/1/201913931393 SMC4-MA-281 Report on Frequency Test of Reinforcing Steel for Super T Girder (4th) of Team 4(Co 422).pdf
3/1/201913941394 SMC4-WD-201 WD of Structure Excavation for Section P11-P17, P38-P43 (2nd).pdf
3/2/201913951395 SMC4-LC-437 Result of Ultrasonic Test of CIP Concrete Piles at P17.pdf
3/2/201913961396 SMC4-MA-282 Capacity Profile of Manufacturer for Steel Plate for Grading & Stainless Steel 3mm -412 JSC.pdf
3/2/201913971397 SMC4-MA-283 Report on Test Result of Coupler D25 of Vinh Thuc Co..pdf
3/2/201913981398 SMC4-MA-284 Report on Frequency Test of Reinforcing Steel VGS for Piel Cap, Pier Column of P17.pdf
3/2/201913991399 SMC4-LC-438 Notice for leave for key personnel (Quality Control Manager).pdf
3/2/201914001400 SMC4-LC-439 Notice of possibility of the prolongation of Project Completion Period.pdf
3/2/201914011401 SMC4-MS-147 Method Statement of Strucure Excavation from P38-P40.pdf
3/2/201914021402 SMC4-MS-148 Outline for Loading Test of Pier Head's Supporting System at P20.pdf
3/14/201914031403 SMC4-MS-149 MS of Structure Excavation from P41-P42.pdf
3/2/201914041404 SMC4-MA-285 Report on Frequency Test of PC Strand for Super T Girder (17th).pdf
3/4/201914051405 SMC4-WD-202 WD of Superstructure -Steel Bridge- Detail of Segment 7 & 15 - Ridig Pier Head (2nd).pdf
3/4/201914061406 SMC4-WD-203 WD General View of Main Bridge & Ramp HQV-B (6th).pdf
3/4/201914071407 689-GM-BQLDATL Invitation Monthly Meeting.pdf
3/4/201914081408 SMC4-MA-286 Report on Frequency Test of Epoxy Coated PC Strand & Anchorage(2nd) of Zhemao for Used for Pier Head.pdf
3/4/201914091409 SMC4-AD-24 Asbuilt Drawings of CIP Concrete Pile for Pier P17.pdf
3/6/201914101410 SMC4-LC-441 Notice on Mobilization of Team 5.pdf
3/6/201914111411-SMC4-MS-150 Calculation of Tendon Cable Elongation for Pier Head from P37.pdf
3/7/201914121412 SMC4-AD-25 As Built Drawings of CIP Concrete Pile for Pier P27.pdf
3/7/201914131413 SMC4-MA-287 Report on Test Result of Axiliary Steel Material of Super T Girder of Vinh Thuc Co.Ltd.pdf
3/7/201914141414 SMC4-LC-442 Replacing Some Girders On Span 31 of the Same Type during Launching.pdf
3/7/201914151415 SMC4-WD-204 WD of Backfill Structure at P21, P22, P30, P31.pdf
3/8/201914161416 SMC4-MA-286A Capacity Prifile of Manufacturer and Supplier for HPDE Conduit Santos JSC.pdf
3/8/201914171417 SMC4-LC-443 Report on Environment Monitoring in Consruction Stage (2nd Phase in Feb 2019, Parameter TSP).pdf
3/8/201914181418 SMC4-LC-444 Notice of Environmental Monitoring Schedule in Mar 2019 at Construction Phase (2nd).pdf
3/8/201914191419 SMC4-RP-44 Pile Head Treatment Report for CIP Concrete Pile No.05 of P27.pdf
3/8/201914201420 SMC4-WD-205 WD of Substructure - Pile Cap of Pier P40 (2nd).pdf
3/8/201914211421 SMC4-WD-206 WD of Substructure - Pile Cap of Pier P41.pdf
3/8/201914221422 SMC4-WD-207 WD of Substructure - Pile Cap of Pier P42.pdf
3/8/201914231423 SMC4-WD-208 WD of Substructure - Pile Cap of Pier P38.pdf
3/8/201914241424 SMC4-WD-209 WD of Substructure - Pile Cap of Pier P39.pdf
3/12/201914251425 SMC4-LC-445 Mobilization Document for Manpower & Equipment of BOT Vinh City Bypass Branch for Substructure Work.pdf
3/12/201914261426 SMC4-LC-447 Proposal for 2 Crane Mobilization Documents for Superstructure Work at the Area P28-P31 under Scope Co.414.pdf
3/8/201914271427 SMC4-LC-446 Notice of Equipment Demobilization - Bored Pile Drilling Machine at P38-P40 of 423.pdf
3/8/201914281428 SMC4-RP-45 Report on Loading Test of Pier Head's Supporting System at P19.pdf
3/12/201914291429 SMC4-MA-288 Capacity Profile Manufacturer & Supplier for Bolts for Steel Bridge Oriental Metal - Duc Son Construction Material Co.,LTD.pdf
3/8/201914301430 SMC4-LC-444A-Result of Ultrasonic Test of CIP Concrete Piles at P42C.pdf
3/12/201914311431 SMC4-LC-444B Result of Ultrasonic Test of CIP Concrete Piles at P40.pdf
3/12/201914321432 SMC4-MA-444C Result of Ultrasonic Test of CIP Concrete Piles at P41C.pdf
3/8/201914331433 SMC4-MA-444D Result of Ultrasonic Test of CIP Concrete Pile at P41L.pdf
3/8/201914341434 SMC4-MA-444E Result of Ultrasonic Test of CIP Concrete Piles at P42L.pdf
3/20/201914351435-SMC4-LT-20-Update and extend document of LAS-XD668.pdf
3/12/201914361436-SMC4 -LC-0448 Variation Oder No.VO-HRR3-PK1-002.pdf
3/12/201914371437-SMC4-LC-450 Proposal for mobilization document of Co.422.pdf
3/12/201914381438 SMC4-MA-289 Report on test result of coating paint Galbon.pdf
3/12/201914391439 SMC4-449 Engineer's Confirmation for Safety & Environment Satisfaction (Jan 26 to Feb 28,2019).pdf
3/12/201914401440 SMC4-MA-290 Report on Frequency Test of Reinforcing Steel for Pile Cap, Pier Column of P27.pdf
3/29/201914411441 SMC4-MS-151 MS for Erection of Super T Girder S22(P21-P22) & S31(P30-P31).pdf
3/12/201914421442-SMC4-WD-0210 Proposal for WD of substructure - pier P46.pdf
3/12/201914431443 SMC4-AD-26 As Built Drawings of CIP Concete Pile for Pier P35R.pdf
3/13/201914441444 SMC4-LC-451 Submission of Monthly Report No.10.pdf
3/13/201914451445 SMC4-MS-152 MS of Structure Excavation from P11-P14.pdf
3/12/201914461446 SMC4-LC-452 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Subtructure Work for P35R.pdf
3/13/201914471447 SMC4-MS-153 MS of Traffic Control for Public Road at P38-P60- Vol VII.2 Arranging Traffic Control at P46-P60 Stage 1.pdf
3/13/201914481448 SMC4-MA-291Capacity Profile of Manufacturer & Supplier for Steel Plate for Grading & Stainless Steel 3mm- Co.412 (2nd).pdf
3/13/201914491449 SMC4-LC-453 Result of Ultrasonic Test ofCIP Concrete Piles at P12.pdf
3/13/201914501450 SMC4-LC-454 Result of Ultrasonic Test of CIP Concrete Pile at P13.pdf
3/13/201914511451 SMC4-LC-455 Result of Tip Contact Checking Test of CIP Concrete Piles C6-P12.pdf
3/13/201914521452 SMC4-LC-456 Result of Tip Contact Checking Test of CIP Conrete Piles C6-P41.pdf
3/12/201914531453 Addendum No.2 PK1.pdf
3/13/201914541454-MS-155 Report on Result of Pile Head Remedy of CIP Concrete Pile C5-P27.pdf
3/13/201914551455 SMC4 - MC -10 Interim Payment Certificate No.08 (Period 26 Jan 2019, 28 Feb 2019 ).pdf
3/13/201914561456 SMC4-MS-154 MS of Pile Cap P41-P42.pdf
3/13/201914571457 SMC4-WD-211 WD of Backfill at Pier P18-P20.pdf
3/13/201914581458 SMC4-LC-458 Report on Environment Monitoring in Construction Stage (3rd Phase in Feb. 2019, Parameter TSP).pdf
3/13/201914591459 SMC4-MA-292 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column of P17 (2nd).pdf
3/13/201914601460 SMC4-LC-459 Notice of Equipment Demobilization- Bored Pile Drilling Machine Soilmec SR-60 at P11-P13 of Co.422.pdf
3/13/201914611461 SMC4-LC-460 Equipment Mobilization Document of IRE VN for Road Reinstatement Work.pdf
3/14/201914621462 SMC4-MA-293 Report on Frequency Test of Reinforcing Steel for Pile Cap, Pier Column & Pier Head of P23,P24(3rd) &P25,P26 (1st).pdf
3/14/201914631463 SMC4-MA-294 Result of Ultrasonic Test of CIP Concrete Piles at P16.pdf
3/14/201914641464 4715-TB-BQLDATL Notice on Conclusions Given by PMUTL in the Meeting to Review the Implementation of PK1,PK2.pdf
3/14/201914651465 823-BALDATL-DHDA1 Invitation Letter to pay a site Inspection of Girder Transpotation Routs.pdf
3/16/201914661466 SMC4-LC-156 Submission of Weekly Report No.42.pdf
3/16/201914671467 SMC4-LC-157 Submission of Weekly Report No.43.pdf
3/16/201914681468 SMC4-WD-212 WD of Deck Slab & Link Slab from Span P21-P31.pdf
3/16/201914691469 SMC4-AD-27 AD of CIP Concrete Pile for P35L.pdf
3/16/201914701470 SMC4-MA-295 Capacity Profile of Supplier & Manufacturer of Concrete Painting Material -Hiep An LTD.pdf
3/16/201914711471 SMC4-MA-296 Report on Frequency Test of Reinforcing Steel for Pile Cap, Pier Column & Pier Head of P38 (2nd), P39 P40(1st).pdf
3/16/201914721472 SMC4-LP-37 Report on the Land Obstruction at Sections P38-P39, P44-P45 & P49-P55.pdf
3/22/201914731473 SMC4-LC-460A Result of Ultrasonic Test of CIP Concrete Piles at P25.pdf
3/22/201914741474 SMC4-LC-460B Result of Ultrasonic Test of CIP Concrete Piles at P43C.pdf
3/19/201914751475 SMC4-RP-46 Report on Loading Test of Pier Head's Supporting System at P33.pdf
3/18/201914761476 SMC4-MS-158 MS of Pile Cap from P14-P16.pdf
3/18/201914771477 SMC4-LC-461 Adjusting Top Elevation of Bearing Pad in Accordance with Actual Camber of Super T Girders 38m & 37.3m.pdf
3/18/201914781478 SMC4-LC-462 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Subtructure Work for P35L.pdf
3/19/201914791479 SMC4-LC-463 Document for Mobilization of Subconstractor Multinational Transport JSC for Transportation & Erection Work of Super T Girders.pdf
3/19/201914801480 SMC4-MS-159 Method Statement of Pile Cap P38-P40.pdf
3/19/201914811481 SMC4-MA-298 Report on Frequency Test of Cement, Coarse Aggregate for Class A, Fine Aggregate for Cement Concrete at Viet Tiep BP (2nd to 4th).pdf
3/27/201914821482 SMC4-WD-213 WD of General Dimension of Steel Girder (2nd).pdf
3/19/201914831483 SMC4-MA-299 Grading Steel Plate & Stainless Steel 3mm Manufactured of KITCON Truong Thanh Co.Ltd & Supplied by 412 (3rd).pdf
3/19/201914841484 SMC4-LC-464 Acceptance of CIP Concrete Pile Foundation Construction Stage & Tranfer to Construction of Substructure Work for P40.pdf
3/21/201914861486 SMC4-WD-214 WD of Backfill for Section P11-P17, P23-P29, P33-P40.pdf
3/21/201914871487 SMC4-LC-465 Variation Order No. VO-HRR3-PK1-003 - Environmental Monitoring.pdf
3/19/201914881488 SMC4-MS-161 MS for Confirmation Quality of Concrete of CIP Concrete Pilling - C6P25.pdf
3/19/201914891489 SMC4-AD-28 As Built Drawings of CIP Concrete Pile for Pier P40.pdf
3/19/201914901490 SMC4-MA-232A Report on Test Result of Posco Steel Plate for Steel Bridge.pdf
3/19/201914911491 SMC4-MS-162 Adjusted MS ofTraffic Control for Public Road at Section P46-P60 (phase 1).pdf
3/20/201914921492 SMC4-LC-467 Notice of Delayed Instruction Regard WD of Section from A1-P10.pdf
3/20/201914931493 SMC4-LC-466 Top Elevation of Bearing Pad in Accordance with Actual Camber of SPT Girder at Span S34.pdf
3/20/201914941494 SMC4-WD-215 WD for Basement for Traffic Sign Board at P16.pdf
3/20/201914951495 SMC4-WD-216 WD for Basement for Traffic Sign Board at P26.pdf
3/20/201914961496 SMC4-MS-163 Supplement of Method Drawing of the Pier Column at P27.pdf
3/20/201914971497 SMC4-LT-21 Capacity Profile of PHATECO JSC for Quality Control of Steel Structure.pdf
4/5/201914981498 SMC4-MS-164 MS of Temporary Facilities Arrangement on Site from P49-P56.pdf
3/21/201914991499 SMC4-MS-165 MS for Transportation the Test Model of Super T Girder.pdf
3/21/201915001500 SMC4-MA-300 Report on Test Result of Elastomeric Bearing of Kawakin Co.Ltd & supplied by THQ Global JSC.pdf
3/21/201915011501 SMC4-MA-301 Drawings & Calculation Sheet of Pot Bearing.pdf
3/21/201915021502 SMC4-LC-468 Report on Environment Monitoring in Construction Stage (1st & 2nd Phase of Mar2019, Parameter TSP).pdf
3/21/201915031503 SMC4-MS-166 Calculation of Tendon Cable Elongation for Pier Head P19.pdf
3/21/201915041504 SMC4-MA-301A Capacity Profile of Manufacturer & Supplier for Bolts for Steel Bridge-Oriental & Duc Son Co.Ltd (2nd).pdf
3/22/201915051505 SMC4-LC-469 Report on Obstructions & Recommendations for the Construction Area P38-P43.pdf
3/22/201915061506 898-PMUTL-DA1 Approval of Variation Order No.VO-HRR3-PK1-002 Traffic Control for Public Roads (Stage 1).pdf
3/22/201915071507 SMC4-LC-464A Notice for Leave of Key Personnel (Quality Control Manager).pdf
3/22/201915081508 SMC4-AD-29 Asbuilt Drawing of CIP Concrete Pile for P16.pdf
3/22/201915091509 SMC4-LC-471 Acceptance of PileFfoundation Stage & Transfer to Substructure Work P16.pdf
3/22/201915101510 SMC4-LC-470 Submission of Weekly Report No.44.pdf
3/22/201915111511 SMC4-MA-302 Test Result of Jack & Experiment of Jack, PC Strand, Anchorage for Post-Tesioning Pre Stressed Cantilever Pier Head (3rd).pdf
3/22/201915121512 SMC4-MA-303 Report Frequency Test of PC Strand Type Guizhou for Super T Girder (19th).pdf
3/22/201915131513 SMC4-MA-304 Report on Frequency Test of PC Strand Type Dong - il for Super T Girder (18th).pdf
3/25/201915141514 SMC4-MA-308 Report on Frequency Test of Reinforcing Steel for Pile Cap, Pier Column, Pier Head of P36(6th),P38(3rd), P39 P40(2nd).pdf
4/8/201915151515 SMC4-MA-307-Report on Frequency Test of Elastomeric Bearing of Manufactured by Kawakin CT VN Ltd, Supplied by THQ Global JSC.pdf
3/25/201915161516 SMC4-MA-306 Report on Frequency Test of PC Strand Type Guizhou for Super T Girder (20th).pdf
3/25/201915171517 SMC4-MA-305Capacity Profile of Manufacturer & Supplierfor Stud Connectors for Steel Bridge- Samjin Fastners-Duc Son Ltd (3rd).pdf
3/25/201915181518 SMC4-WD-217 WD of Adjustment for Exterior Girder Span 33(P32-P33).pdf
3/25/201915191519 SMC4-WD-218 WD of Diaphragm from Span 33 to 37.pdf
3/25/201915201520 SMC4-WD-219 WD of Backfill for Sections P32, P41-P43, P46-P60.pdf
3/25/201915211521 SMC4-WD-220 WD of Structure Excavation for P46-P60.pdf
3/25/201915221522 SMC4-MS-167 MS of Adjusted Traffic Control for Public Road at Section P3-P17.pdf
3/25/201915231523 SMC4-LC-474 Propose to Apply the Primer Coating Paint GALBON SP.pdf
3/25/201915241524 SMC4-LC-473 Result of Ultrasonic Test of CIP Concrete Piles at P11.pdf
3/25/201915251525 SMC4-RP-47 Topographic Survey Report at Section From Km2+350 to Km2+640.pdf
3/25/201915261526 SMC4-LC-472 To Support the Contractor in Extending & Adjusting the Validity of the Method of Fencing, Traffic Control for Construction Project.pdf
3/25/201915271527 970 BQLDATL-DHDA1 Invitation Letter date 26.3.19.pdf
3/26/201915281528 SMC4-MA-310 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column of P16.pdf
3/26/201915291529 SMC4-MA-309 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap,Pier Column, Pier Head of P32, P33,P34,P35(10th) & P41,P42,P43(1st).pdf
3/26/201915301530 SMC4-LC-475 Additional Document for Manpower & Equipment Mobilization for Backfilling Work & Driving Sheet Pile Under Scope of 422 Co..pdf
3/28/201915311531 SMC4-MS-168 Outline for Loading Test of Pier Head's Supporting System at P28, P29.pdf
3/28/201915321532 SMC4-MS-169 Supplement of Method Drawing of Pier Head P28.pdf
3/28/201915331533 SMC4-MS-170 Calculation of Tendon Cable Elongation for Pier Head at P20.pdf
3/28/201915341534 SMC4-LC-476 Adjusting Top Elevation of Bearing Pad Girder in Accordance with Actual Camber of Super T Girders 34.3m.pdf
3/28/201915351535 SMC4-AD-30 Asbuilt Drawings of Pre-Tensioning Pre Stressed Super T Girder Span 22(P21-P22).pdf
3/28/201915361536 SMC4-MS-171 MS of Pre-Assembly for Steel Bridge at Thanh Long Factory.pdf
3/28/201915371537 SMC4-MS-172 MS for Erection of Super T Girder.pdf
3/28/201915381538 SMC4-AD-31 Asbuilt Drawings of Pre-Tensioning Pre Stressed Super T Girder Span 31(P30-P31).pdf
3/28/201915391539 SMC4-WD-221 WD of CIP Concrete Pile for P53 (2nd).pdf
3/28/201915401540 SMC4-WD-222 WD of CIP Concrete Pile for P54 (2nd).pdf
3/28/201915411541 SMC4-WD-223 WD of CIP Concrete Pile for P55 (2nd).pdf
3/28/201915421542 SMC4-WD-224 WD of Column & Pier Head of P41.pdf
3/28/201915431543 SMC4-WD-225 WD of Column & Pier Head of P42.pdf
3/28/201915441544 SMC4-LC-477 Report on Incident of Transformer Station No.2 at P39 on the Right Side.pdf
3/28/201915451545 SMC4-LC-478 Submission of Weekly Report No.45.pdf
3/28/201915461546 SMC4-LC-479 Replacement of Quality Control Manager - Mr. Nguyen Viet Hung.pdf
3/28/201915471547 SMC4-LC-480 Acceptance of Sub-Structure Stage & Transfer to Superstructure Work for P21, P22.pdf
3/29/201915481548 SMC4-MA-301B Report on Frequency Test of Reinforcing Steel VGS for PreCast Panel of Super T Girder (2nd).pdf
3/29/201915491549 SMC4-LC-481 Comparison Table Structure Excavation Quantity Between Contract Drawing & Design Following Actual Existing Ground.pdf
3/29/201915501550 SMC4-LC-482 Expected Plan of Transport & Eriction of the First Super T Girder Span S22.pdf
4/1/201915511551 SMC4-AD-32 AsBuilt Drawings of CIP Concrete Piles for P41C.pdf
4/1/201915521552 SMC4-LC-484 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P41C.pdf
4/1/201915531553 SMC4-RP-48 Report on Survey of Existing Culvert Pipe D1250 of Ministry of Police Public.pdf
4/1/201915541554 SMC4-WD-226 WD of Substructure P15.pdf
4/1/201915551555 SMC4-WD-227 WD of Backfill for Sections P32, P41-P43, P46-P60 (2nd).pdf
4/1/201915561556 SMC4-MA-312 Supplier Co.412 JSC for Steel Plate for Grading of Vinh Thuc Co. LTD.pdf
4/1/201915571557 SMC4-MA-313 TOR for Testing of Pot Bearing.pdf
4/1/201915581558 SMC4-LC-483 Result of Ultrasonic Test of CIP Concrete Piles at P14.pdf
4/1/201915591559 SMC4-LC-486 Result of Ultrasonic Test of CIP Concrete Piles at P15.pdf
4/1/201915601560 SMC4-LC-485 Result of Tip Contact Checking Test of CIP Concrete Pile C4-P15.pdf
4/1/201915611561 SMC4-LC-489 Notice of Environmental Monitoring Schedule in April 2019 at Construction Phase.pdf
4/1/201915621562 SMC4-LC-487 Result of Tip Contact Checking Test of CIP Concrete Pile -Pile No.C6P25.pdf
4/4/201915631563 SMC4-LC-488 Report of Result for Confirmation Quality of Concrete of CIP Concrete Pile- Pile No.C6P25.pdf
4/1/201915641564 SMC4-MS-176 Reconnect Culvert Pipe D1250 of Ministry of Police Public Plan (1).pdf
4/1/201915651565 SMC4-MS-175 Method Statement for Remedial Measure of Pile Toe Defect C5P43.pdf
4/1/201915661566 SMC4-MS-174 Outline for Loading Test of Pier Head's Supporting System at P36 (1).pdf
4/1/201915671567 SMC4-MS-173 Calculation of Tendon Cable Elongation for Pier Head at P33.pdf
4/1/201915681568 SMC4-LC-490 Report on Environment Monitoring in Construction Stage (Mar 2019 , Base on EMP).pdf
4/1/201915691569 SMC4-LC-491 Report on Environment Monitoring in Construction Stage (3rd Phase in Mar 2019, Parameter TSP).pdf
4/1/201915701570 SMC4-WD-228 WD of Diaphragm from Span 38-43.pdf
4/1/201915711571 SMC4-WD-229 WD of CIP Concrete Pile for P52 (2nd).pdf
4/1/201915721572 SMC4-WD-231 WD of Painting of Exterior Super T Girder from Span 10-16, 20-61.pdf
4/1/201915731573 SMC4-WD-230 WD of CIP Concrete Pile for P56 (2nd).pdf
4/1/201915741574 SMC4-WD-232 WD of Detail of Segments 6,8,14,16 of Steel Girder.pdf
4/2/201915751575 SMC4-WD-233 WD of Substructure - Column & Pier Head P40 (2nd).pdf
4/2/201915761576 SMC4-WD-234 WD of CIP Concrete Pile for P49 (2nd).pdf
4/2/201915771577 SMC4-WD-235 WD of CIP Concrete Pile for P50 (2nd).pdf
4/2/201915781578 SMC4-WD-236 WD of CIP Concrete Pile for P51 (2nd).pdf
4/2/201915791579 SMC4-LC-493 Report on Some Defects on Concrete Surface at Pier Head P19 & Countermeasures.pdf
4/2/201915801580 SMC4-LC-492 Contractor's Plan for Trial Transportation of Super T Girder Model & Next Related Work Items.pdf
4/2/201915811581 315 19-JICA-YL Annual Disbursement Forecast for Japanese Fiscal Year (JFY) 2019.pdf
4/2/201915821582 SMC4-LT-22 Capacity Profile of Laboratory ITST for Quality Control of Steel Structures (Additional submission).pdf
4/2/201915831583 SMC4-MA-311 Report on Test Result of Jack & Synchronous Experiment of Jack, PC Strand, Anchorage for Post Tensioning Pre Stressed Cantilever Pier Head (4th).pdf
4/4/201915841584 SMC4-MA-314 Report on Frequency Test of Cement, Coarse Aggregate, Fine Aggregate & Admixture for Cement Concrete at Transmeco BP (8th to 15th).pdf
4/3/201915851585 SMC4-MA-315 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column, Pier Head of P41, P42, P43 (2nd).pdf
4/3/201915861586 SMC4-LC-494 Submission of Report on Actual Condition of Cracks on Pier Head P19-P20.pdf
4/3/201915871587 784 QD-TCDBVN Permit for Operation of Oversize Vehicle used for Transportation of Oversize cargo on the Road.pdf
4/3/201915881588 759 QD-TCDBVN Approval decision on Establishment of Supervision Team for Trial transportion of Super T girder.pdf
4/4/201915891589 SMC4-LP-38 Request for Reply the Letter Regarding Exchange Rate VAT Portion.pdf
4/5/201915901590 SMC4-RP-47A Report for Loading Test of Pier Head's Supporting System at P20.pdf
4/5/201915911591 SMC4-RP-49 Report for Loading Test of Pier Head's Supporting system at P36.pdf
4/5/201915921592 SMC4-RP-50 Report for Loading Test of Pier Head's Supporting System at P29.pdf
4/5/201915931593 SMC4-MA-314A Report on Frequency Test of Reinforcing Steel VGS for CIP Concrete Pile P57, P58, P59, P60 (1st).pdf
4/5/201915941594 SMC4-MA-316 Report on Frequency Test of Epoxy Coated PC Trand (4th) of Zhemao LTD for Pier Head.pdf
4/5/201915951595 SMC4-MS-177 Outline for Loading Test ofPier Head's Supporting System from P23-P26.pdf
4/5/201915961596 SMC4-MS-178 MS of Pier Column from P38-P40.pdf
4/5/201915971597 SMC4-MS-179 MS of Pier Column from P14-P16.pdf
4/5/201915981598 SMC4-LC-495 Report on Actual Condition of Cracks on Pier Head P33.pdf
4/5/201915991599 SMC4-LC-496 Additional Documents for 2 Cranes Mobilization for Substructure Work at P28-P31 under Scope of Co.414 (2nd).pdf
4/5/201916001600 SMC4-LC-497 Mobilization Document for Additional Manpower & Equipment for Substructure & Superstructure Work under Co.407.pdf
4/5/201916011601 SMC4-LC-498 Response to Engineer's Letter Regarding WD for General Layout of Drainage System.pdf
4/5/201916021602 SMC4-LP-39 Report on Land Obstructions Relating to Eriction of Super T Girders at the P28-P32 Section Right Side.pdf
4/6/201916031603 SMC4--LC-499 Engineer's Confirmation for Safety & Environment Satisfaction ( March- 2019).pdf
4/8/201916041604 SMC4-LT-22 Capacity Profile of Laboratory ITST for Quanlity Control of Steel Structures ( Additional Submission).pdf
4/8/201916051605 SMC4-WD-237 WD of Column & Pier Head of P38.pdf
4/8/201916061606 SMC4-WD-238 WD of Column & Pier Head of P39.pdf
4/8/201916071607 SMC4-LC-493A Withdrawal of the Letter SMC4-LT-002119 dated 18Mar2019 & SMC4-LT-002219 dated dated 24Mar2019.pdf
4/8/201916081608 SMC4-MA-317 Notice of Not Using Minh Tam Batching Plant for Project.pdf
4/8/201916091609 SMC4-LC-500 Submission of Weekly Report No.46.pdf
4/8/201916101610 SMC4-MA-318 Notice of Using Viet Tiep Batching Plant for Main site.pdf
4/8/201916111611 SMC4-LC-501 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P25.pdf
4/9/201916121612 SMC4-MS-181-Proposal for MS of pier column P41-P42.pdf
4/9/201916131613 SMC4-MS-180 MS of Temporary Facilities Arrangement on Site from P7-P17.pdf
4/9/201916141614 SMC4-LC-502 Report on Environment Monitoring in 4th Phase of 2018 & 1st Phase of 2019 of Thanh Long Steel Structure Plant.pdf
4/9/201916151615 SMC4-LC-503 Submission of Contractor's Countermeasures to Improve the Construction of Pier head P29.pdf
4/9/201916161616 1091-PMUTL-DHDA1 Approval of Variation Order No. VO-HRR3-PK1-003 Environmental Monitoring.pdf
7/3/201916171617 1163-PMUTL-DHDA1Result of Vision Inspection by Package 11- Quality Inspection 2019-04-09 14.13.50.pdf
4/9/201916181618 SMC4-RP-52 Report on Transportation of the Test Model of Super T Girder.pdf
4/9/201916191619 SMC4-MS-182 Calculation of Tendon Cable Elongation For Pier Head from P28-P29.pdf
4/9/201916201620 SMC4-MS-183 MS Plan Drawing of CIP Concrete Pile from P46-P56.pdf
4/9/201916211621 SMC4-AD-33 Asbuilt Drawing of CIP Concrete Pile of P15.pdf
4/11/201916221622 SMC4-WD-239 WD of Detail of Segments from 6-13 of Steel Girder.pdf
4/24/201916231623 SMC4-LC-504 Mobilization Document of Additional Equipment & Manpower for Steel Bridge Subscontractor Thanh Long Group JSC (3rd).pdf
4/11/201916241624 SMC4-LC-505 Capacity Profile of VSBCO Vietnam for Verification of Super T Girder.pdf
4/11/201916251625 SMC4-MS-184 Outline for Checking Quality of Civil Structure.pdf
4/11/201916261626 SMC4-AD-34 Asbuilt Drawings of Substructure - Pile Cap, Pier Colum, Pier Head of P21.pdf
4/11/201916271627 SMC4-AD-35 As Built Drawings of Substructure - Pile Cap, Pier Column, Pier Head of P22.pdf
4/11/201916281628 SMC4-LP-40 Suggestion for the Re-Check Condition of Crack Super T Girder.pdf
4/11/201916291629 PMUTL Meeting Invitation-Treatment of the Blocked Drainage Pipe at the Office of the Ministry of Public Security -10Apr2019.pdf
4/12/201916301630 SMC4-AD-36 As Built Drawings of Substructure- Pile Cap, Pier Column & Pier Head P30.pdf
4/12/201916311631 SMC4-AD-37 As Built Drawings of Substructure-Pile Cap, Pier Column & Pier Head of P31.pdf
4/12/201916321632 SMC4-LC-507 Submission of Schedule for Steel Bridge until 30 June 2019.pdf
4/12/201916331633 SMC4-LC-508 Submission of Monthly Report No.11.pdf
4/12/201916341634 SMC4-RP-53 Report on Loading Test of Pier Head's Supporting System at P28.pdf
4/12/201916351635 SMC4-LC-506 Notice of Contractor's Plan for Trial Transportation & Erection of Super T Girder.pdf
4/12/201916361636 SMC4-MA-319 Report on Frequency Test of Posco Steel Plate for Steel Bridge (1st).pdf
4/11/201916371637 SMC4-MC-11 Application for Interim Payment Certificate No.09 ( Period 01Mar2019 to 31Mar2019).pdf
4/12/201916381638 SMC4-AD-32A As Built Drawings of CIP Concrete Pile for P25.pdf
4/12/201916391639 SMC4-MA-320 Report on Frequency Test of Reinforcing Steel for Pile Cap, Pier Column & Pier Head of P23, P24 (4th) (1).pdf
5/7/201916401640 SMC4-MA-321 Characteristic Strength for Concrete Class A of Asean BP - Report 1 & 2.pdf
4/12/201916411641 SMC4-LC-509- 2nd Mobilization Document of Additional Manpower of BOT Vinh City Bypass Branch for Substructure Work.pdf
4/25/201916421642 SMC4-LC-510 Report on Concrete Surface's Defects of Pier Column P40 & Countermeasures.pdf
4/13/201916431643 SMC4-LC-511 Detailed Particular for Claim 1-Request for Extention of Time for Completion Due to Suspension of the Works(DPRK-USD Summit fr 24Feb-1Mar2019).pdf
4/24/201916441644 SMC4-MS-185 MS of Defects Treatment & Finishing Concrete Surface of Super T Girder.pdf
4/17/201916451645 SMC4-LC-512 Result fo Ultrasonic Test of CIP Concrete Pile at P26.pdf
4/17/201916461646 SMC4-LT-23 Update of Capacity Profile of Laboratory ITST.pdf
4/17/201916471647 SMC4-LC-514 Submission of Weekly Report No.47.pdf
4/17/201916481648 SMC4-MA-322 Report on Frequency Test of Reinforcing Steel for Pile Cap, Pier Column & Pier Head of P25, P26, P27 (2nd).pdf
5/7/201916491649 SMC4-MA-324 Characteristic Strength for Concrete Class C of Transmeco BP- Report 1, 2.pdf
5/7/201916501650 SMC4-MA-325 Characteristic Strength for Concrete Class A of Viet Tiep BP - Report 1.pdf
4/17/201916511651 SMC4-MA-326 Report on Frequency Test of Reinforcing Steel VGS for Pier Cap,Pier Column, Pier Head P32-P35 (11th) & P41-P43 (3rd).pdf
4/17/201916521652 SMC4-MA-327 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column & Pier Head of P15.pdf
4/17/201916531653 SMC4-MA-328 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile at P55, P56.pdf
4/16/201916541654 SMC4-LC-513 Claim for an Extension of Time or an Additional Payment for the Suspension of Works.pdf
4/17/201916551655 SMC4-WD-240 WD of Super T Girder Span 42 (P41-P42).pdf
4/17/201916561656 SMC4-MA-329 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile P46, P47.pdf
4/17/201916571657 SMC4-MA-330 Report on Frequency Test of Reinforcing Steel VGS for Pier Head P28(3rd) & Diaphragm of Pier P28-P31.pdf
4/17/201916581658 SMC4-LC-515 Report on Environment Monitoring in Construction Stage (1st Phase in Apr 2019, Parameter TSP).pdf
5/13/201916591659 SMC4-LC-516 Replacement of Foundation-Pilling Engineer- Hồ Đức Phúc.pdf
4/18/201916601660 SMC4-LC-517 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P15.pdf
4/19/201916611661 SMC4-LC-518 Additional Supervision Cost of Engineer'Staff (Jan, Feb 2019).pdf
4/19/201916621662 SMC4-LC-519 Report on Condition of Concrete Surface on Pier Head P29.pdf
4/19/201916631663 SMC4-WD-241 WD of Substructure - Pier P59.pdf
4/19/201916641664 SMC4-RP-54 Report on Trial Transportation & Erection of Super T Girder.pdf
4/19/201916651665 SMC4-MS-186 MS for Lower Part of Pier Head from P14-P16.pdf
5/7/201916661666 SMC4-MA-331 Update for TOR for Quality Control of Concrete.pdf
4/20/201916671667 SMC4-LC-520 Financial Charges Upon Unpaid Sums.pdf
4/20/201916681668 SMC4-MA-332 Test Result of Painting Material & Frequency Test of Primer Coating Paint for Steel Bridge- Hai Phong Paint JSC & Primer Coat Paint at the Factory.pdf
4/20/201916691669 SMC4-MS-187 Supplement Method Drawing for Erection of Super T Girder at Span S22( P21-P22) & Permit from Directorate of VN.pdf
4/22/201916701670 SMC4-WD-242 WD of Adjustment for Exterior Girder Span 41 (P40-P41).pdf
4/22/201916711671 SMC4-WD-243 WD of Super T Girder Span 43( P42-P43).pdf
4/22/201916721672 SMC4-MA-333 Report on Frequency Test of Reinforcing Steel-VGS for Pile Cap,Pier Column, Pier Head P32-P35 (12th) & P41-P43 (4th).pdf
4/22/201916731673 SMC4-MA-335 Report on Test Result of Stainless Steel - Viet Thang Co.LTD.pdf
4/22/201916741674 SMC4-MA-334 Report on Frequency Test of sReinforcing Steel for Pile Cap, Pier Column & Pier Head of P36 (7th).pdf
4/22/201916751675 1279 BQLDATL-DA1 Design change of pavement structure for reinstatement of pavement at pier locations.pdf
4/22/201916761676 SMC4-RP-42A Report for Loading Test of Pier Head's Supporting System P30.pdf
4/24/201916771677 SMC4-RP-55 Report to Monitoring Type 1, 2 Crack of SuperT Girder.pdf
4/25/201916781678 SMC4-RP-56 Report on Checking the Periodic Benchmark System (2nd).pdf
4/24/201916791679 SMC4-MA-336 Report on Frequency Test of Reinforcing Steel of VGS for Super T Girder (6th) of Team 2 (Co.407).pdf
4/24/201916801680 SMC4-WD-244 WD for Basement for Traffic Sign Board at P39.pdf
4/24/201916811681 SMC4-WD-245 WD for Basement for Traffic Sign Board at P42.pdf
4/24/201916821682 SMC4-WD-246 WD for Basement for Traffic Sign Board at P41.pdf
4/24/201916831683 SMC4-WD-247 WD of Substructure - P60.pdf
4/24/201916841684 SMC4-MA-338 Capacity Profile of Manufacturer & Supplier of Non Shrinkage Grout Victa VG60- Center of TDBM under IBST.pdf
4/24/201916851685 SMC4-MA-337 Update & Supplement of Capacity Profile of ASEAN BP.pdf
4/24/201916861686 SMC4-LC-521 Reply to the Engineer's Letter on Notice of Claim due to Delayed Approval Instruction for WD of A1-P10 Section.pdf
4/25/201916871687 SMC4-LC-514A Extension of Registration for 2 Trailers & Insurance for crane 160T to Serve Transportation & Eriction Work of Super T Girders.pdf
4/24/201916881688 SMC4-LC-522 Submission of Weekly Report No.48.pdf
5/21/201916891689 SMC4-LC-523 Additional Mobilization of Tractors, Crane to Serve Transport & Eriction Work of Super T Girder (2nd).pdf
4/24/201916901690 SMC4-RP-57 Report on Loading Test of Pier Head's Supporting System at P23.pdf
4/24/201916911691 SMC4-MS-188 Supplement the Method Drawing of Pier Head at P23.pdf
4/24/201916921692 SMC4-MS-189 Traffic Control Plan for Public Road for Construction of Steel Bridge at P16-P19.pdf
4/24/201916931693 SMC4-LT-24 Update & Supplement the Document of Personnel, Equipment of Lab XD 668.pdf
4/24/201916941694 SMC4-AD-33A As Built Drawing of Substructure - Backfill P21, P22, P30 & P31.pdf
4/24/201916951695 SMC4-AD-38-As Built Drawing of Pre Tensioning Pre Tressed Super T Girder Span 20 (P19-P20).pdf
4/24/201916961696 SMC4-AD-39 As Built Drawing of CIP Concrete Pile D1.2m of P26.pdf
4/24/201916971697 SMC4-WD-248 WD of Painting of Exterior Super T Girder from Span 10-16 & 20-38 (2nd).pdf
4/24/201916981698 SMC4-WD-249-WD General View of Main Bridge & HQV-B Ramp (7th).pdf
4/25/201916991699 SMC4-AD-40 As Built Drawings of Substructure- Pile Cap, Pier Column & Pier Head of P19.pdf
4/25/201917001700 SMC4-AD-41 As Built Drawings of CIP Concrete Piliing D1.2m of P42L.pdf
4/25/201917011701 SMC4-LC-524 Notice on Contractor's Working Schedule during Nation Reunification & International Labor Day on 30 Apr & 1 May 2019.pdf
4/25/201917021702 SMC4-WD-250 WD of Substructure- P56.pdf
4/25/201917031703 SMC4-WD-251 WD of Substructure- P55.pdf
4/25/201917041704 SMC4-WD-252 WD of Substructure- P47.pdf
4/26/201917051705 SMC4-LC-525 Method to Improve the Construction of Pier Column.pdf
4/26/201917061706 SMC4-LC-526 Notice of Equipment Demobilization - Excavator Hitachi ZX under Scope of 422 Co..pdf
4/27/201917071707 SMC4-LC-527 Proposal for top Elevation of Bearing Pad in Accordance with Actual Camber of SPT Girder at Span S29, S30.pdf
4/27/201917081708 SMC4-MA-339 Capacity Profile of Manufacturer Waterproofing Material HASEAL 5 - Ha An JSC.pdf
4/27/201917091709 SMC4-LC-529 Notice of Environmental Monitoring Schedule in May 2019 at Construction Phase.pdf
4/27/201917101710 SMC4-LC-528 Report on Environment Monitoring (2nd Phase in Apr 2019).pdf
4/27/201917111711 SMC4-LP-43 Resolving Some Obstacles of Traffic Signal & Camera Systems.pdf
4/27/201917121712 SMC4-LC-530 Submission of Weekly Report No.49.pdf
4/27/201917131713 SMC4-MA-340 Report on Frequency Test of Reinforcing Steel for SuperT Girder (5th, 6th) of Team 4 (Co.422).pdf
4/27/201917141714 SMC4-MS-191 Method Statement of Pier Column From P41-P42 (Rev.02).pdf
4/27/201917151715 SMC4-MS-190 Method Statement for Lower Part of Pier Head from P38-P40.pdf
5/27/201917161716 SMC4-WD-253 Calculation Sheet & Working Drawing of Deck Slab of Steel Bridge (Including Kawada Certification & S11.02 (1)(a) & S11.08 (1)(c) of JBA (2nd ).pdf
5/3/201917171717 SMC4-AD-42 AD of Substructure - Pile Cap, Pier Column & Pier Head of Pier P20.pdf
5/3/201917181718 SMC4-LC-531 Substructure Acceptance & Transfer to Superstructure P30.pdf
5/3/201917191719 SMC4-LC-533 Pile Foundation Acceptance & Transfer to Substructure P26.pdf
5/3/201917201720 SMC4-LC-532 Substructure Acceptance & Transfer to Superstructure P31.pdf
5/3/201917211721 SMC4-LC-534 Acceptance of Pile Foundation Stage & Transfer to Substructure P42L.pdf
5/4/201917221722 SMC4-LC-535 Report on Status of Connection Drainage System between 2 Project.pdf
5/4/201917231723 SMC4-LC-514B Report on Concrete Surface's Defect of Pier Column P16.pdf
5/3/201917241724 1432-TB-BQLDA Notice on Conclusion Given in the Meeting on Determination of Exchange Rate & Time for Insuance of VAT Invoice for HCRR3 Construction Project.pdf
5/6/201917251725 SMC4-LC-536 Confirmation of Safety & Environment Satisfaction (1-30 Apr 2019).pdf
5/6/201917261726 SMC4-MA-341 Report on Frequency Test of Reinforcing Steel for Pile Cap, Pier Column & Pier Head of P25, P26 (3rd).pdf
5/6/201917271727 SMC4-MA-342 Characteristic Strength of Concrete Class G of Asean BP- Report No.1.pdf
5/6/201917281728 SMC4-MS-193 MS for Treatment Form Work at the End of Super T Girder.pdf
5/6/201917291729 SMC4-WD- 254 WD for Basement for Traffic Sign Board at P16 (2nd).pdf
5/6/201917301730 SMC4-WD-255 WD of Super T Girder Span 39 (P38-P39).pdf
5/6/201917311731 SMC4-LC-537 Submission of Weekly Report No.50.pdf
5/6/201917321732 SMC4-MS-192 Supplement of Method Drawing for Construction of Pier Head at P27.pdf
5/6/201917331733 SMC4-MS-194 Outline for Loading Test of Pier Head Supporting System at P27.pdf
5/7/201917341734 SMC4-WD-257 WD of Superstructure - Steel bridge - Detail of Segment 7& 15 - Rigid Pier Head (1st Revision).pdf
5/22/201917351735 SMC4-MA-343 Characteristic Strength for Concrete Class Y of ASEAN BP - No.4.pdf
5/7/201917361736 SMC4-LC-538 Report on Environment Monitoring in Construction Stage (3rd Phase in Apr 2019, Parameters TSP).pdf
5/7/201917371737 SMC4-WD-256 Drawing & Calculation Sheet of Pot Bearing (2nd).pdf
5/7/201917381738 SMC4-AD-43 As Built Drawing of CIP Concrete Piling D1.2m of P41L.pdf
5/7/201917391739 SMC4-MS-195 Remedial Method for Concrete Surface's Defects for Pier Column P16.pdf
5/7/201917401740 SMC4-AD-44 As Built Drawings of Substructure- Pile Cap, Pier Column & Pier Head of P34.pdf
5/7/201917411741 SMC4-AD-45 As Built Drawings of Substructure- Pile Cap, Pier Column & Pier Head of P33.pdf
5/7/201917421742 SMC4-WD-258 WD of Detail of Segmetns 17-21 of Steel Girder.pdf
5/9/201917431743 SMC4-AD-46 As Built Drawings of Pre Tesioning Pre Stressed SuperT Girder Span 21.pdf
5/24/201917441744 SMC4-MS-196 MS for Transportation of Steel Girder.pdf
5/9/201917451745 SMC4-MA-344 Test Result of Membrane on Pier Head for Friction Cut Material -Lemax 4mm PE-APP.pdf
5/10/201917461746 SMC4-LC-539 Reply to the Comment on 2nd Mobilization Document for Additional Manpower of BOT Vinh City bypass Branch for Substructure Works.pdf
5/10/201917471747 SMC4-LC-540 Proposal for Transferring the Drilling Crane Kobeco 7055 Working ả P38-P40 (423 Co.) to P52-P56 (422 Co) equipment.pdf
5/10/201917481748 SMC4-WD-259 WD of Detail of Segment 6,8,14,16 of Steel Girder (2nd).pdf
5/10/201917491749 SMC4-WD-260 WD of Substructure P57.pdf
5/10/201917501750 SMC4-WD-261 WD of Substructure P58.pdf
5/10/201917511751 SMC4-MS-197 MS of Remove Scaffolding System & Formwork System of Pier Head.pdf
5/10/201917521752 SMC4-MS-198 Remedial Method for Concrete Surface's Defects for Pier Column P40.pdf
5/10/201917531753 SMC4-MA-340A Report on Frequency Test of Posco Steel Plate for Steel Bridge (2nd).pdf
6/12/201917541754 SMC4-MS-199 Countermeasure & Repairing Method for Crack on Pier Head.pdf
5/10/201917551755 SMC4-MA-344A TOR for Frequency Test of Materials for Steel Bridge.pdf
5/10/201917561756 SMC4-MA-346 Characteristic Strength of Concrete Class Y of Transmeco BP - Report No.1 & 2.pdf
5/10/201917571757 SMC4-MA-347 Report on Test Result of Paint Material for Steel Bridge of Hai Phong Paint JSC(2nd).pdf
5/10/201917581758 SMC4-LC-541 Submission of Weekly Report No.51.pdf
5/13/201917591759 SMC4-WD-262 WD of Detail of Segments 9 to 13 of Steel Girder (2nd).pdf
5/14/201917601760 SMC4-LC-542 Report on Environment Monitoring in Construction Stage (1st Phase in May 2019, Parameters TSP).pdf
5/30/201917611761 SMC4-MA-347A Capacity Profile of Manufacturer & Suppler for Bolts for Boilts for Steel Bridge-Oriens Metal Co.Ltd & DongAh Co.LTD- Tan Co JSC.pdf
5/14/201917621762 SMC4-MA-347B Report on Frequency Test of Reinforcing Steel for Super T Girder (4th) of 414 Team 1.pdf
5/14/201917631763 SMC4-MA-347C Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column, Pier Head of P41-P43 (5th).pdf
5/14/201917641764 SMC4-MA-348 Characteristic Strength for Concrete Class C of ASEAN BP- Report No.1 from 30Sep-11Dec2018.pdf
5/14/201917651765 SMC4-MA-349 Characteristic Strength for Concrete Class A of Viet Tiep BP - Report No.2 form 25Feb -02Apr2019.pdf
5/14/201917661766 SMC4-MA-350 Supplier 412 JSC for Steel Plate for Grading & Stainless Steel of Viet Thang Co. LTD.pdf
5/14/201917671767 SMC4-MS-200 Supplement Method Drawing for Erection of Super T Girder at S31(P30-P31).pdf
5/14/201917681768 SMC4-MS-201 Supplement Drawing for Method Statement of Pier Column from P14-P15.pdf
5/14/201917691769 SMC4-MS-202 Supplement Drawing for Method Statement of Pier Column P38-P39.pdf
5/14/201917701770 SMC4-MA-348A Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column of P15, P16 (2nd).pdf
5/14/201917711771 SMC4-MA-348B Report on Frequency Test of Reinforcing Steel VGS for CIP Concrete Pile of P57-P60 (2nd).pdf
5/14/201917721772 SMC4-LC-543 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work P41L.pdf
5/16/201917731773 1560-PMUTL-DA1 Reinstatement of Drainage System for Office of Ministry of Public Security.pdf
5/15/201917741774 1491-BQLDATL-DA1 Approval of Nominated Subcontractor for Protection & Relocation of Existing Utilities of PK1.pdf
5/16/201917751775 SMC4-LC-544 Monthly Report No.12.pdf
5/15/201917761776 SMC4-AD-47 As Built Drawings of Substructure- Pile Cap, Pier Column & Pier Head of P29.pdf
5/16/201917771777 SMC4-MC-12 Interim Payment Certificate No. 10 ( Period 1Apr-30Apr2019).pdf
5/17/201917781778 SMC4-LC-545 Result of Ultrasonic Test of CIP Concrete Piles at P38.pdf
5/17/201917791779 SMC4-LC-541A Updated Quality Control Plan.pdf
5/17/201917801780 SMC4-MS-203 MS of Traffic Control for Public Road at Section P38-P43-Volumn VI.4 Arranging TC after Extending Site Fence at P38-P41 Right Side.pdf
5/17/201917811781 SMC4-LC-546 Construction Work of the Subcontractor - Co.423.pdf
5/17/201917821782 SMC4-LC-547 Report on Defect Treatment (Crack Type 1& 2) & Finishing Surface Concrete of Super TGirder.pdf
5/17/201917831783 SMC4-LC-548 Request for Equipment Remobilization- Excavator Hitachi ZX of Co.422 to P52-P56 for Bored Pile Drilling Work & Demobilization of Excavator Kolbeco SK200-8.pdf
5/17/201917841784 SMC4-LC-549 Mobilization Documents for Manpower & Machinery for Backlling Work under Scope of 422.pdf
5/17/201917851785 SMC4-WD-263 WD of Deck Slab & Link Slab Span S21, 22& 30, 31 (2nd).pdf
5/17/201917861786 SMC4-MS-204 Method Drawing for Erection of Super T Girder at Span S20 (P19-P20) & S21( P20-P21).pdf
5/17/201917871787 SMC4-AD-48 Asbuilt Drawings of Pre Tensioning Pre Stressed Super T Girder Span 30( P29-P30).pdf
5/18/201917881788 1622-BQLDATL-DA1 Approval for Replacement of Key Personnel ( Quality Control Manager).pdf
5/18/201917891789 SMC4-MA-351 Report on Fequency Test of Cement, Coarse Aggregate, for Class A, fine Aggregate, Admixture & Water for Cement Concrete at Viet Tiep BP (5th - 6th).pdf
5/18/201917901790 SMC4-RP-58 Supplement of Permit from Directorate for Road of VietNam.pdf
5/18/201917911791 SMC4-MC-13 Resubmit for Interim Payment Certificate No.10 ( Period 1Apr-30Apr2019).pdf
5/18/201917921792 SMC4-LC-550 Report of Surface Repairing Work on Pier Head P20.pdf
5/18/201917931793 SMC4-LC-551 Report on Reparation Work for Pier Column P40 Concrete Surface.pdf
5/18/201917941794 SMC4-LC-552 Report of Reparation Work for Pier Column P16 Concrete Surface.pdf
5/20/201917951795 SMC4-LC-553 Acceptance of Sub Structure Construction Stage & Tranfer to Construction of Superstructure Work for P20.pdf
5/20/201917961796 SMC4-MA-352 Report on Frequency Test of Reinforcing Steel VGS for CIP Concrete Pile of Pile P57-P60 (3rd).pdf
5/20/201917971797 SMC4-MA-353 Report on Frequency Test of Reinforcing Steel for Pile Cap, Pier Column & Pier Head of P38(4th)-P40 (3rd).pdf
5/20/201917981798 SMC4-MS-205 MS of Fence Arrangement on Site from P38-P42.pdf
5/24/201917991799 SMC4-MS-206 Traffic Control Plan for Public Road Construction of Steel Bridge at P16-P19 (2nd).pdf
5/22/201918001800 1628-PMUTL-DHDA1 Review & Check Quality of Super T Girders at PK1 Fabrication Yard-Remedy of Defects during Construction of Super T Girder.pdf
5/20/201918011801 1634 PMUTL-DHDA1 Design Modification of Pavement Structure for Backfill at Locations of Piers-Abutments.pdf
5/31/201918021802 SMC4-SC-20 Capacity Profile of Subcontractor PHATECO JSC.pdf
5/21/201918031803 SMC4-LC-554 Weekly Report No.52.pdf
5/21/201918041804 SMC4-MS-207 MS for Remedy Defects of Super T Girder.pdf
5/21/201918051805 SMC4-RP-59 Report on Loading Test of Pier Head's Supporting System at P27.pdf
5/22/201918061806 SMC4-MS-208 MS for Confirmation of Concrete Quality for CIP Concrete Piling -Pile C2P38.pdf
5/23/201918071807 SMC4-LC-555 Notice of Working Content on Dust Matter at Thanh Long Steel Bridge Fabrication Factory.pdf
5/23/201918081808 SMC4-LC-556 Withdrawal of Letter SMC4- LC-505.19 &SMC4- MS-0184.19 dated 10Apr2019.pdf
5/23/201918091809 SMC4-MA-354 Capacity Profile of Manufacturer & Supplier for Stud Shear Connector of Steel Bridge- Samjin Co.LTD- Tan Co JSC.pdf
5/23/201918101810 SMC4-MS-209 Report on Storage of Steel Plate & Shape Steel at Fabrication Yard.pdf
5/23/201918111811 SMC4-WD-264 WD of Super T Girder Span 40 (P39-P40).pdf
5/23/201918121812 SMC4-MA-345 Report on Frequency Test of Cement, Coarse Aggregate Fine Aggregate & Water for Cement Concrete at Transmeco BP ( 16th to 20th).pdf
5/23/201918131813 SMC4-WD-265 WD of Substructure - Pier P54.pdf
5/23/201918141814 SMC4-WD-266 WD of Substructure - Pile Cap P14.pdf
5/23/201918151815 SMC4-WD-267 WD of Substructure - Pile Cap P13.pdf
5/23/201918161816 SMC4-WD-268 WD of Substructure - Pile Cap P12.pdf
5/23/201918171817 SMC4-WD-269 WD of Substructure - Pile Cap P11.pdf
5/23/201918181818 SMC4-WD-270 WD of Substructure - Pier P53.pdf
5/30/201918191819 SMC4-LC-557 Report on Environment Monitoring in Construction Stage (2nd in May 2019).pdf
5/23/201918201820 SMC4-LC-558 Replacement of Some Pre Tensioning Pre Stressed Super T Girders of the Same Type Span S30 by S24 during Erection.pdf
5/23/201918211821 SMC4-LC-559 Document of Additional Bored Pile for Pier P43C.pdf
5/24/201918221822 SMC4-LC-560 Report on the Problem with the Anchor bar of girder G6-S21.pdf
5/24/201918231823 SMC4-WD-271 WD of Super T girder Spans S51-S52 and Spans S54-S61.pdf
5/24/201918241824 SMC4-WD-272 WD of Detail of Detail of Segments 1 to 5 of Steel Girder.pdf
5/24/201918251825 SMC4-LC-563 Sub of Result of Ultrasonic test of cast-in-place concrete Piles at P39.pdf
5/24/201918261826 SMC4-LC-562 Result of Ultrasonic Test of Cast-in-place Piles at P38-Pile 10.pdf
5/24/201918271827 SMC4-MA-355 Report on Frequency test of Epoxy Coated PC Strand (5th Time) of Zhemao Science and Technology used Pier Head.pdf
5/24/201918281828 SMC4-LC-561 Additional Supervision Cost of Engineer's Staf(March 2019).pdf
6/17/201918291829 SMC4-LC-564 Organization Chart and List of Key Personnel.pdf
5/25/201918301830 SMC4-MA-356 Approval of capacity Profile of Manufacture and Supplier of dowe D32,D60 Hai Anh.pdf
5/25/201918311831 SMC4-MS-210 Document of Protection and Relocation Existing Utilities at section P41-P43 Right side and Pier P53.pdf
5/27/201918321832 SMC4-LC-0565 Proposal for Approval of the Contractor's Programme(Rev.2).pdf
5/25/201918331833 SMC4-MA-357 Update and Supplement of capacity profile of Batching plant Viet Tiep.pdf
5/27/201918341834 SMC4-LC-566 Submission of Information of Subcontrectors Engaged on the Project.pdf
5/28/201918351835 SMC4-LC-567 Report on Damaged Underground Electric Cable during the Construction of Pile No. C5P53.pdf
5/27/201918361836 1669-BQLDATL-DA1 Invitation- Site Inspection in order to Argree on the Construction site area following the Alterniative of Traffic land Distribution & Traffic Control.pdf
5/28/201918371837 BGTVT-CQLXD&CLCTGT Invitation to Site Inspection Date 29.5.2019.pdf
5/28/201918381838 SMC4-WD-273 WD of Detail of Segments 17 to 21 of Steel Girder (2nd).pdf
5/28/201918391839 SMC4-MA-358 Characteristic Strength for Concrete Class Y of Transmeco BP- Report 1 , 2.pdf
5/28/201918401840 SMC4-MS-211 Calculation of Tendon Cable Elongation for Pier Head P27.pdf
5/28/201918411841 SMC4-MS-212 Calculation of Tendon Cable Elongation for Pier Head P23.pdf
5/28/201918421842 SMC4-LC-568 Weekly Report No.53.pdf
5/28/201918431843 SMC4-LC-569 Report of Surface Repairing Work on Pier Head P19.pdf
5/30/201918441844 SMC4-LC-570 Notice of Claim on Unforeseeable Physical Conditions Found by the Contractor during Construction of CIP Pile for P53.pdf
5/30/201918451845 SMC4-LC-571 Result of Ultrasonic Test of CIP Concrete Piles at P59.pdf
5/30/201918461846 SMC4-LC-572 Result of Ultrasonic Test of CIP Concrete Pile at P60.pdf
5/30/201918471847 SMC4-LC-573 Withdrawal of the Letter LC-0566 dated 27 may 19.pdf
5/30/201918481848 SMC4-WD-274 WD of Substructure P51.pdf
5/30/201918491849 SMC4-WD-275 WD of Substructure P52.pdf
5/30/201918501850 SMC4-WD-276 WD of Super T Girder Span S53.pdf
5/30/201918511851 SMC4-AD-49 As Built Drawings of Pre Tensioning Pre Stressed Super T Girder Span 29 (P28-P29).pdf
5/30/201918521852 SMC4-MS-213 Outline for Loading Test of Pier Heads Supporting System at P16.pdf
5/30/201918531853 SMC4-MS-214 MS of Structure Excavation from P57-P60.pdf
5/29/201918541854 SMC4-MA-359 Trial Mixing Work of Concrete Proportions Class A,B1,B2,C1,C3,C4,D,E,G &Y at Viet Tiep BP after Moving to New Location.pdf
5/29/201918551855 SMC4-MA-360 Trial mixing Work of Concrete Proportions Class A, B1,C1,C3,C4, D,E,G & Y at ASEAN BP after Moving to New Location.pdf
5/30/201918561856 SMC4-MA-361 Report on Frequency Test of Reinforcing Steel VGS for CIP Concrete Pile of P48, P49.pdf
5/30/201918571857 SMC4-MA-362 Report on Frequency Test of Reinforcing Steel for Pile Cap & Pier Column& Pier Head of P24(5th)-P25,P26(4th).pdf
6/17/201918581858 SMC4-MS-215 Document of Relocation Existing Utilities at P60.pdf
5/28/201918591859 1756-PMUTL-DA1 & TCQM Invitation to Site Inspection.pdf
5/30/201918601860 SMC4-LC-574 Acceptance of Sub Structure Construction Stage & Tranfer to Construction of Superstructure Work for P19.pdf
5/30/201918611861 SMC4-LC-575 Notice of Environmental Monitoring Schedule in June 2019 at Construction Phase.pdf
5/30/201918621862 SMC4-LC-576 Report of Surface Repairing Work on Pier Head P29.pdf
5/30/201918631863 SMC4-WD-277 WD of Basement for ITS Sign Board at P25 and P52.pdf
5/30/201918641864 SMC4-WD-278 WD of General Arrangement of Foundation of ITS System for Expressway.pdf
5/30/201918651865 SMC4-WD-279 WD of Deck Slab Spans 34, 35 & Link Slab at P33,P34,P35.pdf
5/30/201918661866 SMC4-MS-216 Reconnect Culvert Pipe D1250 of Ministry of Public Plan (2nd).pdf
5/31/201918671867 SMC4-LC-577 Withdrawal of the Letter SMC4-MA-0359 & 0360 dated 28May2019.pdf
5/31/201918681868 SMC4-MA-365 Trial Mixing Working of Concrete Proporttions Class A,B1,B2,C1,C3,C4,D,E,G& Y at the VIET TIEP BP after Moving tho New Location.pdf
5/31/201918691869 SMC4-MA-366 Trial Mixing Working of Concrete Proportions Class A,B1,C1,C3,C4,D,E,G & Y at the ASEAN BP after Moving to New Location.pdf
5/31/201918701870 SMC4-LC-578 Additional Mobilization Document for Cranes & Trailers to Serve Transportation & Erection Work of Super T Girders (3rd).pdf
5/31/201918711871 SMC4-LC-579 Report on Status of Connection Drainage Sytem between 2 Project (2nd).pdf
6/19/201918721872 SMC4-LC-580 Contractor's Improvement Plan for Super T Girder's Production- Erection Works.pdf
5/31/201918731873 SMC4-MA-367 Use Galvanized Dowel D32,D60 Manufactured by Hai Anh Co.Ltd.pdf
5/31/201918741874 SMC4-MA-364 Report on Test Result of Welding Material for Steel Bridge.pdf
5/31/201918751875 SMC4-MA-363 Test Result of Welding Procedure for Steel Bridge.pdf
5/31/201918761876 SMC4-WD-280 WD of Super T Girder Span S46-S47.pdf
5/31/201918771877 SMC4-WD-281 WD of Super T Girders Span S48-S49.pdf
6/4/201918781878 SMC4-LC- 581 Submission of Video CS No.2 (6months Period from Nov2018 to Apr2019).pdf
6/4/201918791879 SMC4-RP-60 Report of Excavation for Survey of Underground Utilities at P47.pdf
6/4/201918801880 SMC4-RP-61 Report of Excavation for Survey of Underground Utilities at P48.pdf
6/4/201918811881 SMC4-RP-62 Report of Excavation for Survey of Underground Utilities at P49.pdf
6/4/201918821882 SMC4-RP-63 Report of Excavation for Survey of Underground Utilities at P52.pdf
6/4/201918831883 SMC4-RP-64 Report on Excavation for Survey of Underground Utilities at P54.pdf
6/4/201918841884 SMC4-RP-65 Report of Excavation for Survey of Underground Utiliites at P57.pdf
6/4/201918851885 SMC4-RP-66 Report of Excavation for Survey of Underground Utilities at P58.pdf
6/4/201918861886 SMC4-RP-67 Report of Excavation for Survey of Underground Utilities at P59.pdf
6/18/201918871887 SMC4-LC-584 Submission of Schedule for Steel Bridge.pdf
6/4/201918881888 SMC4-MS-217 MS of Traffic Control for Public Road at P38-P60 - Vol-VII.3-Arranging TC after Extending Site Fence at P46-P50 Right Side.pdf
6/4/201918891889 SMC4-LC-585 Report on Condition of Concrete Surface on Pier Head P23.pdf
6/13/201918901890 1834 QD BQLDATL Approval Decision for Cost Estimates of Cast-in-place concrete piles for Piers from P9-P15,P45-P58 to P108.pdf
6/4/201918911891 SMC4-MA-368 Proposal to Use Concrete Painting Material for Concrete by Klaas Coating LTD & Supplied Hiep An JSC.pdf
6/13/201918921892 SMC4-MA-369 Report on Frequency Test of PC Strand for Super T Girder (21st).pdf
6/4/201918931893 SMC4-LC-582 Submission of Weekly Report No.54.pdf
6/4/201918941894 SMC4-LC-583 Engineer's Confirmation for Safety & Environment Satisfaction (May 101,2019 to May 31,2019).pdf
6/6/201918951895 SMC4-LC-586 Report on Environment Monitoring on Construction Stage (3rd Phase in May 2019, Base on S1.43).pdf
6/4/201918961896 SMC4-WD-282 WD of Deck Slab Spans 25, 26, 29 & Link Slab P24-P26, P28, P29.pdf
6/4/201918971897 SMC4-WD-283 WD of Super T Girder Span S50 (P49-P50).pdf
6/4/201918981898 SMC4-MS-218 Method Drawing for Erection of Super T Girder at Spans from P27-P30.pdf
6/4/201918991899 SMC4-LC-587 Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P29.pdf
6/5/201919001900 SMC4-LC-588 Organization Chart & Job Description of the Management & Key Personnel.pdf
6/13/201919011901 SMC4-MA-370 Characteristis Strength for Concrete Class C of Transmeco BP-Report 3 (from 17Feb to 2Apr2019).pdf
6/5/201919021902 SMC4-MA-371 Characteristic Strength for Concrete Class Y of Transmeco BP-Report 3( 4Mar to 28Apr2019).pdf
6/5/201919031903 SMC4-WD-284 WD of Detail of Connection, Cross Beam, Manhole, Handhole & Water Drain of Steel Girder.pdf
6/5/201919041904 SMC4-LC-589 Notice for Leave of Key Personnel (Project Manager).pdf
6/5/201919051905 SMC4-MS-219 Resubmission of MS of Pre-Assembly of Steel Bridge at THANH LONG Factory.pdf
6/6/201919061906 SMC4-LC-591 Summarize & Update of Countermeasure to Improve the Construction of Pier Head.pdf
6/6/201919071907 SMC4-MA-373 Report on Testing Result of Welding Procedure for Steel Bridge.pdf
6/6/201919081908 SMC4-MA-375 Report on Test Result of Welding Material for Steel Bridge.pdf
6/7/201919091909 SMC4-LC-590 Notification of Delayed Approval-Instruction for WD of A1-P10 & A28L-P31L& P32L, P32R & P43L, P43C, P43R that affected to the Construction Schedule of Project.pdf
6/7/201919101910 SMC4-LC-592 Rechecking Result of Girders of S30, S24 & Proposal for Replacement of Pre Tensioning Pre Stressed Super T Girders of S30 by S24 for Erection.pdf
6/7/201919111911 SMC4-LC-593 Updated Quality Control Plan (2nd).pdf
6/7/201919121912 SMC4-MS-220 Method Drawing for Construction of Pier Head P15-P16.pdf
6/7/201919131913 SMC4-RP-68 Report for Excavation for Survey of Underground Utilities at P51.pdf
6/7/201919141914 SMC4-MA-372 Report on Frequency Test of Cement, Coarse Aggregate, Fine Aggregate & Admixture for Cement Concrete at Transmeco BP(21th-26th) & Updated testing Results on Cement (19th).pdf
6/7/201919151915 SMC4-MA-374 Report on Frequency Test of Reinforcing Steel for CIP Concrete Pier P38-P39,P40 (6th).pdf
6/7/201919161916 SMC4-MA-377 Report on Frequency Test of Reinforcing Steel for Super T Girder (7th) of Team 4 Co.422.pdf
6/7/201919171917 SMC4-MA-378 Report on Frequency Test of Reinforcing Steel-Vietnam Germany Steel for CIP Pile of P51-P54.pdf
6/8/201919181918 SMC4-MS-286 Document for Relocation Electric Cable 22KV at P53.pdf
6/8/201919191919 SMC4-WD-285 WD for CIP Concrete Pile for P43R & P43L.pdf
6/8/201919201920 SMC4-RP-70 Report of Excavation for Survey of Underground Utilities at P12.pdf
6/8/201919211921 SMC4-RP-71 Report of Excavation for Survey of Underground Utilities at P60.pdf
6/8/201919221922 SMC4-RP-69 Report of Excavation for Survey of Underground Utilities at P13.pdf
6/8/201919231923 SMC4-MA-376 Report on Frequency Test of PC Strand for Super T Girder (22nd).pdf
6/8/201919241924 SMC4-MA-379 Use Manterial for Subbase, Base Manufactured & Supplied by VIMECO JSC.pdf
6/8/201919251925 SMC4-LC-595 Additional Rebar Arrangement for Pier Head P16.pdf
6/8/201919261926 SMC4-MA-380 Report on Results Trial Mix of Concrete Class A ( version 2- Cemment 525kg) used BASF Admixture of VIETTIEP BP ( New Location) & Using Mix Proportion for Construction of Super T Girder.pdf
6/8/201919271927 5210 BGTVT-CQLXD Strengthening control of quality progress and labor safety.pdf
6/8/201919281928 376 CQLXD-DDB1 Report on Results of Site Inspection.pdf
6/8/201919291929 2038 BQLDATL-DA1 HCRR3 Removal of Crossing Drainage Pipe on Pham Van Dong Road.pdf
6/10/201919301930 SMC4-MA-381 Report on Test of Jack, Anchorage & Synchoronous Experiment of Jack, PC Strand, Anchorage for Super T Girder (4th).pdf
6/10/201919311931 SMC4-MA- 382 Report on Test Result of Galvanized Dowel D32, D60 - Viet Thang Co.LTD.pdf
6/10/201919321932 SMC4-LC-594 Additional Information of Subcontractors Engaged in the Project.pdf
6/10/201919331933 SMC4-RP-72 Report on Remedy Defect of Super T Girder (6 Fabricated Super T Girders).pdf
6/10/201919341934 SMC4-MS-221 Calcuclation of Tendon Cable Elongation for Pier Head from P36.pdf
6/10/201919351935 SMC4-MA-383 Use of Viet Tiep BP after Moving to New Location.pdf
6/10/201919361936 SMC4-WD-287 WD of Substructure - Pier P48.pdf
6/10/201919371937 SMC4-WD-288 WD of Substructure -Pier P49.pdf
6/10/201919381938 SMC4-WD-289 WD of Substructure- Pier P50.pdf
6/11/201919391939 SMC4-LC-596 Submision of Internal Target Construction Schedule of the Contractor.pdf
6/17/201919401940 SMC4-MS-222 MS of Traffic Control for Public Road for Construction Superstructure.pdf
6/11/201919411941 SMC4-LC-597 Notice of Equipment Demobilization -Crane Kobelco 7065 at P35 under Scope of 479 Co..pdf
6/11/201919421942 SMC4-LC-598 Report of Result for Confirmation Quality of Concrete of CIP Concrete Pilling- Pile No. C2P38.pdf
6/11/201919431943 2064-PMUTL-DHDA1 Checking Pier Head of P34.pdf
6/11/201919441944 2053-PMUTL-DA1 Appropval of Subcontractor for Execution of Non Destructive Inspection for Welding of Steel Girder & Pier Head.pdf
6/11/201919451945 SMC4-LC-599 Report on Environment Monitoring in Construction Stage (1st Phase in June 2019, based on S1.43).pdf
6/11/201919461946 SMC4-LC 600 Report of Surface Repairing Work on Pier Head P33.pdf
6/12/201919471947 2066 PMUTL-DA1 Approval of Additional Cost Estimate for tests on cast-in-place concrete Piles D1200 in Package 1,2.pdf
6/12/201919481948 SMC4-LC-601 Report of Crack Phenomenon on Pier Head P34.pdf
6/12/201919491949 SMC4-MS-223 Supplement of the Construction Method Drawing of Diaphragm at Span S22 (P21-P22) Mai Dich Side.pdf
6/12/201919501950 SMC4-MS-224 Construction Method Drawing for Lower Part of Pier Head from P41-P42.pdf
6/12/201919511951 SMC4-MS-225 Supplement of Calculation of Tendon Cable Elongation for Pier Head at P36.pdf
6/12/201919521952 SMC4-LC-602 Result of Tip Contact Checking Test of CIP Concrete Pile C4-P39.pdf
6/12/201919531953 SMC4-MA-384 Test Result of Shape Steel Material of Nippon Steel & Sumitomo Metal Cor..pdf
6/12/201919541954 SMC4-MA-385 Report on Frequency Test of PC Strand for Super T Girder (23rd).pdf
6/12/201919551955 SMC4-MA-386 Report on Frequency Test of Reinforcing Steel for Super T Girder (5th) of Team 01 Co.414.pdf
6/12/201919561956 SMC4-RP-73 Report of Excavation for Survey of Underground Utilities at P42C.pdf
6/12/201919571957 SMC4-RP-74 Report of Excavation for Survey of Underground Utilities at P50.pdf
6/12/201919581958 SMC4-AD-50 AD of CIP Concrete Piling D1.2m of Pier P39.pdf
6/12/201919591959 SMC4-AD-51 AD of CIP Concrete Piling D1.2m of Pier P38.pdf
6/12/201919601960 SMC4-AD-52 AD of CIP Concrete Piling D1.2m of Pier P14.pdf
6/12/201919611961 SMC4-AD-53 AD of CIP Concrete Piling D1.2m of Pier P60.pdf
6/12/201919621962 SMC4-AD-54 AD of CIP Concrete Piling D1.2m of Pier P59.pdf
6/12/201919631963 SMC4-AD-55 AD of Pre Tensioning Pre Stressed SuperT Girder Span 34 (P33-P34).pdf
6/13/201919641964 SMC4-LC-603 Report on Implementation of Temporary Water Drainage for the Ministry of Public Secrurity Office.pdf
6/13/201919651965 SMC4-LC-604 Reply to the Engineer's on Delay Reparing Work of Drilling Machine at P54 & P57.pdf
6/13/201919661966 SMC4-LP-44 To Support the Contractor in Relocating Camera Control Cabinet at Pier P28.pdf
6/13/201919671967 SMC4-LC-605 Changing Design of Drainage Pipe Culvert D500 (2nd).pdf
6/13/201919681968 SMC4-LC-606 Result of Tip Contact Checking Test of CIP Concrete Pile C1-P59.pdf
6/13/201919691969 SMC4-AD-56 AD of Substructure- Pile Cap, Pier Column & Pier Head of Pier P28.pdf
6/13/201919701970 SMC4-AD-57 AD of Backfill for Section P28-P29.pdf
6/14/201919711971 SMC4-MA-387 Use Membrane on Pier Head for Friction Cut Material- SBS Modified Bitumen Waterproof Membrane by WEIFANG LUYANG WM Co. & supplied by HIEP AN JSC.pdf
6/14/201919721972 SMC4-LC-607 Submission of Weekly Report No.55.pdf
6/14/201919731973 SMC4-LC-608 Submission of Weekly Report No.56.pdf
6/14/201919741974 SMC4-LC-609 Submission of Monthly Report No.13.pdf
6/14/201919751975 SMC4-LC-611 Resubmission of Organization Chart & Key Personnel Job Description of the Management & Key Personnel.pdf
6/14/201919761976 SMC4-LC-610 Report of Surface Condition & Repairing Work on Pier Head P28.pdf
6/14/201919771977 SMC4-MA-388 Report on Trial Mix of Concrete Class B1,C1,C3,C4,G & Y at Asean BP ( new Location) & Using Mix Proporting for Construction of PK1.pdf
6/14/201919781978 SMC4-RP-75 Report on Excavation for Survey of Underground Utilities at P11.pdf
6/14/201919791979 SMC4-MS-226 Supplement of the Calculation for Pre Stressing of Super T Girder 38m-Group No.1 Co.422.pdf
6/17/201919801980 SMC4-MS-227 MS of Pile Cap from P11-P13.pdf
6/17/201919811981 SMC4-RP-76 Report on Excavation for Survey of Underground Utilities at P14.pdf
6/17/201919821982 SMC4-RP-77 Report on Loading Test of Pier Head's Supporting System at P16.pdf
6/17/201919831983 SMC4-LC-612 Updated Report of Crack Phenomenon on Pier Head P34.pdf
6/17/201919841984 SMC4-MS-228 Method Drawing for Construction of Pile Cap from P59-P60.pdf
6/18/201919851985 SMC4-WD-290 WD of Detail of Segment 1 to 5 of Steel Girder (2nd).pdf
6/18/201919861986 SMC4-MS-229 MS of Traffic Control for Public Road at P38-P60 - Vol VII.3 Arranging Traffic Control after Extending Site Fence at P46-P47 & P55-P56 Right Side.pdf
6/18/201919871987 SMC4-MS-230 Supplement of Construction Method Drawing of Diaphragm from P19-P31.pdf
6/26/201919881988 SMC4-LC-614 Mobilization Document for Equipment & Labour of Subcontrctor PHATECO JSC for NDT of Steel Bridge (1st).pdf
6/18/201919891989 SMC4-MC-14 Application for Interim Payment Certificate No.11 (Period May 1,2019 to May 31,2019).pdf
6/19/201919901990 SMC4-LC-615 Report on Status of Connection Drainage System between 2 Project (3rd).pdf
6/19/201919911991 SMC4-LC-616 Top Elevation of Bearing Pad in According with Actual Camber of Super T Girder at Span S35-S37.pdf
6/19/201919921992 SMC4-MA-389 Report on Frequency Test of PC Strand for Super T Girder (24th).pdf
6/19/201919931993 SMC4-MS-231 MS of Gate Arrangement at Pier P25-P26.pdf
6/19/201919941994 SMC4-MS-232 Calculation of Tendon Cable Elongation for Pier Head P16.pdf
6/19/201919951995 SMC4-LC-617 Reply to the Engineer's Comment Regarding the Improvement Method for Construction of Pier Head.pdf
6/20/201919961996 SMC4-RP-78 Transportation Plan of Super T Girder & Permit from Directorate for Road of Viet Nam.pdf
6/20/201919971997 SMC4-LC-618 Additional Mobilization Document-Welder Qualification Record for Steel Bridge Work of Subcontractor Thanh Long JSC(4th).pdf
6/20/201919981998 SMC4-LC-619 Additional Information of Subcontractors Engaged in Project.pdf
6/20/201919991999 SMC4-LC-620 Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P28.pdf
6/21/201920002000 2178-TB-BQLDATL Notice on Conclusions given by PMUTL in the Meeting to Review the Implementation of PK1 & PK2.pdf
6/21/201920012001 SMC4-LC-621 Submission of Weekly Report No.57.pdf
6/21/201920022002 SMC4-AD-58 As Built Drawings of CIP Concrete Pile of P13.pdf
7/9/201920032003 SMC4-LC-624 Outline for Repairing Cracks on Pier Head P34 & Capacity Profile of Crack Repairing Service- Transport & Communication Consulting & Construction JSC.pdf
6/24/201920042004 SMC4-LC-622 Report on Environment Monitoring in Construction Stage (2nd Phase in June 2019 based on S1.43).pdf
6/24/201920052005 SMC4-MA-391 Supplier Transport Material Equipment Trading JSC for Reinforcing Steel VN Italy Steel JSC.pdf
6/26/201920062006 SMC4-LC- 623 Report of Surface Repairing Work on Pier Head P23.pdf
6/27/201920072007 SMC4-MA-390 Accelerated Weather Resistance Resting Result at 500 Hours & 1000 Hours of Fluorex Finish Top Coat of Hai Phong JSC.pdf
6/27/201920082008 SMC4-MA-390B Report on Frequency Test of Reinforcing Steel VGS Steel for Pile Cap, Pier Column & Pier Head of P59, P60, P14 (2nd).pdf
6/24/201920092009 SMC4-MA-390A Report on Frequency Test of Reinforcing Steel VGS Steel for Pile Cap, Pier Column & Pier Head P59, P60, P14.pdf
6/24/201920102010 SMC4-MS-233 MS for Construction of Pile Cap from P59-P60 (Rev.2).pdf
6/24/201920112011 SMC4-MA-393 Report on Frequency Test of Reinforcing Steel VN Germany Steel for CIP COncrete Pile of P51-P54 (2nd).pdf
6/24/201920122012 SMC4-MA-392 Report on Frequency Test of Reinforcing Steel VN Germany Steel for Pile Cap, Pier Column & Pier Head of P11-P13.pdf
6/25/201920132013 SMC4-MS-234 MS for Painting of External Super T Girder.pdf
6/25/201920142014 SMC4-MS-235 Method Drawing for Erection of Super T Girder at Spans S23(P22-P23).pdf
6/25/201920152015 SMC4-MA-394 Report on Frequency Test of Reinforcing Steel for Pile Cap, Pier Column, Pier Head of Pier P38 (5th), P39, P40 (4th).pdf
6/25/201920162016 SMC4-WD-291 WD of Details of Connection, Cross Beam, Man Hole, Hand Hole, Water Drain of Steel Girder (2nd).pdf
6/25/201920172017 SMC4-AD-59 As Built Drawings of CIP Concrete Piling D1.2m of P42C.pdf
6/25/201920182018 SMC4-AD-60 AD of Pre-tensioning Pre-stressed Super-Tee Girder Span 23(P22-P23).pdf
6/25/201920192019 SMC4-LC-626 Supplement Data of Cracks on Thang Long Side of Pier Head P34.pdf
7/9/201920202020 SMC4-LC-625 Installation of RC Planks for Super-T Girder and for the Construction of Diaphragm.pdf
6/26/201920212021 SMC4-LP-46 Supporting the Contractor in Handing Over Materials & Assets of Traffic Signal System & Concrete Blocks for Managerment Units.pdf
6/26/201920222022 SMC4-LP-45 Supporting the Contractor in Extending the Method of Fencing, TC for Construction Eriction Super T Girder & Licensing Regarding Method of TC.pdf
6/26/201920232023 SMC4-WD-292 WD of Super T Girder Spans S51-S52 (2nd).pdf
6/26/201920242024 SMC4-WD-293 WD of Super T Girder Span S54-S61 (2nd).pdf
6/27/201920252025 SMC4-MS-231A MS for Construction of Pier Head from P15-P16 (Rev.2).pdf
6/26/201920262026 SMC4-MS-236 MS of Traffic Control for Public Road at Section at A1-P25- Vol VIII.1- Arranging Traffic Control at Section A1- P25.pdf
6/26/201920272027 SMC4-MS-237 Supplement of the Construction Method Drawing of Pier Head 2nd Tesioning & Construction Ear Wall, Block Out of Anchorage.pdf
6/26/201920282028 SMC4-LC-627 Additional Mobilization Documents Manpower & Equipment for Substructure Work at the Area P8-P13 under Scope of Co.422.pdf
6/26/201920292029 SMC4-LC-628 Additional Mobilization Document for 2 Trailers & Renewal of Registration Certificate for 1 Tractor for Transportation & Erection Work of Super T Girder (4th).pdf
6/26/201920302030 SMC4-WD-294 WD of Super T Girder Span S44.pdf
6/26/201920312031 SMC4-WD-295 WD of Super T Girder Span S45.pdf
6/26/201920322032 SMC4-RP-79 Supplement of Permit from Directorate for Road of Viet Nam.pdf
6/27/201920332033 MOT-PMUTL Invitation 27Jun2019 Inspectation & Review the Execution of Steel Bridges of HCRR3 Construction Project.pdf
6/29/201920342034 SMC4-LC-629 Submission of Sub Contract Agreement Between Main Contractor & Sub Contractor for Non-Destructive Test.pdf
6/27/201920352035 SMC4-RP-80 Report on Excavation for Survey of Underground Utilities at P46.pdf
6/27/201920362036 SMC4-MA-395 Trial Mix of Concrete C1, C3, C4 and Y at Viet Tiep BP ( New Location) & Using Mix Proportion for Construction of PK1.pdf
7/2/201920372037 SMC4-LC-631 Submission of Result of Ultrasonic Test of Cast in Place Concrete Piles at P58.pdf
6/28/201920382038 SMC4-WD-296 WD of Substructure Pile Cap of Pier P32C(2th).pdf
6/28/201920392039 SMC4-LC-630 Notice of Environmental Monitoring Schedule in July 2019 at Construction Phase.pdf
6/28/201920402040 SMC4-LC-633 Revised Programme and Acceleration of Construction Progress.pdf
6/28/201920412041 SMC4-MA-396 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column, Pier Head of Piers P38,P41,P42,P43(6th) and Piers P39,P40(5th).pdf
7/5/201920422042 SMC4-MA-397 Report on Frequency Test of Reinforcing Steel for Super T Girder(8th) of Team 4(Co.422).pdf
6/28/201920432043 SMC4-RP-0081 Report on Excavation for Survay of Underground Utilities at P47(2nd).pdf
7/1/201920442044 SMC4-LC-634 Construction Work for the 1st Stage of Pier Column (5-Metter Height) of Piers P11-P14 and P32C.pdf
7/1/201920452045 SMC4-MS-238 Method Statement of Pier Column from P59-P60.pdf
7/13/201920462046 SMC4-MS-239 MS of TC for Public Road at Section P38-P60. Volume VII.4- Arranging TC after Extending Site Fence at Section P38-P56.pdf
7/1/201920472047 SMC4-WD-297 WD of Backfill for Sections P32&P41-P43&P46-P60 (3nd).pdf
7/1/201920482048 SMC4-MA-398 Report on Frequency Test of Reinforcing Steel for Pile Cap, Pier Column & Pier Head of Piers P57, P58 (1st).pdf
7/1/201920492049 SMC4-LC-632-19 Variation Order No. VO-HRR3-PK1-004 -Design Change of Pile Foundation at P9-P15 and P45-P58 Section.pdf
7/1/201920502050 2402 PMUTL-DHDA1 Implementation of Decision No.1219-QD-BGTVT dated June 27,2019 by the Ministry of Transport(MOT).pdf
7/1/201920512051 2430-PMUTL- Invitation to attend a Site Inspection & Review the Execution of Steel Bridges of the HCRR3 Construction Project.pdf
7/1/201920522052 SMC4-LC-636 Additional Supervision Cost of Engineer's Staff (April 2019).pdf
7/1/201920532053 SMC4-LC-628A Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P23.pdf
7/1/201920542054 SMC4-LC-628B Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P42C.pdf
7/1/201920552055 SMC4-LC-628C Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P60.pdf
7/1/201920562056 SMC4-AD-61-As Built Drawings of CIP Concrete Piling D1.2m of Pier P12.pdf
7/1/201920572057 SMC4-LC-635 Submission of Weekly Report No.58.pdf
7/2/201920582058 SMC4-MS-240 Method Drawing for Erection of Super T Girder at Span S28 ( P27-P28).pdf
7/2/201920592059 2453-BQLDATL-GM Attending at Meeting on some Clarifications of Detailed Design of HCRR3 Construction Project.pdf
7/3/201920602060 SMC4-LC-638 Report on Environment Monitoring in Construction Stage (3rd Phase in June 2019 based S1.43).pdf
7/3/201920612061 SMC4-MA-399 Characteristic Strength for Concrete Class C of Transmeco BP- Report 4 (4Apr to 12May2019).pdf
7/3/201920622062 SMC4-RP-82 Report on Loading Test of Supporting System P24.pdf
7/3/201920632063 SMC4-LC-639 Additional CIP Concrete Pilling for P43C (2nd).pdf
7/18/201920642064 SMC4-MS-241 Adjusted Plan for Reconnect Culvert Pipe of Ministry of Police Public (3rd).pdf
7/3/201920652065 SMC4-WD-298 WD of Deck Slab Span 38& 39 & Link Slab at P37-P39.pdf
7/3/201920662066 SMC4-AD-62 AD of Pre Tensioning Pre Stressed Super T Girder Span 28 (P27-P28).pdf
7/4/201920672067 SMC4-LC-628D Acceptance of C.I.P Pile Foundation Construction Stage and Transfer to Construction of Substructure Work for P13.pdf
7/4/201920682068 SMC4-LC-637 Acceptance of Sub Structure Construction Stage and Transfer to Construction of Superstructure Work for P27.pdf
7/5/201920692069 SMC4-LC-640 Approved of Top Elevation of Bearing pad in Accordance with Actual Camber of Super T Girder at Spans S24,S25,S28.pdf
7/5/201920702070 SMC4-LC-641 Stage Inspection for the Week from July 6th,2019 to July 12th, 2019.pdf
7/5/201920712071 SMC4-LC-642 Result of Ultrasonic Test of Cast in place Concrete Piles at P57.pdf
7/5/201920722072 SMC4-LC-643 Report on Environmental Monitoring Results at Stage 2 - 2019 at Steel Structure Fabrication Factory of Thanh Long Group JSC.pdf
7/5/201920732073 SMC4-AD-63 AD of Pre Tensioning Pre Stressed Super T Girder Span 37 (P36-P37).pdf
7/5/201920742074 SMC4-AD-64 AD of Pre Tensioning Pre Stressed Super T Girder Span 36 (P35-P36).pdf
7/5/201920752075 SMC4-RP-83 Excavation for Survey of Underground Utilities at P55,P56.pdf
7/5/201920762076 SMC4-WD-299 WD of Elastomeric bearing (from P15 to P16).pdf
7/5/201920772077 SMC4-MA-400 The Characteristic Strength for Concrete Class Y of Transmeco Batching Plant, Report No 4 (from 4.5.2019 to 27.5.2019).pdf
7/5/201920782078 SMC4-MA-401 Report on Frequency Test of Reinforcing Steel for Pier Head of Pier P26 (5th).pdf
7/6/201920792079 SMC4-MA-402 Report on Frequency Test of Reinforcing Steel for Pile Cap, Pier Column and Pier Head of P14(3th).pdf
7/5/201920802080 SMC4-MA-403 Report on Frequency Test of Reinforcing Steel for Cast in Place Concrete Pile Pier P46,P47 (2nd) and Pile Cap, Pier Column, Pier Head P24(6th), Pile Cap, Pier Column, Pier Head P25&P26 (5th).pdf
7/5/201920812081 SMC4-MA-404 Report on Frequency Test of PC Strand for Super T Girder (25th).pdf
7/5/201920822082 SMC4-MS-242 MS of Temporary Facilities Arrangement on Site from P38-P56.pdf
7/5/201920832083 SMC4-MS-243 MS for Lower Part of Pier Head P59-P60.pdf
7/5/201920842084 SMC4-MS-244 MS of Pile Cap from P57-P58.pdf
7/5/201920852085 SMC4-AD-65 AD of CIP Concrete Pilling D1.2m of P58.pdf
7/5/201920862086 SMC4-AD-66 AD of CIP Concrete Pilling D1.2m of Pier P57.pdf
7/5/201920872087 SMC4-MS-245 MS for Erection of Super T Girder at Spans S37 ( P36-P37).pdf
7/6/201920882088 SMC4-LC-644 Acceptance of CIP Concrete Pile Foundation Construction Stage & Tranfer to Construction of Substructure Work for P12.pdf
7/8/201920892089 SMC4-MA-405 Report on Frequency Test of Cement, Coarse Aggregate, Coarse Aggregate for Class A, Fine Aggregate , Admixture & Water for Cerment Concrete at Viet Tiep BP (7th).pdf
7/8/201920902090 SMC4-MA-406 Report on Frequency Test of Cement, Coarse Aggregate, Fine Aggregate & Water for Cement Concrete at TRANSMECO BP (27th to 32nd) & Updated Testing Results (17th,22nd,23rd).pdf
7/8/201920912091 SMC4-LC-645 Summary Table of Waste Disposal Implemented by the Subcontractors at Nguyen Khe Disposal Area from Jan to Mar 2019.pdf
7/8/201920922092 SMC4-LC-646 Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P35.pdf
7/8/201920932093 SMC4-LC-647 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P14.pdf
7/9/201920942094 SMC4-LC-648 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Subtructure Work for P58.pdf
7/9/201920952095 SMC4-MS-245A Method Drawing of Pier Head & Loading Test of Pier Head's Supporting System at P26.pdf
7/9/201920962096 SMC4-AD-67 As Built Drawings of Pre Tensioning Pre Stressed Super T Girder Span 35 (P34-P35).pdf
7/8/201920972097 SMC4-LC-651 Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P36..pdf
7/8/201920982098 SMC4-LC-652 Acceptance of Sub Structure Construction Stage & Tranfer to Construction of Superstructure Work for P37.pdf
7/9/201920992099 SMC4-MS-246 Calculation of Tendon Cable Elongation for Pier Head P24.pdf
7/9/201921002100 SMC4-MS-247 Outline for Loading Test of Pier Head's Supporting System P38-P40.pdf
7/9/201921012101 SMC4-RP-84 Notice of DOT Regarding- Traffic Diversion & Organization on PVD Street for Construction of Superstructure Items ( Pier Head Tensioning, Daphragm , Deck Slab, Parapet, etc.).pdf
7/9/201921022102 SMC4-RP-85 Notice of DOT Regarding- Traffic Diversion & Organization on PVD Street for Super T Girder Erection.pdf
7/9/201921032103 SMC4-WD-300 WD of Substructure - Pile Cap P43.pdf
7/10/201921042104 SMC4-LC-657 Withdrawal of the Letter SMC4-MA-0403-19 dated 05Jun2019.pdf
7/10/201921052105 SMC4-MA-398A Report on Frequency Test of Reinforcing Steel for CIP Concrete Pile P46,P47 (2nd) & Pile Cap, Pier Column, Pier Head (6th) Pile Cap, Pier Column Pier Head P25 (5th).pdf
7/10/201921062106 SMC4-LC-625A Withdrawal of the Letter SMC4-LC-0624-19 dated 22Jun2019.pdf
7/10/201921072107 SMC4-LC-627A Outline for Repairing Carks on Pier Head P34 & Capacity Profile of Crack Repairing Service- Transport & Commonication Consulting & Construction JSC.pdf
7/19/201921082108 SMC4-MS-248 MS of Pre-Assembly for Steel Bridge at Thanh Long Factory (3rd).pdf
7/10/201921092109 SMC4-LT-25 Capacity profile of Stone for Asphalt Concrete Pavement of Ha Tay JSC.pdf
7/10/201921102110 SMC4-MA-407 Report on Frequency Test of Reinforcing Steel of VGS for Super T Girder (7th) of Team 2 (407 Co.).pdf
7/10/201921112111 SMC4-MA-408 Report on Frequency Test of Steel for Pile Cap, Pier Column & Pier Head P57, P58 (2nd).pdf
7/10/201921122112 SMC4-MA-409 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column, Pier Head of P38,P41-P43(7th)& P39,P40(6th).pdf
7/10/201921132113 SMC4-LC-654 Manpower Mobilization Document of Subcontractor Hiep An.pdf
7/10/201921142114 SMC4-LC-655 Mobilization Document for Manpower & Machine of Subcontractor Thanh Long JSC for Transportaion of Steel Girders.pdf
7/10/201921152115 SMC4-LC-656 Additional Mobilization Document for Additonal Welders Basting & Painting Workers for Steel Bridge Work of Thanh Long JSC(5th).pdf
7/22/201921162116 SMC4-LC-658 Report on Environment Monitoring in Construction Stage June 2019 (Base on EMP).pdf
7/11/201921172117 SMC4-LC-659 Further Instruction on Specifications & BOQ Related to Design Modification of Relocation of Abutment A1.pdf
7/11/201921182118 SMC4-LC-660 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P58.pdf
7/12/201921192119 SMC4-MS-249 Outline for Loading Test of Pier Head Supporting System at P15.pdf
7/12/201921202120 SMC4-MS-250 Method Drawing for Erection of Super T Girder at S34 (P33-P34), S35 (P34-P35).pdf
7/12/201921212121 SMC4-MS-251 Method Statement of Pier Head from P38-P40.pdf
7/12/201921222122 SMC4-WD-304 WD of Substructure - Pier P14.pdf
7/12/201921232123 SMC4-WD-303 WD of Substrcuture - Pier P13.pdf
7/12/201921242124 SMC4-WD-302 WD of Substructure - Pier P12.pdf
7/12/201921252125 SMC4-WD-301 WD of Substructure - Pier P11.pdf
7/12/201921262126 SMC4-RP-86 Report on Loading Test of Pier Head's Supporting System at P25.pdf
7/12/201921272127 SMC4-RP-87 Report on Loading Test of Supporting System of Pier Head P26.pdf
7/12/201921282128 SMC4-LC-661 Submission of Weekly Report No.59.pdf
7/12/201921292129 SMC4-LC-662 Submission of Weekly Report No.60.pdf
7/12/201921302130 SMC4-WD-305 WD of Adjustment for Exterior Girder (EXT1-G5,EXT1-G6), Spans S10-S14.pdf
7/12/201921312131 SMC4-LC-663 Report on Environment Monitoring in Construction Stage(1st Phase in July 2019 based on S1.43).pdf
7/13/201921322132 SMC4-MS-253 MS of Diaphragm Construction from S37-S40.pdf
7/13/201921332133 SMC4-MS-254 MS of Pier Column from P11-P13.pdf
7/15/201921342134 SMC4-LC-665 Engineer's Confirmation for Safety and Environment Satisfaction (June 01,2019 to June 30,2019).pdf
7/15/201921352135 SMC4-WD-306 WD for Basement for Traffic Sign Board at Pier P50.pdf
7/15/201921362136 SMC4-307 WD for Basement for Traffic Sign Board at Pier P7.pdf
7/15/201921372137 SMC4-MA-410 RP on Frequency Test of Reinforcing Steel Vietnam Germany Steel for Super T Girder (9th) of Team 04(Co.422).pdf
7/15/201921382138 SMC4-MA-411 Changing Testing Standard of Waterproofing for Deck Slab Material (Haseal 5) of Technical Specification).pdf
7/15/201921392139 SMC4-MA-412 The Characteristic Strength for Concrete class A of Viet Tiep Batching Plant - RP No3 (from 4-4-2019 to 7-6-2019).pdf
7/27/201921402140 SMC4-MS-255 Approval of Method Statement of Deck Slab Construction from P19-P31.pdf
7/15/201921412141 2578-GM-BQLDATL Invitation Letter - Meeting on Design Modification of On-Off Ramps of HCRR3 Construction Project.pdf
7/15/201921422142 SMC4-WD-308 WD of Cast in Place Concrete Pile for Pier P9 (2nd).pdf
7/15/201921432143 SMC4-WD-309 WD of Cast in Place Concrete Pile for Pier P10 (2nd).pdf
7/15/201921442144 SMC4-AD-68 AD of Cast in Place Concrete Piling D1.2m of Pier P11.pdf
7/15/201921452145 SMC4-LC-666 Sub- Structure Construction Stage and Transfer to Construction of Superstructure Work for P33.pdf
7/15/201921462146 SMC4-LP-47 Short Name for VND Bank Account to be Disbursed by Counterpart-fund of PK1.pdf
7/15/201921472147 TB-BQLDATL Notice on Conclusions Given by PMU Thang Long in the Meeting to Review the Implementation of PK1 & 2 under the HCRR3 Construction Project.pdf
7/16/201921482148-SMC4-LC-664 Report on the Result of P34's Pier Head Concrete Quality Checking After Repaired.pdf
7/16/201921492149 SMC4-WD-310 WD of Cast in Place Concrete Pile for Pier P7 (2nd).pdf
7/16/201921502150 SMC4-WD-311 WD of Cast in Place Concrete Pile for Pier P8 (2nd).pdf
7/16/201921512151 SMC4-WD-312 WD of Cast in Place Concrete Pile for Abutment A1 (2nd).pdf
7/16/201921522152 SMC4-LC-653A Update Data of Cracks on P34 Pier Head (Thang Long Side) and Report of Cracks on P34C Pier Column.pdf
7/16/201921532153 SMC4-LC-667 Variation Order No. VO-HRR3-PK1-001A- Additional Cost Estimate for Test on Cast in Place Concrete Piles D1200 (Design Changed from Rotation Steel Piles to Cast in Place Concrete Piles.pdf
7/16/201921542154 Report for Site Instruction No 43 Dated 9 July 2019.pdf
7/16/201921552155 SMC4-LC-668 Monthly Report No.14.pdf
7/16/201921562156 SMC4-LC-670 Withdrawal of the letter SMC4-LC-659 dated 10 July 2019.pdf
7/17/201921572157 SMC4-LC-669 Sub-Structure Construction Stage and Transfer to Construction of Superstructure Work for P34.pdf
7/26/201921582158 2553 PMUTL-DHDA1 Approval of Variation Order No.VO-HRR3-PK1-004 for Design change of Pile Foundation at P9-P15 and P45-P58.pdf
7/18/201921592159 SMC4-LC-671 Updated Report of Crack Phenomenon on Pier Head P33 (16 Jun 19).pdf
7/26/201921602160 SMC4-LC-672 Report of Crack Phenomenon on Pier Head P35.pdf
7/18/201921612161 SMC4-MC-15 Application for Interim Payment Certificate No.12 ( Period June1 to Jun30,2019).pdf
7/18/201921622162 SMC4-LC-673 Response to the Engineer's Letter ENG-PK1-0907-19 dated 5Jul2919 Regarding Update of Construction Method of Pier Head Type based on Actual Site Condition.pdf
7/18/201921632163 SMC4-WD-313 WD of Super T Girder Span S9 (P8-P9).pdf
7/18/201921642164 SMC4-RP-88 Report on Excavation for Survey of Underground Utilities at P51 (2nd).pdf
7/18/201921652165 SMC4-RP-89 Report on Excavation for Survey of Underground Utilities at P52 (2nd).pdf
7/18/201921662166 SMC4-RP-90 Report on Loading Test of Pier Head's Supporting System at P15.pdf
7/19/201921672167 SMC4-MA-388A Supplier Vinh Hung Trading Consulting & Construction JSC for 2 Slots of PC Strand 15.2 of GUIZHOU Co..pdf
7/19/201921682168 SMC4-MA-406A Report on Frequency Test of PC Strand for Super T Girder ( 25th & 26th).pdf
7/20/201921692169 SMC4-AD-69 As-built Drawing of Pre Tensioning Pre Stressed Super T Girder Span 36 (P35-P36)(2nd).pdf
7/20/201921702170 SMC4-WD-314 WD of CIP Concrete Pile for P32R and P32L.pdf
7/20/201921712171 SMC4-WD-315 WD of Pile Cap of Side & Column of Pier P32.pdf
7/20/201921722172 SMC4-MA-413 Report on Frequency Test of Reinforcing Steel VGS for Pier Column of P11-P13.pdf
7/20/201921732173 SMC4-MA- 414 Report on Frequency Test of Reinforcing Steel VGS for Deck Slab, Parapet of Span S30.pdf
7/20/201921742174 SMC4-MA-415 Report on Frequency Test of Reinforcing Steel VGS for Super T Girder of Team 1( 414 Co).pdf
7/20/201921752175 SMC4-MA-416 Report on Frequency Test of Reinforcing Steel-VGS for CIP Concrete Pile of P48-P49(2nd), Diaphargm Span P27-P28(1st).pdf
7/20/201921762176 SMC4-RP-91 Report on Loading Test of Pier Head's Supporting System at P40.pdf
7/20/201921772177 SMC4-MS-256 MS of Pier Column From P57-P58.pdf
7/20/201921782178 SMC4-LC-675 Acceptance of Substructure Construction stage & Transfer to Constructrion of Superstructure Work for P35.pdf
7/20/201921792179 SMC4-LC-674 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P11.pdf
7/20/201921802180 SMC4-MA-418 Report on Frequency Test of PC Strand for Super T Girder (27th).pdf
7/22/201921812181 SMC4-MA-420 Report on Frequency Test of Reinforcing Steel VGS for CIP Pile P51-P54 (3rd).pdf
7/22/201921822182 SMC4-RP-92 Report on Excavation for Survey of Underground Utilities at P9, P10.pdf
7/22/201921832183 SMC4-MA-417 Report on Frequency Test of Reinforcing Steel VGS for Deck Slab S21, S22.pdf
7/22/201921842184 SMC4-MA-419 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column & Head of P15 (4th) & Diaphragm of Span S20,S23.pdf
7/22/201921852185 SMC4-AD-70 As-built Drawing of CIP Concrete Piling D1.2m of P57(2nd).pdf
7/22/201921862186 SMC4-WD-316 WD for General Arrangment of Traffic Sign for Expressway from Km0+130 - Km0+904.49.pdf
7/22/201921872187 SMC4-WD-317 WD for General Layout of Traffic Sign for Urban Road.pdf
7/22/201921882188 SMC4-MS-257 Supplement & Updating the MS Plan drawing of CIP Concrete Piling from Abutment A1 to P10.pdf
7/22/201921892189 SMC4-MS-258 Calculation of Tendon Cable Elongation for Pier Head P25-P26.pdf
7/22/201921902190 SMC4-LC-676 Report on the Result of P34C Pier Column Surface Repairing.pdf
7/23/201921912191 SMC4-LC-677 Report on the Result of P33 Pier Head Surface Repairing.pdf
7/22/201921922192 SMC4-LC-679 Report on Environment Monitoring in Construction Stage (2nd Phase in July 2019 based on S1.43).pdf
7/22/201921932193 SMC4-LC-678 Updated Environmental Control Plan (2nd).pdf
7/22/201921942194 SMC4-MS-259 Method Statement of Structure Excavation from P46-P56.pdf
7/22/201921952195 SMC4-MS-260 MS of Temporary Facilities Arrangment on Site at P15-P20.pdf
7/24/201921962196 SMC4-WD-318 WD for Basement for Traffic Sign Board at P13.pdf
7/24/201921972197 SMC4-WD-319 WD of General View & Girder Arrangement of Main Bridge & Ramp HQV-B( stage 8).pdf
7/24/201921982198 SMC4-LC-680 Report on the Result of P35 Pier Head Surface Repairing.pdf
7/24/201921992199 SMC4-MS-262 MS of Steel Deck Panel Fabrication of Steel Bridge.pdf
7/24/201922002200 SMC4-MS-261 Document of Relocation & Cutting Tree at Section A1-P16.pdf
7/24/201922012201 SMC4-LC-681 Report on Mobilization of Welding Material.pdf
7/24/201922022202 SMC4-MA-423 Report on Frequency Test of Reinforcing Steel VGS for CIP Concrete Pile of P7-P10.pdf
7/24/201922032203 SMC4-MA-421 Report on Frequency Test of Shape Steel Material of Nippon Steel & Sumitomo Metal Corp. (1st).pdf
7/24/201922042204 SMC4-MA-422 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column & Pier Head of P38(8th)P39,P40(7th), P32(13rd).pdf
7/24/201922052205 SMC4-MA-424 Report on Frequency Test of Welding Material-Welding Wire H14 for Steel Bridge (2nd).pdf
7/24/201922062206 SMC4-LC-682 Result of Ultrasonic Test of CIP Concrete Piles at P56.pdf
7/24/201922072207 SMC4-LC-683 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P35.pdf
7/24/201922082208 SMC4-LC-684 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P57.pdf
7/25/201922092209 SMC4-LC-685 Additional Supervision Cost of Engineer's Staff (May 2019).pdf
7/25/201922102210 SMC4-WD-320 WD of Super T Girder Span S8 (P7-P8).pdf
7/25/201922112211 SMC4-WD-321 WD of Structure Excavation for Section A1, P7-P10.pdf
7/25/201922122212 SMC4-WD-322 WD of General Layout of Parapet (P19-P61).pdf
7/25/201922132213 SMC4-MS-263 MD for Erection of Super T Girder at Spans S36 (P35-P36).pdf
7/25/201922142214 SMC4-MS-264 MS of Diaphragm Construction from Span S32 - Span S36.pdf
7/25/201922152215 SMC4-LC-687 Result of Ultrasonic Test of CIP Concrete Pile at P55.pdf
7/25/201922162216 SMC4-MA-425 Accelerated Weather Resistance Testing Result at 1500Hours of Fluorex Finish Top Coat (Greyt RAL 7035) of Hai Phong Paint JSC.pdf
7/25/201922172217 SMC4-LC-686 Notice for Leave for Our Key Personnel (Project Manager).pdf
7/26/201922182218 2667-PMUTL-DHDA1 Approval of Variation Order No. VO-HRR3-PK1-001A for Additional Tests on CIP Concrete Piles.pdf
7/26/201922192219 SMC4-LC-688 Proposal for Approval of the Contractor's Programme (Rev.2).pdf
7/27/201922202220 SMC4-MS-265 MS of Pile Cap from P46-P56.pdf
7/27/201922212221 SMC4-MS-266 Method Drawing for Erection of Super T Girder at S24(P23-P24).pdf
7/27/201922222222 SMC4-MS-267 Calculation of Tendon Cable Elongation for Pier Head P15.pdf
7/27/201922232223 SMC4-MS-268 MS of Temporary Facilities Arrangement on Site from Abutment A1-P7.pdf
7/27/201922242224 SMC4-WD-323 WD of Column & Pier Head of Pier P43.pdf
7/27/201922252225 SMC4-LC-689 Submission of Weekly Report No.61.pdf
7/27/201922262226 SMC4-LC-690 Submission of Weekly Report No.62.pdf
7/27/201922272227 SMC4-LC-691 Response to the Engineer's Comment Regarding Updated of Construction Method of Pier Head Type based on Actual Site Condition (2nd).pdf
7/29/201922282228 SMC4-AD-71 AD of CIP Concrete Pile D1.2m of P32C.pdf
7/29/201922292229 SMC4-LC-692 Capacity Profile of Nhat Son Quang Co.Ltd for Protection & Relocation of Existing Utilities.pdf
7/29/201922302230 SMC4-WD-324 WD of the Elevation & Thickness of Deck Slab at Span S30 ( P29-P30).pdf
8/8/201922312231 SMC4-LC-693 Re-Checking Result of Girders of S24, S16 & Replacement of Pre Tensioning Pre Stressed Super T Girders of Span S24 by Girders of the Span S16 for Erection.pdf
7/30/201922322232 SMC4-LC-694 Notice of Environmental Monitoring Schedule in August 2019 at Construction Phase.pdf
7/31/201922332233 SMC4-MS-269 Calculation of Tendon Cable Elongation for Pier Head at P40.pdf
7/31/201922342234 SMC4-MS-270 Method Drawing for Erection of Super T Girder at S27(P26-P27) & S26( P25-P26).pdf
7/30/201922352235 Minutes of Meeting dated 4 July ,2019.pdf
7/31/201922362236 SMC4-MS-271 MS for Lower Part of Pier Head from P11-P13.pdf
7/31/201922372237 SMC4-WD-325 WD the Elevation & Thickness of Deck Slab at Span S21(P20-P21).pdf
7/31/201922382238 SMC4-MA-426 Report on Frequency Test of Epoxy Coated PC Strand (6th) of Zhemao Science & Technology Co.LTD Used for Pier Head.pdf
7/31/201922392239 SMC4-MA-427 Report on Frequency Test of Epoxy Coated PC (7th) & Anchorage (4th) of Zhemao Science & Technology Co.LTD used for Pier Head.pdf
7/31/201922402240 SMC4-AD-72 AD of Pre Tensioning Pre Stressed Super T Girder Span 24 ( P23-P24).pdf
7/31/201922412241 SMC4-MA-425A Report on Frequency Test of Welding Material Welding Wire SF71 (3rd).pdf
7/31/201922422242 SMC4-MA-425B Report on Frequency Test of Welding Material Welding Wire SF71 (2nd).pdf
7/31/201922432243 SMC4-MA-428 Trial Mixed Result of Concrete Class B1,C1,C3,C4,D,G &Y at Asean BP( New location).pdf
8/3/201922442244 SMC4-MA-429 Characteristic Strength of Concrete Class C of Transmeco BP- Report No.5( fr 14May-18Jun2019).pdf
8/1/201922452245 SMC4-LC-695 Cost Estimate for Protection & Relocation of Existing Utilities.pdf
8/1/201922462246 SMC4-LC-696 Acceptance Substructure Construction Stage & Transfer to Construction Superstructure Work for P24.pdf
8/1/201922472247 SMC4-LC-697 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work at P32C.pdf
8/1/201922482248 SMC4-LC-698 Additional Information of Subcontractors Engaged in the Project.pdf
8/7/201922492249 SMC4-MA-425C Report on Test Result of Shear Stud for Steel Bridge.pdf
8/1/201922502250 SMC4-MS-272 Supplement Method Drawing for Erection of Super T Girder at S36 (P35-P36).pdf
8/3/201922512251 SMC4-MA-430 Material Standards for Bolt, Nut & Washer Used for Deck Slab.pdf
8/3/201922522252 SMC4-LC-699 Report on Environmennt Monitoring in Construction Stage (3rd Phase in July based on S1.43)).pdf
8/3/201922532253 SMC4-MA-431 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap,Pier Column & Pier Head of P32(14th) & Diaphragm of Span S33-S36.pdf
8/3/201922542254 SMC4-LC-700 Submission of Construction Schedule of Aug 2019.pdf
8/3/201922552255 SMC4-RP-93 Report on Excavation for Survey of Underground Utilities at P50 (2nd).pdf
8/3/201922562256 SMC4-MA-429A Report on Frequency Test of Epoxy Coated PC Strand (8th) of Zhemao S&T Co.LTD used for Pier Head.pdf
8/3/201922572257 SMC4-MA-429B Report on Frequency Test of PC Strand for Super T Girder (28th).pdf
8/3/201922582258 SMC4-MA-432 Report on Frequency Test of Reinforcing Steel VGS for CIP Pile P50 (1st), P23-P28(2nd), Deck Plate P23-P28 (1st).pdf
8/3/201922592259 SMC4-MA-433 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column of P46, P47(1st).pdf
8/3/201922602260 SMC4-MA-434 Submission of Manufacturer & Supplier of Bridge Expansion Joints.pdf
8/3/201922612261 SMC4-WD-326 WD of Super T Girder Span S7 ( A1-P7).pdf
8/5/201922622262 SMC4-WD-327 WD of Elastomeric Bearing (A1-P15).pdf
8/5/201922632263 SMC4-WD-328 WD of Deck Slab Spans 23, 24, 27, 28.pdf
8/5/201922642264 SMC4-MS-273 MS for Lower Part of Pier Head P57-P58.pdf
8/5/201922652265 SMC4-MS-274 MS of Pier Column P46-P56.pdf
8/6/201922662266 SMC4-MS-275 MS of Traffic Control for Public Road at Section A1-P24- Volumn VII- Ajusted Arrangement Traffic Control at Section A1-P24.pdf
8/5/201922672267 SMC4-MA-435 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap,Pier Column & Pier Head of P38(9th),P39-P40 (8th)& Diaphragm of Span P36-P40 (1st).pdf
8/5/201922682268 SMC4-LC-702 Weekly Report No.63.pdf
8/5/201922692269 SMC4-LC-701 Changing Thickness of Bituminous Membrane on Anchor Block of P16, P19.pdf
8/7/201922702270 SMC4-LC-703 Proposal for Approval of Manpower Mobilization Document for Deck Slab Construction Work under Scope of Co. 414.pdf
8/7/201922712271 SMC4-LC-704 Proposal for Approval Manpower Mobilization Document for Super T Girder Fabrication under Scope of Co.414.pdf
8/7/201922722272 SMC4-LC-705 Proposal for Approval of Asphalt Concrete BP of 656 Co.LTD.pdf
8/7/201922732273 SMC4-MS-276 MS of Steel Deck Panel Fabrication of Steel Bridge (2nd).pdf
8/7/201922742274 SMC4-MS-277 Adjusted Plan for Reconnect Culvert Pipe D1250 of Ministry of Police Public (4th).pdf
8/7/201922752275 SMC4-MA-425D Test Result of Bolt Material for Steel Bridge S10T M22x100 ( including Nut & Washer).pdf
8/8/201922762276 SMC4-MA-436 Report on Frequency Test of Material for Cement Concrete of Asean BP (18th and 19th).pdf
8/7/201922772277 SMC4-WD-329 WD of Details of Steel Girder Segment 12 (1st).pdf
8/8/201922782278 SMC4-LC-706 Top Elevation of Bearing Pad in Accordance with Actual Camber of Super T Girder at Span S16, S26, S27.pdf
8/8/201922792279 SMC4-LC-707 Result of Ultrasonic Test of CIP Concrete Pile at P54.pdf
8/8/201922802280 SMC4-MA-435A Testing Result of Welding Procedure of Stud Shear Connector.pdf
8/8/201922812281 SMC4-MA-437 Accelerated Weather Resistance Testing Result at 2000 Hours of Fluorex Finish Top Coat( Grey RAL 7035) of Hai Phong Paint JSC.pdf
8/8/201922822282 SMC4-WD-330 WD of Substruture-Center Column &Lower Part of Pier P32C (2nd).pdf
8/8/201922832283 SMC4-MA-439 Characteristic Strength for Concrete Class Y of Transmeco BP -RP No.5(4Jun-21Jun2019).pdf
8/7/201922842284 2811 PMUTL-DA1 Inspection and Verification of Management of construction solid waste.pdf
8/8/201922852285 SMC4-AD-73 As-Built Drawing of Pre Tensioning Pre Stressed Super T Girder of Span 26 (P25-P26).pdf
8/8/201922862286 SMC4-AD-74 As-Built Drawing of Pre Tensioning Pre Stressed Super T Girder Span 25 (P24-P25).pdf
8/8/201922872287 SMC4-AD-75 As-Built Drawing of Pre Tensioning Pre Stressed Super T Girder Span 27 (P26-P27).pdf
8/8/201922882288 SMC4-LC-708 Weekly Report No.64.pdf
8/8/201922892289 SMC4-LC-709 Monthly Report No.15.pdf
8/8/201922902290 SMC4-MA-438 Trial Mix Result of Concrete Class A(Ver.2-Cement 525kg), C1, C3, C4& Class Y at Viet Tiep BP (New Location).pdf
8/10/201922912291 SMC4-WD-331 WD of CIP Concrete Pile for P44.pdf
8/10/201922922292 SMC4-WD-332 WD of CIP Concrete Pile for P45 (2nd).pdf
8/10/201922932293 SMC4-LC-711 Report on Steel Bridge Processing Work & Proposal Drilling Hole for Botton Splice Plates before Pre Assembly.pdf
8/10/201922942294 SMC4-LC-710 Engineer's Confirmation for Safety & Environment Satisfaction (01Jul to 31Jul2019).pdf
8/10/201922952295 SMC4-MA-441 Test Result of Jack, Anchorage & Synchronous Experiment of Jack, PC Strand, Anchoage for Construction Super T Girder(5th).pdf
8/10/201922962296 SMC4-MA-442 Report on Frequency Test of Cement, Coarse Aggregate for Class A at Viet Tiep BP Plant ( New Location) (8th) & Updated Testing Result on Cement for Cement Concrete at Viet Tiep BP (6th).pdf
8/10/201922972297 SMC4-MA-434A Report on Frequency Test of Reinforcing Steel VGS forCIP Concrete Pile of Section A1-P10 (2nd).pdf
8/13/201922982298 SMC4-MA-443 Characteristic Strength for Concrete Class B of Transmeco BP Plant-RP No.1(fr 14Jan to 01Jun2019).pdf
8/10/201922992299 SMC4-MA-444 Cement Concrete at Transmeco BP (33rd, 34th) & Update Testing Results on Cement for CC at Transmeco BP( 28th,29th&31th).pdf
8/10/201923002300 SMC4-MA-445 Report on Frequency Test of Reinforcing Steel VIS Steel Bar for Super T Girder of Span S11, S12.pdf
8/10/201923012301 SMC4-MC-16 Interim Payment Certificate No.13 ( Period 01Jul to 31Jul2019).pdf
8/12/201923022302 SMC4-MA-440 Report on Frequency Test of Reinforcing Steel - VGS for Pier Column & Pier Head of Pier P11, P12, P13.pdf
8/12/201923032303 SMC4-MA-446 Report on Frequency Test of Reinforcing Steel - VGS for Pile cap, Pier Column & Pier Head of Pier P53, P54, P55, P56 (1st).pdf
8/12/201923042304 SMC4-MA-447 Submision of the Characteristic Strength for Concrete Class A of Viet Tiep BP (New Location) - Report No.1 (from 11Jun to 02Jul2019).pdf
8/12/201923052305 SMC4-RP-94 Topographic Survey Report at Section from Km2+160 to Km2+220.pdf
8/12/201923062306 SMC4-RP-95 Report on Excavation for Survey of Underground Utilities at P48, P49 (2nd).pdf
9/10/201923072307 SMC4-RP-96 Report on Excavation for Survey of Underground Utilities at P41R, P42R.pdf
8/12/201923082308 SMC4-WD-333 Working Drawing the Elevation & Thickness of Deck Slab at Span S22(P21-P22), S29(P28-P29).pdf
8/12/201923092309 SMC4-WD-334 Working Drawings of General Dimension of Steel Girder (1st Revision).pdf
8/12/201923102310 SMC4-WD-335 Working Drawings of Painting of Exterior Super T Girder from Spans 10-16 and 20-38 (1st Revision).pdf
8/12/201923112311 SMC4-WD-336 Working Drawings of Substructure - Pier P51 (2nd).pdf
8/12/201923122312 SMC4-WD-337 Working Drawings of Substructure - Pier P52 (2nd).pdf
8/12/201923132313 SMC4-WD-338 Working Drawings of Substructure - Pier P54 (2nd).pdf
8/12/201923142314 SMC4-LC-714 The Sequence for the Construction of Superstructure.pdf
8/12/201923152315 SMC4-MA-420A Notice of Vietnam Germany Steel Transfer for Bored Piles of Pier P48,P49 will be Used for Bored Piles of Pier 50.pdf
8/13/201923162316 SMC4-MA-448 Removal of Welding Wire SF71 Lot Numer MF9747E1 (15255 kg) out of Factory of Thanh Long JSC.pdf
9/7/201923172317 SMC4-WD-340 WD for General Layout of Traffic Sign for Urban Road (2nd).pdf
8/23/201923182318 SMC4-WD-339 WD for General Arrangement of Traffic Sign for Expressway from Km0+130 - Km0+904.49 (2nd).pdf
8/13/201923192319 SMC4-LC-715 Change Position of Steel Bar U160x56x5.2 of Anti Glare Fence on the Concrete Parapet.pdf
8/13/201923202320 SMC4-LC-712 Additional Manpower Mobilization Document for Super T Girder Fabrication under Scope of Co.414.pdf
8/13/201923212321 SMC4-LC-713 Additional Mobilization for Additional Welders for Steel Bridge of Subcontractor Thanh Long Group JSC (6th).pdf
8/14/201923222322 SMC4-LC-716 Result of Ultrasonic Test of CIP Concrete Piles at P46.pdf
8/14/201923232323 SMC4-LC-717 Result of Ultrasonic Test of CIP Concrete Piles at P52.pdf
8/14/201923242324 SMC4-WD-341 WD of Substructure - Pier Head P46(1st).pdf
8/14/201923252325 SMC4-WD-342 WD of Painting of Exterior Super T Girder from Spans S7-S9 & S39-S61(1st).pdf
8/14/201923262326 SMC4-WD-343 WD of Substructure - Pier Head P47 (1st).pdf
8/14/201923272327 SMC4-WD-344 WD of Substructure - Pier Head P58 (1st).pdf
8/14/201923282328 SMC4-WD-345 WD of Substructure - Pier Head P59 (1st).pdf
8/14/201923292329 SMC4-WD-346 WD of Substructure -Pier Head P60 (1st).pdf
8/14/201923302330 SMC4-AD-76 AD of CIP Concrete Piling D1.2m of P46.pdf
8/14/201923312331 SMC4-MS-278 Report for Loading Test of Ground at Pre-Assembly Area of Thanh Long Factory.pdf
8/14/201923322332 SMC4-RP-97 Report on Excavation for Survey of Underground Utilities at P7, P8.pdf
8/15/201923332333 SMC4-LC-716 Withdrawal of the letter SMC4-MA-0434A dated 3 Aug 2019.pdf
8/15/201923342334 SMC4-MA-449 Report on Frequency Test of Reinforcing Steel-VGS for Pile Cap, Pier Column & Pier Head of P46-P49(2nd), CIP Concrete Pile of P44,P45 (1st) & P48,P49(3rd), Link Slab of P23-P28.pdf
8/15/201923352335 SMC4-LC-717A Result of Ultrasonic Test of CIP Concrete Piles at P47.pdf
8/15/201923362336 SMC4-LC-718 Withdrawal of the letter SMC4-RP-0094 dated 10 Aug 2019.pdf
8/15/201923372337 SMC4-MA-450 Notification of Transfer of VGS Used for Construction of CIP Concrete Piles at P50 for the Construction CIP Concrete Piles at P48, P49.pdf
8/15/201923382338 SMC4-MA-451 Notification on Transferring of VGS Used for Construction of CIP Concrete Pile at P51-P54 (1st)(3rd) for CIP Concrete Piles P41-P43.pdf
8/15/201923392339 SMC4-LC-719 Reply the Engineers Letter Regarding the Contractor's Programme (Rev.2).pdf
8/15/201923402340 SMC4-WD-347 WD of Detail of Expansion Joint (for Main Bridge).pdf
8/19/201923412341 SMC4-MS-277A MS for Construction of Pier Head & Outling of the Loading Test of Pier Head's Supporting System at P59-P60 & P14.pdf
8/16/201923422342 SMC4-LC-720 Report on Installation of Safety Breakers for Protecting Electrical Accident.pdf
8/16/201923432343 SMC4-LC-721 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work at P46.pdf
8/15/201923442344 SMC4-LC-722 Additional Supervision Cost of Engineer's Staff in June 2019.pdf
8/15/201923452345 SMC4-LC-723 Withdrawal of the Letter LC-0719 dated 14Aug2019.pdf
8/15/201923462346 SMC4-MS-279 Storing Plan for Super T Girder 34.3m Type at Fabrication Yard of Group 2.pdf
8/16/201923472347 SMC4-LC-724 Claim for the Extention of Time for Completion & Proposal for Revised Overall Construction Schedule (Rev.2).pdf
8/15/201923482348 SMC4-WD-348 WD of Superstructure - Deck Slab of Span S34, S35 & Link Slab at P33-P35(2nd).pdf
8/15/201923492349 SMC4-WD-349 WD of Substructure - Pier Head P55 (1st Rev).pdf
8/15/201923502350 SMC4-WD-350 WD of DSubstructure- Pier P10 (1st).pdf
8/15/201923512351 SMC4-WD-351 WD of Substructure - Pier Head P57 (1st Rev).pdf
8/15/201923522352 SMC4-WD-352 WD of Substructure - Pier Head P56 (1st Rev).pdf
8/16/201923532353 SMC4-LC-726 Result of Tip Contact Checking Test of CIP Concrete Pile C6-P54.pdf
8/16/201923542354 SMC4-LC-725 Report on Environment Monitoring in Construction Stage (1st Phase in Aug 2019 based on S1.43).pdf
8/16/201923552355 SMC4-RP-98 Topographic Survey Report at Section from Km2+150-Km2+225.pdf
8/17/201923562356 SMC4-LC-729 Withdrawal of the Letter SMC4-MA-0444-19 dated 9Aug19.pdf
8/19/201923572357 SMC4-LC-727 Acceptance of Sub Structure Construction Stage & Transfer to Construction of SuperStructure Work for P26.pdf
8/19/201923582358 SMC4-LC-728 Submission of Weekly Report No.65.pdf
8/19/201923592359 SMC4-LC-730 Result of Ultrasonic Test of CIP Concrete Piles at P51.pdf
8/19/201923602360 SMC4-WD-353 WD of Addition CIP Concrete Pile of Pier P43C (1st).pdf
8/19/201923612361 SMC4-MS-280 Supplement the Method Drawing for Erection of Super T Girder at Spans S25(P24-P25) & S26(P25-P26).pdf
8/19/201923622362 SMC4-MA-452 Report on Frequency Test of Reinforcing Steel VGS for Link Slab& Pile Cap Pier Column of P53-P56.pdf
8/19/201923632363 SMC4-MA-453 Report on Frequency Test of Reinforcing Steel VGS for CIP Concrete Pile of A1-P10.pdf
8/19/201923642364 SMC4-MA-454 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column Pier Head of P50-P52 & Deck Slab S33-S36.pdf
8/19/201923652365 SMC4-MA-455 Report on Frequency Test of Reinforcing Steel VGS for Super T Girder of Span S40, S41.pdf
8/19/201923662366 SMC4-MA-456 Report on Frequency Test of Reinforcing Steel VGS for Concrete Pile of Section A1-P10,Pile Cap, Pier Column Pier Head P14,Link Slab at P21,P22.pdf
8/19/201923672367 SMC4-MA-457 Report of Frequency Test of Reinforcing Steel VGS for Pile Cap,Pier Column of P46, 47.pdf
8/19/201923682368 SMC4-AD-77 AD of CIP Concrete Pilling S1.2m off Pier P56.pdf
8/19/201923692369 SMC4-MA-399A Report on Frequency Test of Elastomeric Bearing Manufactured by Kawakin and supplied by THQ (2nd).pdf
8/19/201923702370 SMC4-MA-425E Report on Frequency Test of Reinforcing Steel VGS for CIP Crete Pile of Section A1-P10 (2nd).pdf
8/19/201923712371 SMC4-MA-447A Report on Frequency Test of Elastomeric Bearing Manufactured by Kawakin & Supplied by THQ (3rd).pdf
8/19/201923722372 SMC4-MA-458 Report on Frequency Test of Reinforcing Steel VGS for CIP Concrete Pile P41-P43.pdf
8/19/201923732373 SMC4-MA-459 Mix Proportion for Trial Mix Class C2 at Viet Tiep BP & Transmeco BP.pdf
8/19/201923742374 SMC4-WD-354 WD of Superstructure - Deck Slab for Spans S36-S37 (1st).pdf
8/20/201923752375 SMC4-LC-732 Acceptance of CIP Concrete Pile Foundation Construction Stage & Tranfer to Construction of Substructure Work for P56.pdf
8/21/201923762376 SMC4-RP-99 Report on Loading Test of Pier Head's Supporting System at P59.pdf
8/21/201923772377 SMC4-RP-100 Report on Loading Test of Pier Head's Supporting System at P38.pdf
8/21/201923782378 SMC4-LC-733 Changing Rebar of Deck Slab in the Area Near the Expansion Joint.pdf
8/21/201923792379 SMC4-LC-734 Manpower Mobilization Document for Deck Slab Construction Work Under Scope of Co.423.pdf
8/22/201923802380 SMC4-MS-281 Method Statement of Pier Head from P11-P13.pdf
8/21/201923812381 SMC4-MS-282 Outline for Loading Test of Pier Head's Supporting System at P12, P13.pdf
8/21/201923822382 SMC4-WD-355 WD of Superstructure - Deck Slab for Spans S23, S24, S27, S28 (2nd).pdf
8/21/201923832383 SMC4-WD-356 WD of Substructure - Pier P49 (2nd).pdf
8/21/201923842384 SMC4-WD-357 WD of Substructure - Pier P48 (2nd).pdf
8/23/201923852385 SMC4-MA-460 Report of Frequency Test of Epoxy Coated PC Strand (9th) of Zhemao Co.Ltd used for Pier Head.pdf
8/23/201923862386 SMC4-WD-359 WD of Substructure Pier P53 (2nd).pdf
8/23/201923872387 SMC4-WD-358 WD of Substructure Pier P50 (2nd).pdf
8/22/201923882388 SMC4-MA-461 Report on Frequency Test of Reinforcing Steel VGS for CIP Concrete Pile of P44,P45 & P48,P49 & Deck Slab of P23-P28.pdf
8/22/201923892389 SMC4-MA-462 Report of Frequency Test of Reinforcing Steel VGS for Super T Girder of Span S47, S48.pdf
8/22/201923902390 SMC4-LC-735 Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P25.pdf
8/23/201923912391 SMC4-LC-736 Result of Tip Contact Checking Test of CIP Concrete Pile C3-P51.pdf
8/23/201923922392 SMC4-MA-464 Report on Frequency Test of Cement, Coarse Aggregate, Fine Aggregate, Admixture & Water of Transmeco BP 33rd-37th, Updated Testing Result 28th,29th,31th....pdf
8/23/201923932393 SMC4-MA-463 Material Source & Job-Mix Formula of Dense Asphalt Concrete C19 at 703 Asphalt BP of PK2 used for Asphalt Concrete BP of 656 CoLtd of PK1.pdf
8/23/201923942394 SMC4-MA-460A Report on Frequency Test of PC Strand of Super T Girder (29th).pdf
8/23/201923952395 SMC4-LC-737 Submission of Weekly Report No.66.pdf
8/23/201923962396 SMC4-MA- 465 Result on Test Result of Pot Bearing Manufactured by Kwang Won Co.,Ltd & Supplied by Transport Materials Equipment JSC.pdf
8/26/201923972397 SMC4-MA-466 Report on Frequency Test of VGS Pile Cap, Pier Column Pier Head of P50, P52, P32,Pier Head of P32, Deck Slab S33-36.pdf
8/26/201923982398 SMC4-AD-78 AD of CIP Concrete Piling D1.2m of P47.pdf
8/26/201923992399 SMC4-MA-468 Report on Frequency Test of Cement, Coarse Aggregate for Class A, Coarse cement concrete of Viet Tiep.pdf
8/26/201924002400 SMC4-MS-284 MS of Structure Excavation from A1-P10.pdf
8/26/201924012401 SMC4-MS-285 Calculation for Pre-Stressing of Super T Girder 34.3m of Group 2 Co.407.pdf
9/10/201924022402 SMC4-RP-101 Report on Excavation for Survey of Underground Ultilites at P43R.pdf
8/26/201924032403 SMC4-WD-360 WD of the Elevation & Thickness of Deck Slab S23(P22-P23), S28(P27-P28).pdf
8/26/201924042404 SMC4-WD-361 WD of Substructure CIP Concrete Pile for P32R, P32L (2nd).pdf
8/26/201924052405 SMC4-WD-362 WD of Substructure - Pile Cap of Abutment A1.pdf
8/26/201924062406 SMC4-LC-738 Report on Environment Monitoring in Construction Stage (2nd Phase in Aug 2019 based on S1.43).pdf
8/26/201924072407 SMC4-MA-467 Report on Frequency Test of PC Strand for Super T Girder (30th).pdf
8/26/201924082408 SMC4-MS-283 MS of A1 Abutment's Pile Cap.pdf
8/26/201924092409 SMC4-LC-739 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P47.pdf
8/27/201924102410 SMC4-AD-79 AD of CIP Concrete Pile D1.2m of P54.pdf
8/27/201924112411 SMC4-MA-469 Report on Frequency Test of Reiforcing Steel VGS for Pile Cap, Pier Column of P54.pdf
8/27/201924122412 SMC4-MA-470 Report on Frequency Test of Reinforcing Steel VGS for Link Slab P28, P29, Deck Slab of S29.pdf
8/27/201924132413 SMC4-MA-471 Notice on Transferring a Part of VGS Used for Bored Pile of P50-P52 to Bored Pile of P47.pdf
8/29/201924142414 SMC4-RP-102 Report of Excavation for Survey of Underground Utilities at P43L.pdf
8/29/201924152415 SMC4-WD-363 WD of Relocation of Project Information Sign to P17-P18.pdf
8/29/201924162416 SMC4-WD-364 WD of Pile Cap of P43 (2nd).pdf
8/29/201924172417 SMC4-WD-366 WD of Superstructure- Deck Slab for Span S20 & Link Slab at Pier P20 (1st).pdf
8/29/201924182418 SMC4-WD-365 WD of Pot Bearing at Piers P16 & P19 (1st).pdf
8/28/201924192419 SMC4-LC-740 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P54.pdf
8/29/201924202420 SMC4-LC-741 Notification on Persons in Charge of Traffic Control P15, P16, P24.pdf
8/30/201924212421 SMC4-LC-742 Reply to the Engineer's Letter No.HCRR RE1-1510-1.29 Regarding Construction Progress for Main Structure Items-August 2019.pdf
8/30/201924222422 SMC4-LC-743 Result of Ultrasonic Test of Cast in Place Concrete Piles at P9.pdf
8/30/201924232423 SMC4-LC-744 Result of Ultrasonic Test of Cast in Place Concrete Piles at P10.pdf
8/30/201924242424 SMC4-LC-745 Notice of Environmental Monitoring Schedule in Sep2019 at Construction Phase.pdf
8/30/201924252425 SMC4-LC-746 Manpower Mobilization Document for Deck Slab Construction Work from P31 to P36 under Scope of 422 Co..pdf
8/30/201924262426 SMC4-LC-747 Manpower Mobilization Document of Subcontractor Vietbuilt Construction & Trading JSC for Safety Work.pdf
8/30/201924272427 SMC4-MS-103 Report on Excavation for Survey of Underground Ultilities at P44,P45.pdf
8/30/201924282428 SMC4-MS-286 Calculation of Tendon Cable Elongation for Pier Head at P38.pdf
8/30/201924292429 SMC4-MA-472 Capacity Profile of Manufacturer and Supplier for Bolts, Nut and Stud Bolt for Steel Bridge.pdf
8/30/201924302430 SMC4-LT-26 Capacity Profile of Laboratory LAS-XD 1133 of Institute for Building Material.pdf
8/30/201924312431 SMC4-AD-80 AD of Cast in Place Concrete Piling D1.2m of Pier P52.pdf
8/31/201924322432 SMC4-MA-474 Frequency Test of Reinforcing Steel VGS for Bore Pile A1, P7-P10, Pile Cap, Pier Column, Pier Head of P9-P13.pdf
8/31/201924332433 SMC4-LC-739A Report on Casting Concrete Phenomenon of CIP Concrete Pilling at No.9 P49.pdf
8/31/201924342434 SMC4-MA-473 Report on Frequency Test of Epoxy Coated PC Strand (10th) of Zhemao S & T Co.Ltd used for Pier Head.pdf
8/31/201924352435 SMC4-LC-748 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P52.pdf
8/31/201924362436 SMC4-LC-749 Submission of Weekly Report No.67.pdf
8/31/201924372437 SMC4-LC-750 Result of Tip Contact Checking Test of CIP Concrete Pile C4-P10.pdf
8/31/201924382438 SMC4-MA-475 Report on Frequency Test of Welding Material -Welding Wire SF71 (4th).pdf
8/31/201924392439 SMC4-MA-476 Report on Frequency Test of Posco Steel Plate Material (Filter Plate) for Steel Bridge.pdf
8/31/201924402440 SMC4-MA-477 Capacity Profile of Manufacturer & Supplier of Drainage Pipe Material (2nd).pdf
8/31/201924412441 SMC4-WD-367 WD of Superstructure- Deck Slab for Spans S38, 39 & Link Slab at P37-P39 (2nd).pdf
8/31/201924422442 SMC4-WD-368 WD of Substructure Pier P9 (1st).pdf
9/3/201924432443 SMC4-WD-369 WD of Backfill for Section A1-P10 (1st).pdf
9/3/201924442444 SMC4-MA-478 Proposal for Approval of 703 Asphalt Batching Plant of PK2 used for PK1.pdf
9/3/201924452445 SMC4-MA-479 Report on Frequency Test of Reinforcing Steel - VGS for Pile Cap, Pier Column of P46 & P47 , CIP Concrete Pile of P44, P45; Diaphgragm Span S25,S26,S27, Deck Slab S27.pdf
9/4/201924462446 SMC4-MS-287 Calculation of Tendon Cable Elongation for Pier Head P59-P60.pdf
9/3/201924472447 SMC4-MS-288 MS for Lower Part of Pier Head from P46-P56.pdf
9/3/201924482448 SMC4-MS-289 MS for Construction of Pier Head & Outline of the Loading Test of Pier Head's Supporting System from P57 to P58.pdf
9/3/201924492449 SMC4-MA-480 Using Cao Duong Quarry, Cao Duong Commune, Luong Son District, Hoa Binh Province Exploited by Hien Luong Mineral Exploitation & Processing Co., Ltd & Supplied by 28-10 Thang Long.pdf
9/3/201924502450 SMC4-MA-481 Report on Frequency Test of Reinforcing Steel - VGS for Deck Slab & Link Slab S20-S23.pdf
9/3/201924512451 SMC4-MS-290 Method Statement of Pile Cap from P7-P10.pdf
9/4/201924522452 SMC4-WD-370 WD of General Layout of Parapet & Median Barrier for Main Bridge (2nd).pdf
9/4/201924532453 SMC4-MA-482 Report on Frequency Test of Painting Material for Steel Bridge (1st) of Hai Phong Paint JSC for Steel Bridge.pdf
9/4/201924542454 SMC4-AD-81 As Built Drawings of CIP Concrete Piling D1.2m of P55.pdf
9/4/201924552455 SMC4-LC-751 Report on Environment Monitoring in Construction Stage (3rd Phase in Aug 2019 Based on S1.43).pdf
9/6/201924562456 SMC4-LP-49 Report on Mobilization of Pile Machine T-Works to the Site & Placed at the U-Turn Point P15-P16 by the Contractor of Widening Project.pdf
9/6/201924572457 SMC4-MA-483 Additional Capacity Profile of Asphalt Concrete BP of Co.656.pdf
9/6/201924582458 SMC4-MA-484 Characteristic Strength for Concrete Class Y of Transmeco - RP No.6 (from 28Jun to 31Jul2019).pdf
9/6/201924592459 SMC4-MA-485 Characteristic Strength for Concrete Class A of Viet Tiep BP - RP.2 (from 2Jul to 31Jul2019).pdf
9/6/201924602460 SMC4-MA-486 Characteristic Strength for Concrete Class C of Transmeco BP- RP No.6 (from 22Jun to 31Jul2019).pdf
9/6/201924612461 SMC4-LC-754 Break Down of Cost for Structure Excavation Item.pdf
9/6/201924622462 SMC4-LC-753 Submission of Weekly Report No.68.pdf
9/10/201924632463 SMC4-MS-291 Plan of Cutting & Pruning Tree from Abutment A1-P16.pdf
9/6/201924642464 SMC4-LC-752 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P55.pdf
9/6/201924652465 3123 PMUTL-DHDA1 Implementation of Conclusions by Minister Nguyen Van The.pdf
9/7/201924662466 SMC4-WD-369A WD of Elevation& Thickness of Deck Slab at Span S35(P34-P35).pdf
9/7/201924672467 SMC4-MA- 487 Report on Frequency Test of Reinforcing Steel VIS Bar for Super T Girder S47, S48.pdf
9/9/201924682468 SMC4-MA-488 Frequency Test of Materials for Cement Concrete at Viet Tiep BP (11th& 12th) & Updated (8th).pdf
9/9/201924692469 SMC4-MA-489 Report on Frequency Test of Manterial for Cement Concrete at Transmeco BP(38th & 39th).pdf
9/10/201924702470 SMC4-MA-490 Report on Frequency Test of Materials for Cement Concrete at Asean BP(20th) & Updated (17th to 19th).pdf
9/7/201924712471 SMC4-MA-491 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column,Pier Head of P39, Deck Slab S37-S41.pdf
9/7/201924722472 SMC4-MA-492 Report on Frequency Test of Reinforcing Steel VGS for Pier Head of P57, P58.pdf
9/7/201924732473 SMC4-MA-493 Report on Frequency Test of Reinforcing Steel VGS for Precast Panel of Super T Girder.pdf
9/7/201924742474 SMC4-MS-290A MS of Deck Slab Construction from P32-P40.pdf
9/7/201924752475 SMC4-MS-290B Method Drawing of Pier Column Construction at P55-P56.pdf
9/7/201924762476 SMC4-LC-755 Cost Estimate for Protection & Relocation of Existing Utilities (2nd).pdf
9/7/201924772477 SMC4-LC-756 Updated Quality Control Plan (3rd).pdf
9/7/201924782478 SMC4-LC-757 Additional Supervision Cost of Engineers Staff (July 19).pdf
9/7/201924792479 SMC4-MS-290C Method Drawing of Pier Head & Loading Test of Pier Head's Supporting System at P39.pdf
9/9/201924802480 SMC4-LP-50 VAT Invoices for Interim Payment Certificate No.09 of PK1.pdf
9/9/201924812481 SMC4-LP-51 VAT Invoices for Interim Payment Certificate No.10 of PK1.pdf
9/9/201924822482 SMC4-LP-52 VAT Invoices for Interim Payment Certificate No.11 of PK1.pdf
9/9/201924832483 SMC4-LP-53 VAT Invoices for Interim Payment Certificate No.12 PK1.pdf
9/9/201924842484 SMC4-LC-758 Reply to the Engineer's Letter No ENG-PK1-0974-1.27 dated 31Aug2019 Regarding Reminder on Submission of Outstanding Document.pdf
9/9/201924852485 SMC4-MS-292 Permission for Circulation of Vehicles to Transport Overlength Cargo on Road ( Transportation of Steel Girder & Steel Pier Head).pdf
9/9/201924862486 SMC4-WD-371 WD of Superstructure-Deck Slab for Spans 40 & 41.pdf
9/10/201924872487 SMC4-LC-759 Changing Method Statement of Drilling Hole Splice Plates before Pre Assembly.pdf
9/11/201924882488 SMC4-RP-104 Report on Excavation for Survey Underground Utilities at P53.pdf
9/10/201924892489 SMC4-AD-82 AD of CIP Concrete Pile D1.2m of P10.pdf
9/10/201924902490 SMC4-LC-760 Construction Schedule of Sep. 2019.pdf
9/10/201924912491 SMC4-LC-761 Result of Ultrasonic Test of CIP Concrete Pile at P42R.pdf
9/10/201924922492 SMC4-LC-762 Result of Ultrasonic Test of CIP Concrete Pile at P41R.pdf
9/14/201924932493 SMC4-MA-494 Report on Frequency Test of PC Trand for Super T Girder (31st).pdf
9/14/201924942494 SMC4-MA-495 Report on Frequency Test of PC Strand for Super T Girder (32rd).pdf
9/23/201924952495 SMC4-MA-496 Frequency Test of Posco Steel Plate for Steel Bridge (3rd).pdf
9/23/201924962496 SMC4-MA-497 Frequency Test of Posco Steel Plate for Steel Bridge (4th).pdf
9/10/201924972497 350 GM-SGTVT Invitation date 11.9.19.pdf
9/12/201924982498 SMC4-MA-498 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap P48, P49 ( M& T 3Sep19).pdf
9/12/201924992499 SMC4-MA-499 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column, Pier Head P50-P52,Pile Cap, Pier Column Pier Head P32, P9, P10(M&t 04Sep19).pdf
9/12/201925002500 SMC4-MA-500 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column,Pier Head P14-Pile Cap, Pier Column, PierHead P44, P45 (M&T 07Sep19).pdf
9/12/201925012501 SMC4-LT-27 Inspection Minutes of Lab LAS-XD 1133 of Institute for Building Material.pdf
9/12/201925022502 SMC4-MS-293 MS of Erection for Pier Head P17, P18.pdf
9/12/201925032503 SMC4-LC-766 Submission of Monthly Report No.16.pdf
9/12/201925042504 SMC4-LC-765 Engineer's Confirmation for Safety & Environment Satisfaction (1-31Aug 2019).pdf
9/12/201925052505 SMC4-LC-764 Change the Type of Rebar for Lifting Hook of Rebar Cage of Bored Pile.pdf
9/12/201925062506 SMC4-LC-763 Acceptance of CIP Concrete Pile Foundation Construction & Transfer to Substructure for P10.pdf
9/11/201925072507 3175 TB-BQLDATL Notice on Conclusions given by PMU in the Meeting to review the Implementation.pdf
9/12/201925082508 SMC4-RP-105 RP on Excavation for Survey of Underground Utilities at Abutment A1.pdf
9/13/201925092509 SMC4-MA-501Report on Frequency Test of Reinforcing Steel VIS for Super T Girder of S9, S10.pdf
9/13/201925102510 SMC4-MA-502 Report on Frequency Test of Reinforcing Steel VIS for CIP Concrete Pile at A1.pdf
9/13/201925112511 SMC4-MA-503 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap,Pier Column of P48, P49.pdf
9/12/201925122512 SMC4-LC-768 Installation of Crack Induction Joint to Abutment A1.pdf
9/12/201925132513 SMC4-AD-83 AD of Pre-tensioning Pre-stressed Super T Girder os Span 16 (P15-P16).pdf
9/12/201925142514 SMC4-AD-84 AD of Cast in Place Concrete Piling D1.2m of Pier P51.pdf
9/13/201925152515 SMC4-LC-767 Claim for Extention of Time for Completion of Works & Revised Overal Construction Schedule of the Project (Revision Version).pdf
9/13/201925162516 SMC4-LC-769 Subcontracts Agreement for Protection & Relocation of Existing Utilities Item.pdf
9/13/201925172517 SMC4-LC-770 Contractor for Design Modification of Relocation of Abutment A1.pdf
9/14/201925182518 SMC4-LC-771 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Substructure Work for P51.pdf
9/14/201925192519 SMC4-LC-772 Summary Table of Waste Disposal Implement by the Subcontractors at Nguyen Khe Disposal Area from Apr to Jun 19.pdf
9/14/201925202520 SMC4-LC-773 Report on Environmental Monitoring in Construction Stage (1st Phase in Sep 19 based on S1.43).pdf
9/20/201925212521 SMC4-MS-294 Calculation of Tendon Cable Elongation for Pier Heads P11-P13.pdf
9/16/201925222522 SMC4-MS-295 Method Drawing for Erection of Super T Girder at Span S16 (P15-P16).pdf
9/14/201925232523 SMC4-AD-85 AD of CIP Concrete Piling D1.2m of Pier P41R.pdf
9/16/201925242524 SMC4-LC-775 Manpower Mobilization Document for Deck Slab Construction Work Under Scope Co.414.pdf
9/16/201925252525 SMC4-LC-776 Submission of Weekly Report No.69.pdf
9/14/201925262526 SMC4-LC-774 Notice of Claim on Unforeseeable Physical Conditions Found by Constructor during Construction of A1.pdf
9/16/201925272527 SMC4-WD-372 WD of Elevation & Thickness of Deck Slab at Span S27 (P26-P27).pdf
9/16/201925282528 SMC4-RP-106 Report on Loading Test of Pier Head's Supporting System P39.pdf
9/16/201925292529 SMC4-RP-102A Report on Loading Test of Pier Head's Supporting System P13.pdf
9/16/201925302530 SMC4-LC-779 Proceeding Bored Piles Works of abutment A1.pdf
9/16/201925312531 SMC4-WD-373 WD of Structure Excavation for Section P44-P45.pdf
9/16/201925322532 SMC4-WD-374 WD of Retaining Wall MSE Wall from Sta 0+494.22-Sta 0+566.125.pdf
9/17/201925332533 SMC4-MA-504 RP on Frequency Test of Reinforcing Steel VGS for Bore Piles of Pier P53; Pile Cap, Pier Column, Pier Head of P50-P52; P9-P10; P39 and Deck Slab of Span S36.pdf
9/16/201925342534 SMC4-LC-777 Acceptance of Sub Structure Construction Stage & Transfer to Constrution of Superstructure Work for P15.pdf
9/16/201925352535 SMC4-LC-778 Acceptance of Substructure Construction Stage & Transfer to Construction of Superstructure Work for P16.pdf
9/17/201925362536 SMC4-MA-506 RP on Frequency Test of Galbon SP Primer Paint of Hai Phong Paint JSC for SCC Slab of Steel Bridge (sampling date 01.09.2019).pdf
9/17/201925372537 SMC4-LC-780 Result of Ultrasonic Test of Cast in Place Concrete Piles at P43L.pdf
9/17/201925382538 SMC4-LC-781 Result of Ultrasonic Test of Cast in Place Concrete Piles at P43R.pdf
9/17/201925392539 SMC4-WD-375 WD of Superstructure Deck Slab for Spans 10,13,14,15 and Link Slab at Piers P10, P12, P13, P14 & P15.pdf
9/17/201925402540 SMC4-WD-376 WD of Substructure - Pier P7.pdf
9/17/201925412541 SMC4-WD-377 WD of Substructure Pier P8.pdf
9/17/201925422542 SMC4-MA-505 RP on Frequency Test of Reinforcing Steel- VIS for Super T Girder Span 60 (Minutes of Checking and Taking Sample Dated 13 September 2019).pdf
9/17/201925432543 SMC4-MA-507 RP on Frequency Test of Reinforcing Steel-VGS for Deck Slab and Link Slab S20-S23 (The Minutes of Checing and Taking Sample Dated 13 Sep 2019).pdf
9/17/201925442544 SMC4-LP-54 Clarify the Scope of Work of Noise Barrier Items.pdf
9/17/201925452545 SMC4-MC-17 Application for Interim Payment Certificate No.14 (Period 01st August,2019 to 31st August, 2019).pdf
9/17/201925462546 SMC4-LC-782 Swapping Position of Pre Tensioning Pre Stressed Super T Girders of Span S16.pdf
9/17/201925472547 SMC4-LC-783 Acceptance of CIP Concrete Pile Foundation Construction Stage & Tranfer to Construction of Substructure Work for P41R.pdf
9/18/201925482548 SMC4-AD-86 AD of CIP Concrete Piling D1.2m D1.2m of Pier P9.pdf
9/24/201925492549 SMC4-MS-296 MS of Cutting & Pruning Tree for Section A1-P16.pdf
9/18/201925502550 SMC4-WD-378 WD of Parapet & Median Barrier of Spans P19-P32.pdf
9/18/201925512551 SMC4-WD-379 WD of Substructure Pier P53 (3rd).pdf
9/18/201925522552 SMC4-LC-784 Acceptance of CIP COncrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work at P9.pdf
9/18/201925532553 SMC4-LC-762A Reply to the Consultant's Letter No, HCRR-RE1-16031.72 Warning about Working Safety on the High Position.pdf
9/17/201925542554 211-Agreement Minutes on Alternatives of Traffic Control for Construction of Asphalt Pavement.pdf
9/18/201925552555 3276-PMUTL-DHDA1 Implementation of Instructiion by MOT Vide Letter No.8736-BGTVT-CQLXD 16Sep19 Regarding Design of Additional Pile at P43C in PK1.pdf
9/20/201925562556 SMC4-WD-380 WD of Road Work - Epressway at Sta.0+447.90-Sta.0+568.40.pdf
9/20/201925572557 SMC4-AD-87 AD of Pre Tensioning Pre Stressed Super T Girder of Span 38 (P37-P38).pdf
9/20/201925582558 SMC4-LC-785 Result of Ultrasonic Test of CIP Concrete Piles at P49.pdf
9/20/201925592559 SMC4-LC-786-Result of Ultrasonic Test of CIP Concrete Pile at P50.pdf
9/20/201925602560 SMC4-LC-787 Submission of Weekly Report No.70.pdf
9/20/201925612561 SMC4-MC-18 Interim Payment Certificate No.14 ( Period 1-31AUG19).pdf
9/21/201925622562 SMC4-MA-508 Report on Frequency Test of Reinforcing Steel VGS for CIP Concrete Pile of P44,P45, Pier Column, Pier Head of P46,P47.pdf
9/21/201925632563 SMC4-WD-381 Calculation Sheet & WD of Adjust of CIP Concrete Pile, Pile Cap of P43C ( 1st Revision).pdf
9/21/201925642564 SMC4-RP-107 Report on Loading Test of Pier Head Supporting System at P60.pdf
9/21/201925652565 SMC4-RP-108 Report on Loading Test of Pier Head Supporting System at P58.pdf
9/21/201925662566 SMC4-WD-382 WD of Superstructure - Deck Slab for Span 16.pdf
9/21/201925672567 SMC4-WD-383 WD of Substructure Pier P45.pdf
9/21/201925682568 SMC4-WD-384 WD of Substructure -Deck Slab for Span 42 & Link Slabs at P41, P42.pdf
9/21/201925692569 SMC4-WD-385 WD of CIP concrete Pile for Abutment A28L.pdf
9/21/201925702570 SMC4-MS-297 MS for Construction of Parapet & Median Barrier.pdf
9/21/201925712571 SMC4-MS-298 Method Drawing for Erection of Super T Girder at Span S38(P37-P38) & S40(P39-P40).pdf
10/2/201925722572 SMC4-MA-509 Report on Frequency Test of Welding Material Welding Wire Supercore 81 Lot Number 20003938AB9GE2, 10Sep19.pdf
9/21/201925732573 SMC4-LC-788 Additional Manpower Mobilization Document for Substructure & Deck Slab Construction Work of Co.422.pdf
9/21/201925742574 SMC4-LC-789 Manpower Mobilization Document of Thanh Long for Erection of Steel Girder & Steel Concrete Composite Deck Slab.pdf
9/21/201925752575 SMC4-LC-790 Manpower Mobilization Document for Deck Slab Construction Work under Scope of Co.412.pdf
9/21/201925762576 SMC4-MA-510 Qualification Document of Acrowel Materials for Steel Structure.pdf
9/23/201925772577 SMC4-LC-793 Detailed Information of Subcontract Agreements.pdf
9/23/201925782578 SMC4-MA-511 Additional Manufacturer of Bridge Expansion Joints.pdf
9/23/201925792579 SMC4-MA-512 Report on Frequency Test of Reinforcing Steel VGS for Deck Slab S36 (MoC&TS dated 17Sep19).pdf
9/23/201925802580 SMC4-LC-791 Report on Environment Monitoring in Construction Stage (2nd Phase on Sep 2019 based on S1.43).pdf
9/23/201925812581 SMC4-LC-792 Result of Ultra Sonic Test of CIP Pile at P48 (From Pile No.1 to Pile No.8).pdf
9/23/201925822582 SMC4-LC-794 Official Instruction on Design Modification for Off Ramp HQV-B.pdf
9/24/201925832583 SMC4-WD-386 Calculation Sheet & WD of CIP Pile, Pile Cap P48 (1st).pdf
9/24/201925842584 SMC4-MS-299 MS of Pier Column from P8-P10.pdf
9/24/201925852585 SMC4-LC-795 Joint Between Retaining Wall Segments.pdf
9/24/201925862586 SMC4-MA-513 Report on Frequency Test of Coated PC Strand (11th) & Anchorage (5th).pdf
9/25/201925872587 SMC4-MA-514 Report on Frequency Test of VIS l for Girder Cover Plate ( MoC&TS 17Sep2019).pdf
9/25/201925882588 SMC4-MS-300 Calculation of Tendon Cable Elongation for Pier Head at P39.pdf
9/25/201925892589 SMC4-WD-385A WD of Elevation & Thickness of Deck Slab at Span S37 (P36-P37).pdf
9/25/201925902590 SMC4-LC-796 Acceptance of Sub Structure Construction Stage & Transfer ot Construction of Superstructure Work for P38.pdf
9/26/201925912591 SMC4-MA-515 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column,Pier Head P59, P60, Deck Slab & Link Slab S20-S30 (MoC& TS 21Sep19).pdf
9/26/201925922592 SMC4-MA-516 Report on Frequency Test of VGS for CIP Concrete Pile P44, P45, Deck Slab S25, S26 (MoC&TS 21Sep19).pdf
9/26/201925932593 SMC4-MA-517 Report on Frequency Test of Reinforcing Steel VGS steel for Pile Cap, Pier Column & Pier Head of P53,P54-P55,P56 ( MoC& TS 17Sep19).pdf
9/26/201925942594 SMC4-MA-518 Report on Frequency Test of VGS for Link Slab P30, P31 & Deck Slab Span S31 (MoC& TS 17Sep19).pdf
9/26/201925952595 SMC4-LC-797 Result of Ultrasonic Test of CIP Concrete Piles at P7.pdf
9/26/201925962596 SMC4-LC-798 Result of Ultrasonic Test of CIP Concrete Piles at P8.pdf
9/27/201925972597-SMC4-LT-0028 Inspection Minutes of LAS-XD 1256 of Techno Science of Transport Centre- UOT&C.pdf
9/23/201925982598 3307-PMUTL-DA1 Notice on Inspection Plan by Stage Acceptance Commitee.pdf
9/27/201925992599 SMC4-AD-88 AD of CIP Concrete Pilling D1.2m of Pier P49.pdf
9/27/201926002600 SMC4-WD-387 WD of Substructure Pile Cap & Column Side Pier P32 (1st).pdf
9/30/201926012601 SMC4-LC-799 Sulutions for Water Supply Pipe D800 at Abutment A1.pdf
9/27/201926022602 SMC4-RP-109 Report on Loading Test of Pier Head's Supporting System at P12.pdf
10/1/201926032603 SMC4-MA-519 Report on Frequency Test of Welding Material Welding Wire Supercore 81 Lot No. 20003938AB9GE2 Testing 13Sep19 & 20Sep19.pdf
9/27/201926042604 SMC4-WD-388 WD of Elevation& Thickness of Deck Slab at Spans S24 (P23-P24),S24 (P24-P25),S26 (P25-P26).pdf
9/27/201926052605 SMC4-MS-301 Calculation of Tendon Cable Elongation for Pier Head P57-P58.pdf
9/27/201926062606 SMC4-LC-801 Environmental Monitoring Schedule in Oct 2019 at Construction Phase.pdf
9/27/201926072607 SMC4-LC-800 Acceptance of CIP Concrete Pile Foudation Construction Stage & Tranfer to Construction of Substructure Work for P49.pdf
9/30/201926082608 SMC4-MA-520 Report on Frequency Test of Bolt Material for Steel Bridge S10T (including Nut & Washer) TS dated 05Aug19 & Testing dated 13Aug19.pdf
9/30/201926092609 SMC4-MA-521 Report on Frequency Test of Bolt Material for Steel Bridge S10T (including Nut & Washer) TS dated 31Aug19 & Testing dated 09Sep19.pdf
9/30/201926102610 SMC4-LC-803 Submission of Weekly Report No.71.pdf
9/30/201926112611 SMC4-LC-804 Changing Position of Steel Bar U160x56x5.2 of the Anti-Glare Fence on the Concrete Parapet (2nd).pdf
9/30/201926122612 SMC4-LC-802 Resubmit Subcontract Agreements with PHATECO and Nhat Son Quang.pdf
9/30/201926132613 SMC4-MA-522 Report on Frequency Test of Reinforcing Steel - VGS for Pile, Pier Column P49 (MoC&TS 20Sep 2019).pdf
9/30/201926142614 SMC4-MA-523 Report on Frequency Test of Reinforcing Steel - VIS Bar for Super T Girder Span S60 (MoC&TS 24 September 2019).pdf
9/30/201926152615 SMC4-MA-524 Report on Frequency Test of Reinforcing Steel - VIS Bar (VIS) for Super T Girder Span S42, S53 (MoC&TS 24Sep19.pdf
9/30/201926162616 1117 VPCP-TH Invitation Letter.pdf
9/30/201926172617 SMC4-LC-805 Report on Environment Monitoring Results at Stage 3 2019 at Steel Structure Fabrication Factory of Thanh Long JSC.pdf
9/30/201926182618 SMC4-MA-518A Report on Frequency Test of PC Strand for Super T Girder (33rd).pdf
9/30/201926192619 SMC4-MA-519A Report on Frequency Test of PC Strand for Super T Girder (34th).pdf
9/30/201926202620 SMC4-WD-389 WD of Elevation & Thickness of Deck Slab at Span S36 (P35-P36).pdf
10/4/201926212621 SMC4-MS-302 MS for Construction of Pier Head & Outline of the Loading Test of Pier Head's Supporting System from P46-P56.pdf
9/30/201926222622 SMC4-AD-89 AD of CIP Concrete Pilling D1.2m of Pier P50.pdf
9/30/201926232623 SMC4-WD-390 WD of Miscellaneous -General View of Noise Barrier (1st).pdf
9/30/201926242624 SMC4-LC-806 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P50.pdf
10/1/201926252625 SMC4-WD-391 WD of Substructure - Pile Cap of Side Pier P43 (2nd).pdf
10/1/201926262626 SMC4-WD-392 WD of Substructure - Column & Pier Head P48 (1st).pdf
10/1/201926272627 SMC4-WD-393 WD of Substructure - Pier P44 (1st).pdf
10/1/201926282628 SMC4-WD-394 WD of Superstructure Diaphargm from Span 7-9 & 44-61 (1st).pdf
10/1/201926292629 SMC4-LP-55 Supporting the Contractor to Get Permit for Cutting & Prunning Trees at the Section from Mai Dich Bridge to P16.pdf
10/1/201926302630 SMC4-LC-807 Result of Tip Contact Checking Test of CIP at C5-P7.pdf
10/1/201926312631 SMC4-MA-525 Capacity Profile of Supplier, Manufaturer Bitumen, Bitumen Emulsion Used for Asphalt concrete.pdf
10/1/201926322632 SMC4-LT-29 Updated Capacity Profile of Crushed Stone Quarry for Asphalt Concrete of Ha Tay JSC.pdf
10/3/201926332633 SMC4-MA-526 Notice on Transferring a Part of VGS Used for Deck Slab of S20 to S24.pdf
10/3/201926342634 SMC4-MS-303 Supplement for Calculation of Tendon Cable Elongation of Pier Head P11-P12.pdf
10/7/201926352635 SMC4-MS-304 MS of Gate Arrangement Between Pier P50-P51 & P53-P54.pdf
10/3/201926362636 SMC4-LC-808 Report on Environment Monitoring in Construction Stage (3rd Phase in Sep 2019 Based on S1.43).pdf
10/3/201926372637 SMC4-LC-809 Report on Environment Monitoring in Construction Stage Sep 2019 (Base on EMP).pdf
10/4/201926382638 SMC4-MS-305 General Plan for Relocation or Protection Water Supply Pipe D800 at Abutment A1(2nd).pdf
10/7/201926392639 SMC4-MS-306 MS of Erection for Pier Head P17, P18 (2nd).pdf
10/4/201926402640 SMC4-LC-812 Resubmission of Schedule for Steel Bridge (2nd).pdf
10/4/201926412641 SMC4-WD-395 WD of Pot Bearing at Piers P16 & P19 (2nd).pdf
10/4/201926422642 SMC4-WD-396 WD for teel Concrete Composite Deck Slab (SCC Slab) of Steel Bridge (1st revision).pdf
10/4/201926432643 SMC4-LC-810 Withdrawal of the Letter SMC4-LT-0756-19 dated 6Sep2019.pdf
10/5/201926442644 SMC4-LC-811 Updated Quality Control Plan (3rd).pdf
10/5/201926452645 SMC4-LC-813 Minutes of Meeting Regarding Plan for Erection of Span S61.pdf
10/5/201926462646 SMC4-MA-527 Characteristic Strength for Concete Class A of Viep Tiep BP ( New Location)- RP No.3 (fr 1Aug to 31Aug2019).pdf
10/5/201926472647 SMC4-MA-528 Characteristic Strength for Concrete Class C of Transmeco - RP No.7 (fr 1Aug to 30Aug2019).pdf
10/5/201926482648 SMC4-MA-529 Characteristic Strength for Concrete Class Y of Transmeco - RP No.7 (fr 1Aug to 29Aug2019).pdf
10/7/201926492649 SMC4-MS-305A MS for Lower Part of Pier Head P9-P10.pdf
10/16/201926502650 SMC4-MS-307 Supplement Method Drawing of Link Slab Construction.pdf
10/7/201926512651 SMC4-MS-308 MS for Erection of Super T Girder at Span S58 (P57-P58) to S61 (P60-P61).pdf
10/7/201926522652 SMC4-LC-814 Engineer's Confirmation for Safety & Environment Satisfaction (1Sep2019 to 30Sep2019).pdf
10/7/201926532653 SMC4-LT-535 Updated Quality Control Plan & Quality Assurance Plan & Welding Plan for Steel Bridge Fabrication at Thang Long Group JSC.pdf
10/7/201926542654 SMC4-LP-56 Clarify the Scope of Work of Contractor in the Items Related for Urban Road under Viaduct.pdf
10/7/201926552655 SMC4-MA-530 Report on Frequency Test of Shear Stud Connector for Steel Bridge (TS dated 12Sep2019 & Testing dated 18Sep2019).pdf
10/7/201926562656 SMC4-MA-531 Report on Frequency Test of PC Strand for Super T Girder (35th).pdf
10/7/201926572657 SMC4-MA-532 Material Source & C19 Tight Aggregate Asphalt Concrete at 703 Asphalt BP of PK2 used for PK1.pdf
10/7/201926582658 SMC4-MA-533 Notification on Transferring VGS Used for Deck Slab S36 Righ Side.pdf
10/7/201926592659 SMC4-MA-534 Notification on Transferring of VGS Steel Used for Diaphragm S38 Righ Side.pdf
10/7/201926602660 SMC4-LC-815 Machine & Manpower Mobilization Document of Thanh Long JSC for Erection of Steel Girder.pdf
10/8/201926612661 SMC4-LC-809A Withdrawal of the Letter SMC4-LC-799 dated 26Sep2019.pdf
10/8/201926622662 SMC4-LC-816 Withdrawal of the Letter SMC4-WD-0381 dated 19Sep2019.pdf
10/8/201926632663 SMC4-817 Withdrawal of the Letter SMC4-WD-0386 dated 23Sep2019.pdf
10/8/201926642664 SMC4-LC-817A Design of Addtional CIP Concrete Pile at Pier P43C (1st).pdf
10/8/201926652665 SMC4-LC-817B Design of Additional CIP Concrete Pile at Pile at Pier P48 (1st).pdf
10/21/201926662666 SMC4-LC-818 Submission of Construction Schedule of Oct 2019.pdf
10/8/201926672667 SMC4-LC-819 Protection Solutions the Reinforcement Bar of Deck Slab at Span S31 (P30-P31) Left Side.pdf
10/8/201926682668 SMC4-WD-397 WD of Backfill at Piers P44-P45.pdf
10/8/201926692669 SMC4-WD-398 WD of Superstructure - Deck Slab for Spans 51, 52, 55, 56, 59, 60 & Link Slab at P50-P52, P54-P56, P58-P60.pdf
10/8/201926702670 SMC4-MA-536 Capacity Profile of Manufacturer & Supplier of Joint Sealing Grout - VITEC JSC.pdf
10/8/201926712671 SMC4-MA-537 Report on Frequency Test of Material for Cement Concrete at Viet Tiep BP (13th-15th) & Updated Frequency Test of Cement R28 (9th-11th).pdf
10/8/201926722672 SMC4-MS-309 Outline for Loading Test of Pier Head's Supporting System P9-P11.pdf
10/8/201926732673 SMC4-MS-310 Resubmission of the Supplement of the Storing Plan for Super T Girder 34.3m Type at Fabrication Yard of Group No.2 ( Rev 2).pdf
10/9/201926742674 SMC4-RP-110 Report on Loading Test of Pier Head's Supporting System at P14.pdf
10/9/201926752675 SMC4-RP-111 Report on Loading Test of Pier Head's Supporting System at P46.pdf
10/9/201926762676 SMC4-MA-538 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column & Pier Head P41-P43 (MoC& TS dated 21 Oct2019).pdf
10/9/201926772677 SMC4-MA-539 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column & Pier Head P53-P56 ( MoC& TS dated 2 Oct2019).pdf
10/9/201926782678 SMC4-MA-540 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column Pier Head P41-P43, P50-P52( MoC&TS dated 2 Oct2019.pdf
10/9/201926792679 SMC4-MA-541 Report on Frequency Test of Reinforcing Steel VGSl for Link Slab P24-P26 ( MoC&TS dated 1 Oct2019).pdf
10/10/201926802680 SMC4-WD-399 WD of Substructure - Pier P8 (2nd).pdf
10/9/201926812681 203-TTHDNTNN-GD3 Results of Site Inspection to the HCRR3 Construction Project MD-STL Section.pdf
10/9/201926822682 1147 GM-BGTVT Notice on Changing Inspection Time.pdf
10/10/201926832683 SMC4-MA-543 Report on Frequency Test of Reinforcing Steel VIS for Super T Girder of Span S41, S50 ( MoC&TS dated 5 Oct 2019).pdf
10/10/201926842684 SMC4-MA-542 Report on Frequency Test of Materials for Cement Concrete at ASEAN BP (21st & 22nd) & Updated Frequency Test of Cement R28 (20th).pdf
10/10/201926852685 SMC4-MA-544 Report on Frequency Test of Materials for Cement Concrete at Transmeco BP (40th to 44th) & Updated Result of Cement R28 (36th & 38th).pdf
10/10/201926862686 SMC4-LT-30 Inspection Minutes of LAS-XD 1256 of TechnoScience of Transport Centra- UOT&C.pdf
10/10/201926872687 SMC4-RP-109A Report on Excavation for Survey of Underground Utilities at P32 ( L+R).pdf
10/10/201926882688 SMC4-LC-820 Submission of Weekly Report No.72.pdf
10/10/201926892689 SMC4-LC-821 Submission of Weekly Report No.73.pdf
10/10/201926902690 SMC4-LC-822 Result of Ultrasonic Test of CIP Concrete Pile at P53.pdf
10/10/201926912691 SMC4-LC-823 Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P39.pdf
10/10/201926922692 SMC4-LC-824 Capacity Profile of Subcontractor Hai Anh Co.Ltd.pdf
10/10/201926932693 SMC4-RP-112 Report on Checking the Periodic Benchmarks System (3rd).pdf
10/10/201926942694 SMC4-AD-90 As Built Drawing of Pre Tensioning Pre Stressed Super T Girder Span 39 (P38-P39).pdf
10/10/201926952695 SMC4-WD-400 WD of Superstructure - Deck Slab Span 61.pdf
10/10/201926962696 SMC4-WD-401 WD of General Layout of Drainage System from Km0+400.00-Km0+740.00.pdf
10/10/201926972697 SMC4-WD-402 WD of Substructure Pier P7 (2nd).pdf
10/10/201926982698 SMC4-MS-312 Resubmission of Permission for Circulation of Vehicles to Transport Overlength Cargo on Road (Transportation of Steel Girder& Steel Pier Head).pdf
10/19/201926992699 SMC4-MS-311 MS for Construction of Pier Head from P41-P43.pdf
10/14/201927002700 SMC4-MA-545 Material of Stabilized Earth (MSE) Retaining Wall System.pdf
10/14/201927012701 SMC4-MA-546 Report on Frequency Test of Galbon SP Primer Paint of Hai Phong JSC for SCC Slab of Steel Bridge ( Samle date 30Sep2019).pdf
10/14/201927022702 SMC4-WD-403 WD of Superstructure Deck Slab for Spans 54, 57, 58.pdf
10/14/201927032703 SMC4-WD-404 WD of Superstructure -Deck Slab for Spans 40 and 41 (2nd).pdf
10/14/201927042704 SMC4-LC-825 Submission of Monthly Report No.17.pdf
10/14/201927052705 SMC4-LC-826 Report on Environment Monitoring in Construction Stage, 1st Phase in Oct 2019, based on S1.43).pdf
10/14/201927062706 SMC4-LC-827 Withdrawal of Letter MA-0411 dated 13July19.pdf
10/14/201927072707 SMC4-LC-830 Additional Supervision Cost of Engineer's Staff (Aug 2019).pdf
10/14/201927082708 SMC4-RP-113 Report on Loading Test of Pier Head's Supporting System at P57.pdf
10/14/201927092709 SMC4-MS-314 Method Statement of Structure Excavation P44-P45.pdf
10/14/201927102710 SMC4-MS-313 Method Statement of Pile Cap P44-P45.pdf
10/15/201927112711 SMC4-MA-547 Report on Frequency Test of Reinforcing Steel VGS for CIP Concrete Pier of P32 ( MoC& TS dated 11 Oct 2019).pdf
10/15/201927122712 SMC4-MA-548 Testing Result of HDPE Conduit Santo JSC.pdf
10/15/201927132713 SMC4-AD-91 As Built Drawing of CIP Concrete Piling D1.2m of P8.pdf
10/15/201927142714 SMC4-WD-405 WD of Detail of Expansion Joint (for Main Bridge -2nd).pdf
10/15/201927152715 SMC4-LC-831 Manpower Mobilization Document for Supporting Work.pdf
10/15/201927162716 SMC4-LC-832 Notice of Department of Transport Regarding- Traffic Diviersion & Organization on PVD Str for Super T Girder Erection( 10 Oct 2019 to 11 Jan 2020).pdf
10/15/201927172717 SMC4-LC-828 Protection Plan for Water Supply Pipe D800 at the Location of Abutment A1- Raising the Elevation of Abutment's Pile Cap.pdf
10/15/201927182718 SMC4-LC-829 WD of CIP Concrete Piles, Pile Cap & Abutment A1.pdf
10/15/201927192719 SMC4-MS-315 Report on Loading Test for Pier Head's Supporting System at P18.pdf
10/15/201927202720 SMC4-MS-316 Method Statement of Mock Up for SCC Deck Slab.pdf
10/16/201927212721 SMC4-LC-833 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P8.pdf
10/16/201927222722 SMC4-LP-57 Support the Contractor to Extending the Method of Fencing Traffic Control at Project.pdf
10/16/201927232723 SMC4-LC-834 Appendix to the Contract with Subcontractor Thanh Long Group JSC.pdf
10/16/201927242724 SMC4-WD-407 WD of Substructure- Column & Pier Head of P43 (2nd).pdf
10/16/201927252725 SMC4-WD-406 WD of Additional CIP Concrete Pile at P43C (1st).pdf
10/16/201927262726 SMC4-WD-408 WD of Supstructure -Adjustment Pile Cap of Pier Cap of P43C (1st).pdf
10/16/201927272727 SMC4-MA-549 Report on Frequency Test of Reinforcing Steek VGS for Pile Cap, Pier Column P7-P8 (MoC&TS dated 12 Oct 2019).pdf
10/16/201927282728 3557-PMUTL-DHDA1 Triển khai thi công nhánh HQV-B.pdf
10/16/201927292729 3604-PMUTL-DHDA1 Overall Construction Schedule & Quality Control.pdf
10/17/201927302730 SMC4-WD-402A WD of Painting of Segment 7&15 - Rigid Pier Head of Steel Bridge (1st).pdf
10/17/201927312731 SMC4-WD-409 WD of Substructure - Upper Part of Pier Head P32.pdf
10/17/201927322732 SMC4-AD-92 AD of CIP Concrete Piling D1.2m of Pier P42R.pdf
10/17/201927332733 SMC4-LC-835 Acceptance Substructure Construction Stage & Transfer to Construction Superstructure Work for P60.pdf
10/17/201927342734 SMC4-LC-836 Acceptance of Substructure Construction Stage & Transfer to Construction of Superstructure for P59.pdf
11/4/201927352735 3618-QD-BQLDATL Decision for Design Change of Pile Foundation Structure of Pier P43C in PK1.pdf
10/18/201927362736 SMC4-LC-837 Countermeasure to Improve Concrete Surface of Multi-pier Pier Head.pdf
10/18/201927372737 SMC4-LC-836A Proposal for Using Super T Girder at Span S59(P58-P590 for Span S61(P60-P61) & Vice Versa.pdf
10/18/201927382738 SMC4-LC-838 Additional Machine & Manpower Mobilization Document of Subcontractor Thanh Long Group JSC for Erection of Steel Girder( Crane & Operator-1st).pdf
10/18/201927392739 SMC4-LC-839 Clarification of Arrangement of HDPE Corrugate Conduit for ITS System in the Median Barirer on the Bridge.pdf
10/18/201927402740 SMC4-LC-840 Cost Estimate for Changing Design of Drainage Pipe Cultvert D500.pdf
10/18/201927412741 SMC4-LC-841 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P42R.pdf
10/18/201927422742 SMC4-LC-842 Survey Data of Span S61 Before the Erection of Super T Girders.pdf
10/18/201927432743 SMC4-MS-317 Method Statement for Fabrication Panel MSE.pdf
10/18/201927442744 SMC4-WD-410 WD of Elevation & Thickness of Deck Slab at Span S38 (P37-P38).pdf
10/18/201927452745 SMC4-WD-411 WD of Detail of Drainage System under Viaduct Section P18-P25.pdf
10/18/201927462746 SMC4-WD-412 WD of Retaining Wall - Parapet from Km0+447.90-Km0+494.22.pdf
10/18/201927472747 SMC4-AD-93 As-built Drawing of Pre Tensioning Pre Stressed Super T Girder Span 60 (P59-P60).pdf
10/18/201927482748 SMC4-AD-94 As-built Drawing of Pre Tensioning Pre Stressed Super T Girder Span 61 (P60-P61).pdf
10/19/201927492749 SMC4-MC-19 Interim Payment Certificate No.15 ( Period 01st Sep to 30th 2019).pdf
10/19/201927502750 SMC4-MA-550 Supplement the Testing Properties of Waterproofing Material HASEAL 5.pdf
10/19/201927512751 SMC4-MA-551 Notification on Transferring VGS Steel for the Use of Pile Cap & Column of P7, P8.pdf
10/19/201927522752 SMC4-MA-552 Notification on Transferring VGS Steel for the Use of Deck Slab S38 Right Side.pdf
10/19/201927532753 SMC4-MA-553 Notification on Transferring VGS Steel for the Use of Pile Cap & Column of P7, P8.pdf
10/19/201927542754 SMC4-MA-554 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column, Pier Head P41-P43 ( MoC&TS dated 11 Oct 2019).pdf
10/19/201927552755 SMC4-RP-114 Report on Excavation for Survey of Underground Utilities at P43C- Around the Additional Pile.pdf
10/19/201927562756 SMC4-LC-843 Submission of Weekly Report No.74.pdf
10/19/201927572757 SMC4-MS-318 Site Organization Chart of SMCC-CIENCO4 JV for Construction SCC Deck Slab.pdf
10/19/201927582758 SMC4-RP-115 Report on Loading Test of Pier Head's Supporting System at P11.pdf
10/19/201927592759 SMC4-MA-555 Report on Frequency Test of Reinforcing Steel VGS for Deck Slab S25 ( MoC& TS dated 12 Oct 2019).pdf
10/19/201927602760 SMC4-MA-556 Report on Frequency Test of Reinforcing Steel VGS for Deck Slab S37-P40 (MoC&TS dated 11 Oct 2019).pdf
10/21/201927612761 SMC4-MC-20 Resubmission of Interim Payment Certificate No.15 (Period 01-30 Sep 2019).pdf
10/22/201927622762 SMC4-LC-844 Reply for Engineer's Request to Submit Details Document Supporting the Protection of Water Pipe D800 at A1 & Resubmitsion of WD of Adjusted Pile at A1 Abutment(2nd).pdf
10/21/201927632763 SMC4-MS-319 Method Drawing for Construction of Pile Cap P43 (L,R).pdf
10/22/201927642764 SMC4-WD-413 WD of Additional CIP Concrete Pile at P43C (2nd).pdf
10/22/201927652765 SMC4-MS-317A Calculation of Tendon Cable Elongation for Pier Head P14.pdf
10/22/201927662766 SMC4-MS-319A Calculation of Tendon Cable Elongation for Pier Head P44-P57.pdf
10/22/201927672767 SMC4-MS-320 Method Statement of Steel Girder Erection.pdf
10/22/201927682768 SMC4-AD-95 AD of CIP Concrete Piling of D1.2m of P43L.pdf
10/22/201927692769 SMC4-WD-415 WD of Superstructure - Deck Slab for S49, S50, S53.pdf
10/22/201927702770 SMC4-WD-414 WD of Superstructure- Deck Slab for Span 46-48 & Link Slab P45-P48.pdf
10/23/201927712771 SMC4-RP-116 Loading Test of Pier Head Supporting System at P52, P56.pdf
10/23/201927722772 SMC4-WD-416 WD of Diaphragm from Span 44-61.pdf
10/23/201927732773 SMC4-WD-417 WD of Diaphragm from Span 7-9.pdf
10/23/201927742774 SMC4-WD-418 WD of Parapet& Median Barrier of Spans P19-P32 (2nd).pdf
10/23/201927752775 SMC4-LC-848 Internal Target Schedule for Main Bridge.pdf
10/28/201927762776 SMC4-LC-847 Design Change Document for Modification of Abutment A1 Structure.pdf
10/23/201927772777 SMC4-LC-845 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P43L.pdf
10/23/201927782778 SMC4-LC-846 Acceptance of Sub Structructure Construction Stage & Transfer to Construction of Superstructure Work of P40.pdf
10/23/201927792779 SMC4-MS-319B MS of CIP Concrete Pilling Diameter D1.2m - Additional Pile at P43C.pdf
10/24/201927802780 3677-PMUTL-DA1 Opinion on Design of WD of Traffic Safety on the Widened Road under the RRNo.3 Widening Project, MDSTL Section.pdf
10/24/201927812781 10052-BGTVT-CQLXD Design of Additional CIP Concrete Pile at P48 in PK1.pdf
10/26/201927822782 SMC4-AD-96 AD of Pre Tensioning Pre Stressed SuperT Girder Span 40(P39-P40).pdf
10/26/201927832783 SMC4-MA-557 Testing Result of Selection of Backfill Material- Cao Duong Quarry, Commune Exploited by Hien Luong Mineral Exploitation & ProcessingCo.Ltd & Spuulied by 28-10 Thang Long JSC.pdf
10/26/201927842784 SMC4-MA-558 Notification on Transferring VGS Steel for the Use of Pile Cap & Column of P53.pdf
10/26/201927852785 SMC4-LC-849 Manpower Mobilization Document of Subcontractor Thanh Long JSC for Construction Work of Steel Girder at Site - 1st.pdf
10/26/201927862786 SMC4-LC-850 Acceptance of CIP Concrete Pile Foundation Construction Stage& Transfer to Construction of Substructure Work for P53.pdf
10/26/201927872787 SMC4-AD-97 AD of CIP Concrete Piling of Pier P53.pdf
10/26/201927882788 SMC4-MA-562 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column of P7 P8, Pier Head Pier Column of P9, P10, substructure P41-P43, P50-P52 ( MoC&TS 19Oct2019).pdf
10/26/201927892789 SMC4-MA-561 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column of P44-P45, Pier Head of P47, CIP Concrete Pile P48, Deck Slab Span S25(MoC&TS 20 Oct 2019).pdf
10/26/201927902790 SMC4-MA-563 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column & Pier Head of P53-P56 ( MoC&TS dated 19 Oct 2019).pdf
10/29/201927912791 SMC4-LC-851 Proceeding Bored Piles Work at Abutment A1 following Modified Design.pdf
10/28/201927922792 SMC4-WD-419 WD of Additional CIP Concrete Pile at pier P48.pdf
10/28/201927932793 SMC4-MA-559 Report on Frequency Test of Reinforcing Steel VGS for CIP Concrete Pile of Pier P43C ( the MoC & TS dated 22 Oct 2019).pdf
10/28/201927942794 SMC4-MA-560 Report on Frequency Test of Reinforcing Steel of VGS for Super T Girder of S54-S58 ( The MoC&TS dated 22 Oct 2019).pdf
10/28/201927952795 SMC4-LC-852 Report on Environment Monitoring In Consruction Stage, 2nd Phase in Oct 2019 based on S1.43.pdf
10/28/201927962796 SMC4-LC-853 Notice of Environment Monitoring Schedule in Nov 2019 at Construction Phase.pdf
10/28/201927972797 SMC4-WD-420 WD of Elevation & Thickness of Deck Slab at S39 (P38-P39).pdf
10/28/201927982798 SMC4-AD-98 AD of CIP Concrete Piling D1.2m of Pier P7.pdf
11/6/201927992799 SMC4-MS-321 Method Statement of Pier Head from P9-P10.pdf
10/28/201928002800 SMC4-MA-564 Notification on Transfering VGS Steel for the use of Diaphragm Span S54-S61.pdf
10/28/201928012801 SMC4-MS-322 MS of CIP Concrete Pilling Diameter D=1.2m Abutment A1.pdf
10/28/201928022802 SMC4-WD-421 WD of Substructure - Adjustment Pile Cap of P43C (1st).pdf
11/14/201928032803 SMC4-WD-422 WD of Painting of Segments 1-6, 8-14, 16-21 of Steel Girder (1st).pdf
10/28/201928042804 3732-QD-BQLDATL Approval Decision for Design Change of Pile Foundation Structure of P48 in PK1.pdf
10/29/201928052805 SMC4-RP-117 Report on Excavation for Survey of Underround Utilities at C9A-P48.pdf
10/29/201928062806 SMC4-LC-854 Weekly Report No.75.pdf
12/13/201928072807 SMC4-LC-855 Changing Design of Drainage Pipe Culvert D500.pdf
10/29/201928082808 SMC4-WD-423 WD of Deck Slab Spans 11 & 12.pdf
10/29/201928092809 SMC4-MS-323 MS of CIP Concrete Piling Diameter D1,2m - Additional Pile at P48.pdf
10/29/201928102810 SMC4-LC-856 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work at P7.pdf
10/30/201928112811 SMC4-LC-857 Result of Ultrasonic Test of CIP Concrete Pile at P44.pdf
10/30/201928122812 SMC4-LC-858 Result of Ultrasonic Test of CIP Concrete Pile at P45.pdf
10/30/201928132813 SMC4-MA-565 Frequency Test of VGS for Deck Slab S39R,Parapet S39R, Diaphragm S39, Link Slab P28 P29 ( MoC&TS 21 Oct 2019).pdf
10/30/201928142814 SMC4-MA-566 Frequency Test of Reinforcing Steel VGS for Deck Slab of S37-S40 ( MoC&TS 22 Oct 2019).pdf
10/31/201928152815 SMC4-MA-567 Addition Capacity Profile of Asphalt Concrete Batching of Plant 656 Co.LTD.pdf
10/31/201928162816 SMC4-MA-568 Updated Profile of Material & Mix Design for Drainage Pipes Manufacturer, Material Sourse & Mix Desgn used for Drainage Pipe.pdf
10/31/201928172817 SMC4-MA-569 Capacity Profile of Manufacturer for Mineral used for Asphalt Concrete-Bao Minh Mineral Co.LTD.pdf
11/15/201928182818 SMC4-MS-320A MS for Diaphragms Construction from P44-P61.pdf
10/31/201928192819 SMC4-MS-324 MS of Demolition of Existing Pavement, Site Clearing & Common Excavation.pdf
10/31/201928202820 SMC4-MS-325 Report on Loading Test of Pier Head's Supporting System at P10.pdf
10/31/201928212821 SMC4-MS-326 Report on Pre-Assembly of Segment 16 to 21 (G1+G2).pdf
10/31/201928222822 SMC4-MS-327 Report on Pre-Assembly of Segment 14,15,16.pdf
10/30/201928232823 SMC4-LC-860 Target Schedule for Main Bridge.pdf
10/31/201928242824 SMC4-LC-859 Acceptance of Sub Structure Construction Stage & Tranfer to Construction of Superstructure Work for P58.pdf
11/2/201928252825 SMC4-LC-861 Notice for the Leave of Key Personnel (Foundation. Piling Engineer).pdf
10/31/201928262826 3780-PMUTL-DA1 Implementation of Conclusion by MOT's Inspection Team on Environment Protection.pdf
10/31/201928272827 490-GM-BQLCTGT Invitation Nov 11,2019 Holding a Coordination Meeting for Construction between HCRR3 & Investment Project for Widening RR3.pdf
11/2/201928282828 SMC4-MA-570 Report on Frequency Test of Reinforcing Steel VGS for Deck Slab & Diaphragm S54-S61 ( MoC&TS dated 28 Oct 2019).pdf
11/2/201928292829 SMC4-MA-571 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap P7 (MoC&TS dated 29 Oct2019).pdf
11/2/201928302830 SMC4-LC-862 Manpower of WD Design (Electrical Engineer).pdf
11/2/201928312831 SMC4-MA-572 Capacity of Profile of Supplier & Manufacturer of Angle Steel for Positioning Transverse Rib of ACC Deck Slab-Thai Nguyen JSC.pdf
11/2/201928322832 SMC4-MA-573 Additional Profile of Manufacturer & Suppluer Viet Thang LTD for Anchor Bolt D25(M24) for Noise Barrier.pdf
11/2/201928332833 SMC4-WD-424 WD of Substructure - Adjustment Pile Cap of P48 (1st).pdf
11/2/201928342834 SMC4-WD-425 WD of Steel Concrete Composite Deck Slab of Steel Bridge (1st Revision-2nd).pdf
11/2/201928352835 SMC4-AD-99 AD of Super T Girder Span 59 ( P58-P59).pdf
11/2/201928362836 SMC4-LC-863 Submission of Weekly Report No.76.pdf
11/2/201928372837 SMC4-MS-328 MS of Structure Excavation Abutment A1.pdf
11/4/201928382838 SMC4-LC-865 Overall Construction Schedule & Quality Control.pdf
11/2/201928392839 SMC4-LC-867 Arrangement of HDPE Corrugate Conduit of ITS System in Median Barrier on the Bridge.pdf
11/6/201928402840 SMC4-MS-329 Loading Test Outline of Support System TP12, 13, 14 for Steel Girder Erection of Span P18-P19.pdf
11/2/201928412841 SMC4-MS-330 WD of Elevation & Thickness of Deck Slab S60 (P59-P60).pdf
11/2/201928422842 SMC4-LC-864 Report on Environment Monitoring in Construction Stage ( 3rd Phase Oct 19 based on S1.43).pdf
11/2/201928432843 1193-2919-JICA-YL Disbursement Schedule for the End of Calendar Year 2019.pdf
11/5/201928442844 SMC4-LC-866 Withdrawal of Letter SMC4-LC-0844-19 dated 21 October 2019.pdf
11/5/201928452845 SMC4-LC-868 Submission of Construction Schedule of November - 2019.pdf
11/5/201928462846 SMC4-LC-869 Notification on the Replacement of the Contractor's Chief Engineer at the Fabrication Yard.pdf
11/6/201928472847 SMC4-MA-574 Report on Frequency Test of Reinforcing Steel - VGS for Deck Slab Span S37-S40,S60, Link Slab S37-S40, Diaphragm S38-S40 (MoC&TS dated 27 Oct 2019).pdf
11/6/201928482848 SMC4-MA-575 Submission of Qualification Documents of Organic Zinc Rich Paint for High Tensile Bolt of Steel Bridge (Epicon Zinc HB2 of Hai Phong JSC).pdf
11/6/201928492849 SMC4-MA-576 Report on Frequency Test of Reinforcing Steel VGS for Parapet P19-P30 (MoC&TS dated 28 Oct 2019).pdf
11/6/201928502850 SMC4-MS-331 MS of Deck Slab Construction from P44-P61.pdf
11/6/201928512851 SMC4-MA-577 Report on Frequency Test of Reingforcing Steel VIS for Super T Girder Span S42, S53 (MoC&TS 28 Oct 2019).pdf
11/6/201928522852 SMC4-MA-578 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap, Pier Column & Pier Head of P53-P56( MoC& TS dated 26 Oct 2019).pdf
11/6/201928532853 SMC4-LC-870 Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P14.pdf
11/6/201928542854 SMC4-MA-582 Characteristic Strength of Concrete Class C of Asean - Report 1(26 Jun-12 Sep 2019) & RPNo.2 (14-28 Sep 2019).pdf
11/6/201928552855 SMC4-MA-583 Characteristic Strength for Concrete Class C of Transmeco BP- Report No. 8 (2-29 Sep 2019).pdf
11/6/201928562856 SMC4-MA-586 Report on Frequency Test of Reinforcing Steel VGS for Pier Head of P49 (MoC&TS 22 Oct 2019).pdf
11/6/201928572857 SMC4-MA-587 Characteristic Strength of Concrete Class A of Viet Tiep BP( New Location) - Report No. 4( 1-29 Sep 2019).pdf
11/6/201928582858 SMC4-MA-588 Characteristic Strength of Concrete Class Y of Viet Tiep BP - Report 1(10 Jul-17 Sep2019) RP 2( 19-30 Sep 2019).pdf
11/6/201928592859 SMC4-WD-426 WD of Road Work- Express Way from Station Km0+568.40 (2nd).pdf
11/6/201928602860 SMC4-WD-427 WD of Deck Slab Span 16 (2nd).pdf
11/6/201928612861 SMC4-MA-579 Characteristic Strength for Concrete B of Transmeco BP- Report No. 2 (8 Jun -29 Sep 2019).pdf
11/6/201928622862 SMC4-MA-580 Characteristic Strength for Concrete Class Y of Transmeco BP- Report No. 8( 3-20 Sep 2019).pdf
11/6/201928632863 SMC4-MA-581 Charateristic Strength for Concrete Class Y of Viet Tiep BP(New Location) - Report 1, 2.pdf
11/13/201928642864 SMC4-MS-332 MS for Construction of Concrete Wall.pdf
11/7/201928652865 SMC4-MS-334 Supplement the Method Drawing for Pier Head at P47.pdf
11/7/201928662866 SMC4-525A Notification on Transfering VGS for the Use of Diaphragm Span S54-S61.pdf
11/7/201928672867 SMC4-LC-871 Result of Ultrasonic Test of CIP Concrete Pile at P43C.pdf
11/7/201928682868 SMC4-LC-872 Result of Ultrasonic Test of CIP Concrete Pile at P32R.pdf
11/7/201928692869 SMC4-LC-873 Result of Ultrasonic Test of CIP Concrete Pile at P32L.pdf
11/7/201928702870 SMC4-WD-428 WD of Parapet (Left Side) of Span P27-P32.pdf
11/7/201928712871 SMC4-MS-333 MS of Pile Cap Abutment A1.pdf
11/7/201928722872 SMC4-AD-100 As Built Drawing of Pre Tensioning Pre Stressed Super T Girder of Span 14 (P13-P14).pdf
11/7/201928732873 SMC4-AD-101 As Built Drawings of Pre Tensioning Pre Stressed Super T Girder of Span 15 (P14-P15).pdf
11/7/201928742874 SMC4-MA-589 Report on Frequency Test of Materials for Cement Concrete at Asean BP(23rd to 25th).pdf
11/7/201928752875 SMC4-MA-590 Report on Frequency Test of Material for Cement Concrete at Transmeco BP(45-48th) & Updated Result of Cement R28 (44th).pdf
11/7/201928762876 SMC4-MA-591 Report on Frequency Test of Materials for Cement Concrete at Viet Tiep BP(16-19th)& Updated FT of Cement R28 (13-15th).pdf
11/8/201928772877 SMC4-LC-874 Request for the Engineer's Instruction on Transtation & Installation of Steel Pier Head of Pier P18.pdf
11/8/201928782878 SMC4-LP-58 Clarification of Arrangement of HDPE Corrugate Conduit for ITS System in the Median Barrier on the Bridge.pdf
11/8/201928792879 SMC4-MS-335 Permission for Circulation of Vehicles to Transport Overlength Cargo on Road ( Transportation of Steel Pier Head).pdf
11/9/201928802880 SMC4-MA-584 Report on Frequency Test of Reinforcing Steel VIS for CIP Concrete Pile at Abutment A1( MoC&TS dated 3 Nov 2019).pdf
11/9/201928812881 SMC4-MA-585 Report on Frequency Test of Reinforcing Steel VGS for Deck Slab & Diaphragm S54-S61, Link Slab P53-P61 ( MoC&TS dated 1 Nov 2019).pdf
11/8/201928822882 SMC4-LC-876 Engineer's Confirmation for Safety & Environment Satisfaction ( Oct 2019).pdf
11/8/201928832883 SMC4-LC-875 Reply to the Engineer's Request for Implementation of Conclussion by MOT's Inspection Team on Environment Protection.pdf
11/8/201928842884 SMC4-MS-336 Supplement Method Drawing for Pier Head Construction at P55.pdf
11/8/201928852885 SMC4-MS-337 Method Drawing for Erection of Super T Girder at Spans S15 (P14-P15) & S14 9P13-P14).pdf
11/8/201928862886 SMC4-MS-338 Method Statement of Structure Excavation Pier P43C.pdf
11/9/201928872887 SMC4-LC-877 Submission of Weekly Report No.77.pdf
11/9/201928882888 SMC4-LC-878 Withdrawal of the letter LC-0874 dated 7 Nov 2019.pdf
11/9/201928892889 SMC4-MA-592 Notification on Transferring VGS for Pier Head of P10.pdf
11/9/201928902890 SMC4-MA-593 Report on Frequency Test of Reinforcing Steel VIS for Supet T Girder S41, S50 ( MoC& TS dated 30 Oct 2019).pdf
11/9/201928912891 SMC4-MA-594 Report on Friction Test of Galbon S-HB PZ L1 Paint of Hai Phong JSC for Steel Bridge.pdf
11/9/201928922892 SMC4-LC-879 Acceptance of Substructure Construction Stage & Transfer to Construction of Superstructure Work for P13.pdf
11/9/201928932893 SMC4-WD-429 WD of Structure Excavation for Abutment A1 (1st Revision).pdf
11/11/201928942894 SMC4-MS-316A MS of Structure Excavation Pier P43 (L-R).pdf
11/11/201928952895 SMC4-MS-339 Painting Method at Contact Surface of Bolted Connection with Filler Plate.pdf
11/11/201928962896 SMC4-MS-340 MS of Pier Column from P43-P45.pdf
11/11/201928972897 SMC4-WD-430 WD of Electric & Lighting -Gerneral View of Electric & Lighting for Expressway (1st).pdf
11/11/201928982898 SMC4-WD-431 WD of Structure Excavation for Pierr P43C (1st).pdf
11/11/201928992899 SMC4-WD-432 WD of Superstructure-Deck Slab for Span of S9 (1st).pdf
11/11/201929002900 SMC4-WD-433 WD of Detail of Pipe Culvert D500& & Catch Basin Type A (CB-A) under Viaduct Section A1-P61.pdf
11/11/201929012901 SMC4-AD-102 AD of CIP Concrete Pile D1.2m of Pier P43R.pdf
11/11/201929022902 SMC4-LC-880 Report on the Phenomenon & Treatment Solution for CIP Concrete Pile D1.2m-Pile No.8-P45.pdf
11/9/201929032903 3828-3745 PMUTL-DHDA1 Installation of Noise Barrier on PK1 & PK2.pdf
11/11/201929042904 SMC4-LC-881 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P43R.pdf
11/12/201929052905 SMC4-MA-595 Updated Profile Minute of Inspection of Ha Thanh Factory & The Testing Result of Drainage Pipe D500 Material of Ha Thanh Concrete JSC.pdf
11/12/201929062906 SMC4-LP-59 Notice of Actual Site Visit of Students & Lecturers of Transport & Communication University.pdf
11/12/201929072907 SMC4-LC-882 Notice of Claim for Extension of Time for Completion of Project & Addtional Cost Due to Design Modification for Off Ramp HQV-B.pdf
11/12/201929082908 SMC4-LC-883 Updated Organization Chart & Job Description of the Key Management & Key Personnel.pdf
11/12/201929092909 SMC4-LT-31 Updated Equipment of Site Laboratary LAS XD 668 Quality Verification for Asphalt Concrete Works.pdf
11/12/201929102910 SMC4-RP-118 Report on Excavation for Survey of Underground Utilities at MSE Wall & Concrete Wall Behind Abutment A1.pdf
11/12/201929112911 SMC4-MS-341 Report on Loading Test of Pier Head Supporting System at P47.pdf
11/12/201929122912 SMC4-AD-103 AD of Superstructure-Steel Bridge - Detail of Segment 15 - Rigid Pier Head P18.pdf
11/12/201929132913 SMC4-MS-340A-MS for Lower Part of Pier Head from P7-P8.pdf
11/13/201929142914 SMC4-MA-596 Report on Frequency Test of Reinforcing Steel VGS for Pier Column & Pier Head P53-P55( MoC&TS dated 02 Nov 2019).pdf
11/13/201929152915 SMC4-MA-597 Report on Frequency Test of Reinforcing Steel VGS Deck Slab S40, Parapet S40R, Diaphragm S40,Link Slab P35 P37R P38R & Conter Median S29,S30 ( MoC&TS dated 02 Nov 2019).pdf
11/20/201929162916 SMC4-MA-598 Report on Frequency Test of Welding Material- Welding Wire SF71( MoC&TS dated 14 Oct 2019) for Steel Bridge.pdf
11/13/201929172917 SMC4-LC-884 Capacity Profile of Subcontractor Hanoi Infrastructure & Culture Works Construction JSC.pdf
11/18/201929182918 SMC4-LC-885 Report on Environment Monitoring in Construction Stage, 1st Phase in Nov 2019 based on S1.43).pdf
11/12/201929192919 1351-GM-BGTVT Meeting on Treatment of Drainage Pipe D1250 of the Ministry of Public Security.pdf
11/14/201929202920 SMC4-MC-21 Interim Payment Certificate No.16 ( Peried 01 Oct 2019 to 31 Oct 2019).pdf
11/14/201929212921 SMC4-MA-600 Report on Frequency Test of Elastomeric Bearing by Kawakin Core Tech VN & Supplied THQ Global JSC.pdf
11/14/201929222922 SMC4-MA-601 Report on Frequency Test of Hai Phong Paint Material of Hai phng for Steel Bridge.pdf
11/14/201929232923 SMC4-MA-599 Proposal for Noise Barrier Manufacturered by Nippon & Suminkin-Supplied by Nam Anh.pdf
11/14/201929242924 SMC4-LC-886 Additional Machine Mobilization Document of Thanh Long JSC for Transportation of Steel Girder - 2nd.pdf
11/14/201929252925 SMC4-LC-887 Estimate Overall Schedule (without Off Ramp HQV-B).pdf
11/14/201929262926 SMC4-WD-434 WD of Parapet (Right Side) of Spans P27-P32.pdf
11/27/201929272927 SMC4-WD-435 WD of Detail of Catch Basin & U-ditch of Drainage System under Viaduct Section at P18-P25 (2nd).pdf
11/21/201929282928 SMC4-LC-891 Report of Phenomenon on the Surface of Pier Column P18 after Erection of Steel Pier Head.pdf
11/15/201929292929 SMC4-LC-888 Withdrawal of the Letter Regarding Profile of Subcontractor Hai Anh Company.pdf
11/15/201929302930 SMC4-LC-892 Unit Price Comparison Table for Design Change of Drainage Pipe Culvert D500.pdf
11/15/201929312931 SMC4-LC-890 Submission of Monthly Report No.18.pdf
11/15/201929322932 SMC4-MS-342 Report on Pre-Assembly of Segment 16 to 21 (G3+G4).pdf
11/15/201929332933 SMC4-LC-889 Submission of Weekly Report No.78.pdf
11/15/201929342934 SMC4-MS-343 Calculation of Tendon Cable Elonggation for Pier Head P10.pdf
11/15/201929352935 SMC4-MS-344 Method Drawing for Erection of Super T Girder at Span S41 (P40-P41).pdf
11/15/201929362936 SMC4-MS-345 MS for Lower Part of Pier Head P43-P45.pdf
11/15/201929372937 SMC4-MA-602 Characteristic Strength for Concrete Class G of Transmeco BP- Report 1 ( from 28 Nov 2018 to 21 Sep 2019).pdf
12/9/201929382938 SMC4-MS-301A Painting Method at Joint & High Strength Bolt.pdf
11/21/201929392939 SMC4-MS-320B MS for Diaphragms Construction from Abutment A1-P16.pdf
11/15/201929402940 SMC4-LC-893 Report on the Phenomenon & Treatment Solution for CIP Concrete Pile D1.2m-Pile No.8 of P45.pdf
11/15/201929412941 SMC4-LC-894 Reply to Engineer's Letter about the Contractor's Proposal for Installation of Crack Insdustion Joint on the A1 Abutment Wall.pdf
11/15/201929422942 SMC4-MS-346 Report on Loading Test of Pier Head's Supporting System at P55.pdf
11/15/201929432943 SMC4-WD-436 WD of Superstructure-Deck Slab for Span S8 & Link Slab P7 (1st).pdf
11/15/201929442944 10826-BGTVT-CQLXD Design Change to Raise Up Elevation of Pile Cap at Abutment A1.pdf
11/16/201929452945 SMC4-WD-437 WD of Structure Excavation for Pier P48.pdf
11/16/201929462946 SMC4-MS-347 MS of Structure Excavation Pier P48.pdf
11/16/201929472947 3980-PMUTL-DA1 Arrangement of HDPE Conduits in Central Median on Viaduct.pdf
11/19/201929482948 SMC4-LC-897 Report on Discovered Underground Drainage Pipe D1250 Near P43C.pdf
11/28/201929492949 SMC4-WD-438 WD of Median Barrier of Span P29-P30.pdf
11/19/201929502950 SMC4-MS-348 Report on Loading Test of Temporary Support TP12,TP13,TP14 (G3+G4) for steel girder erection.pdf
11/18/201929512951 3914 TB-BQLDATL Notice on Conclusions given by PMU Thang Long In the meeting to review the Implementation.pdf
11/19/201929522952 SMC4-WD-439 WD of the Elevation & Thickness of Deck Slab at Span S40 (P39-P40).pdf
11/19/201929532953 SMC4-WD-440 WD of Gegeral Layout of Noise Barrier (2nd ).pdf
11/30/201929542954 SMC4-MS-349 Method Drawing for Erection of Super T Girder at Span S13 (P12-P13).pdf
12/3/201929552955 SMC4-MS-350 MS of Structure Excavation for Abutment A1 ( Rev 03).pdf
11/19/201929562956 SMC4-LC-898 Plan for Connection of Drainage System at Started Point of Viaduct.pdf
11/25/201929572957 SMC4-LC-899 Capacity Profile of the Subcontractor Vonta Vietnam LTD.pdf
11/19/201929582958 SMC4-LC-896 Acceptance of Substructure Construction Stage & Transfer to Superstructure Work for P41.pdf
11/19/201929592959 SMC4-LC-895 Acceptance of Substructure Construction Stage & Transfer to Superstructure Work for P57.pdf
11/21/201929602960 SMC4-MA-603 Notification on Transfering VGS Steel for Use of Pile Cap, Column of Pier P44-P45.pdf
11/21/201929612961 SMC4-MA-604 Electrical Material of Vonta Limitted Company Lighting Pole 11m, 7m & Bolt.pdf
11/21/201929622962 SMC4-LC-898 Steel Bridge Schedule in November and December.pdf
11/21/201929632963 SMC4-AD-104 As-built Drawings of Pre-tensioning Pre-stressed Super-T Girder Span 58(P57-P58).pdf
11/21/201929642964 SMC4-AD-105 As-built Drawings of Pre-tensioning Pre-stressed Super-T Girder Span 41(P40-P41).pdf
11/22/201929652965 SMC4-WD-441 WD the Top Elevation of Parapet & Median Barrier at Spans S27(P26-P27) toS30 (P29-P30).pdf
11/22/201929662966 SMC4-MS-351 Supplement Method Drawing for Pier Head Construction at P49.pdf
11/22/201929672967 4035 PMUTL-DA1 Implementation of Working Minutes dated November 1,2019 between Widening Project and Viaduct Project.pdf
11/22/201929682968 SMC4-LC-901 Submission of Weekly Report No.79.pdf
11/22/201929692969 SMC4-LC-902 Result of Ultrasonic Test of CIP Concrete Pile at Abutment A1.pdf
11/22/201929702970 SMC4-LC-903 Result of Ultrasonic Test of Additional CIP Concrete Pile at P48.pdf
11/22/201929712971 SMC4-LC-904 Submission of Video CD No.3 (6 Months Period from May to Oct 2019).pdf
11/22/201929722972 SMC4-LC-442 WD of Deck Slab Spans 54, 57, 58 (2nd).pdf
11/22/201929732973 SMC4-WD-443 WD of Deck Slab Span 49, 50, 53 (2nd).pdf
11/28/201929742974 SMC4-WD-444 WD of Parapet Right Side Span P27-P32 (2nd).pdf
11/28/201929752975 SMC4-WD-445 WD of Parapet (Left Side) of Spans P27-P32 (2nd).pdf
11/22/201929762976 SMC4-LC-905 Report on Ultrasonic Test of Concrete Surface of Pier Column P18.pdf
11/23/201929772977 SMC4-MA-605 Test Result of Material for MSE Retaining Wall System Include Start Bar, Lifting, Insert, Bearing Pads.pdf
11/23/201929782978 SMC4-AD-106 AD of CIP Concrete Pilling D1.2m of Pier P44.pdf
11/25/201929792979 SMC4-MA-606 Report on Frequency Test of Reinforcing Steel VIS Bar for Super T Girder of Span S8 ( MoC& TS dated 22 Nov 2019).pdf
11/25/201929802980 4004-QD-BQLDATL Decision on the Appproval of Adjustment Design to Increase Elecation of A1 Abutment under PK1.pdf
11/26/201929812981 SMC4-AD-107 As-Built Drawings of Pre-Tensioning Pre-Stressed Super T Girder of Span 12 (P11-P12).pdf
11/26/201929822982 SMC4-AD-108 As-Built Drawings of Pre-Tensioning Pre-Stressed Super T Girder of Span 13 (P12-P13).pdf
12/9/201929832983 SMC4-WD-447 Working Drawing of Parapet of Spans P23-P27.pdf
11/26/201929842984 SMC4-WD-446 WD of Detail for Catch Basin & U-Ditch of Drainage System under Viaduct Section P26-P34.pdf
11/26/201929852985 SMC4-MS-352 MS of Deck Slab Construction from A1-P16.pdf
11/26/201929862986 SMC4-MS-353 Report on Loading Test of Pier Head's Supporting System at P51.pdf
11/26/201929872987 SMC4-LC-908 Notice of Equipment Demobilization- Crane Kolbeco 7055 & Excavator Komasu PC-200 at P7 Area under Scope of Co.407.pdf
12/10/201929882988 SMC4-LC-909 Report on Environment Monitoring in Construction Stage 2nd Phase in Nov 2019 based on S1.43.pdf
11/26/201929892989 SMC4-LC-910 Supplement of 5 Permits from DRVN from 9 Nov to 2 Dec, from 20 Nov to 20 Dec, from 28 Nov to 11 Dec, from 23 Nov to 23 Dec 2019.pdf
11/26/201929902990 SMC4-LC-906 Acceptance of C.I.P Concrete Pile Foundation Construction Stage & Transfer to Construciton of Substructure Work for P44.pdf
11/26/201929912991 SMC4-LC-907 Acceptance of Sub-Structure Construction Stage & Transfer to Construction of Superstructure Work for P12.pdf
11/26/201929922992 18-CDECE-KHHIV-MDNTL Plan on the Implementation of HIV-AIDS Prevention Program on Dec 2019.pdf
11/26/201929932993 MOT Invitation.pdf
11/26/201929942994 Addendum No.03.pdf
11/27/201929952995 SMC4-LC-911 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for P45.pdf
11/27/201929962996 SMC4-AD-109 AD of CIP Concrete Piling D1.2m of P45.pdf
11/27/201929972997 SMC4-MS-354 MS for Painting of Concrete Surface for Abutment & Pier.pdf
11/27/201929982998 SMC4-MS-355 MS of Structure Excavation Pier P43C (2nd).pdf
11/27/201929992999 SMC4-MS-356 MS of Pile Cap P43C.pdf
11/27/201930003000 SMC4-LC-912 Report on Discovering a Tomb at P44.pdf
11/28/201930013001 SMC4-WD-448 WD of Elevation & Thickness of Deck Slab at Spans S4 (P13-P14), S15 (P14-P15), S59 (P58-P59).pdf
11/28/201930023002 SMC4-WD-449 WD of Deck Slab for Span S7 (1st).pdf
11/28/201930033003 SMC4-LC-898A Result of Tip Contact Checking Test of CIP Pile C5-P48.pdf
11/28/201930043004 SMC4-LC-899A Result of Tip Contact of Concrete Pile C5-P44.pdf
12/10/201930053005 SMC4-WD-450 WD of General Layout of Drainage System Km0+400-Km2+812.50(1st Rev).pdf
11/29/201930063006 SMC4-MA-608 Notification on Trasnfering VGS steel for Link Slab P35.pdf
11/29/201930073007 SMC4-MA-609 Notification on Transferring VGS steel for Deck Slab, Diaphragm S12-S15.pdf
11/29/201930083008 SMC4-MA-610 Notification on Transferring VGS for the Use of Pier Head of P9.pdf
11/29/201930093009 SMC4-MA-611 Notification on Transferring VGS for Pile Cap,. Pier Column, Pier Head of P42, P43.pdf
11/29/201930103010 SMC4-MA-612 Submission of Updated Profile of Paraweb Strip Material.pdf
11/29/201930113011 SMC4-RP-119 Report on Loading Test of Pier Head Supporting System at P49.pdf
11/29/201930123012 SMC4-MS-353A MS for Diaphargm Construction from Pier P40-P44.pdf
11/29/201930133013 SMC4-WD-451 WD of Substructure - Design Changed Abutment A1.pdf
11/29/201930143014 SMC4-WD-452 WD of Design Change of CIP Concrete Pile for Abutment A1 (1st).pdf
11/29/201930153015 SMC4-WD-453 WD of Structure Excavation for Abutment A1 (1st Rev-2nd).pdf
11/29/201930163016 SMC4-WD-454 WD of Detail of Noise Barrier.pdf
11/29/201930173017 SMC4-WD-455 WD of Substructure - Design Changed Pile Cap of Abutment A1.pdf
11/29/201930183018 SMC4-WD-456 WD of Median Barrier of Spans P27-P29.pdf
11/30/201930193019 SMC4-MA-607 Report on Frequency Test of Reinforcing Steel VIS for Super T Girder Span S46 (MoC&TS dated 22 Nov 2019).pdf
11/30/201930203020 SMC4-LC-913 Report on Results of Pile Head Treatment Work for Pile No.8 P45.pdf
12/2/201930213021 SMC4-MS-353B Report on Loading Test of Pier Head's Supporting System at P9.pdf
11/30/201930223022 SMC4-LC-914 Notice of Environmental Monitoring in Dec 2019 at Construction Phase.pdf
11/30/201930233023 SMC4-MS-357 Method Statement of Abutment A1 Column.pdf
11/30/201930243024 SMC4-MS-358 Method Statement of Pile Cap Pier P48.pdf
11/30/201930253025 SMC4-LC-915 Engineer's for Safety & Environment Satisfaction (1st -30th Nov , 2019.pdf
12/2/201930263026 SMC4-MC-22 Interimpayment Certificate No.17 ( Period 1st Nov 2019 to 30th Nov 2019).pdf
12/2/201930273027 SMC4-RP-120 Report on the Result of MSE Panel Trial Fabrication.pdf
12/2/201930283028 SMC4-AD-110 AD of CIP Concrete Pile P48.pdf
12/2/201930293029 SMC4-LC-918 Additional Supervision Cost of Engineer'Staff (Sep 2019).pdf
12/2/201930303030 SMC4-MS-359 Supplement for Calculation of Tendon Cable Elongation of Pier Head P44-P57.pdf
12/2/201930313031 SMC4-LC-917 Submission of Weekly Report No.80.pdf
12/2/201930323032 SMC4-LC-916 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction Work for P48.pdf
12/4/201930333033 SMC4-WD-457 WD of Detail of Catch Basin & U Ditch of Drainage System under Viaduct P11-P17.pdf
12/4/201930343034 SMC4-WD-458 WD of Substructure - Approach Slab of Abutment A1.pdf
12/4/201930353035 SMC4-MS-360 Calculation of Tendon Cable Elongation for Pier Head P9.pdf
12/5/201930363036 SMC4-MA-613 Report on Frequency Test of Reinforcing Steel VGS for Pile Cap Pier Column Pier Head of P32, P43, P50 ( MoC& TS da
12/5/201930373037 SMC4-MA-614 Report on Frequency Test of Reinforcing Steel VGS for Deck, Link Slab Span P41, Pile Cap Pier Column & Pier Head P
12/5/201930383038 SMC4-WD-459 WD of Superstructure-Deck Slab for Span S44 (1st).pdf
12/6/201930393039 SMC4-LC-920 Acceptance of Substruction Construction Stage & Transfer to Construction of Next Stage Steel Structure Work for P
12/7/201930403040 SMC4-LC-919A Submission of Weekly Report No.81.pdf
12/9/201930413041 SMC4-LC-868A Acceptance of Substructure Stage & Transfer to Construction of Next Stage Steel Structure Work for P18.pdf
12/17/201930423042 SMC4-MA-615 Using Non-Woven Geotextile Vietnam Geotextile JSC for Mechanical Stabilized Earth (MSE) Retaining Wall.pdf
12/6/201930433043 SMC4-MA-616 Report on Supplementary & Completion of Remainings of the Asphalt Concrete BP.pdf
12/6/201930443044 SMC4-LC-922 Report on Environment Monitoring in Construction Stage 3rd in Nov 2019 ( Base on S1.43).pdf
12/6/201930453045 SMC4-LC-923 Submission of Construction Schedule of Dec 2019.pdf
12/6/201930463046 SMC4-AD-111 AD of CIP Concrfete Piling D1.2m of P43C.pdf
12/6/201930473047 SMC4-MS-362 MS of Deck Slab Construction from P40-P44.pdf
12/6/201930483048 SMC4-MS-361 MS for Pier Head Construction of Pier Head & Outline of the Loading Test of Pier Head's Supporting System from P44
12/7/201930493049 SMC4-LC-924 Acceptance of Substructure Constructure Stage & Transfer to Construction of Superstructure Work for P56.pdf
12/7/201930503050 SMC4-LC-925 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for
12/7/201930513051 SMC4-MA-619 Report on Frequency Test of Materials for Cement Concrete at Viet Tiep BP (2-thto21th) & Updated Frequency Test of
12/7/201930523052 SMC4-MA-620 Report on Frequency Test of Material for Cement Concrete at ASEAN BP (26th to 27th) & Updated Result of Cement R28
12/7/201930533053 SMC4-MA-621 Report on Frequency Test of Manterial for Cement Concrete at Transmeco BP(49th to 50th) & Updated Result of Cement
12/7/201930543054 SMC4-WD-460 WD of General Layout of Parapet& Barrier (for Main Bridge) (1st Rev).pdf
12/7/201930553055 SMC4-WD-461 WD of Parapet of Spans P19-P23.pdf
12/7/201930563056 SMC4-WD-462-WD of Detail of Expansion Joint (for Main Bridge) (3rd).pdf
12/7/201930573057 SMC4-MS-363 Method Drawing for Erection of Super T Girder at S47 (P46-P47), S54 (P53-P54), S57 (P56-P57).pdf
12/7/201930583058 SMC4-LC-927 Resubmission of Schedule for Steel Bridge (3rd).pdf
12/7/201930593059 SMC4-MA-617 Report on Frequency Test of Reinforcing Steel VGS for Pier Head P7, P8, P45, A1- Deck Slab Diaphragm S12-S15, MSE
12/7/201930603060 SMC4-MA-618 Report on Frequency Test of Reinforcing Steel VGS for Pier Column Pier Head of P44, P45-Diaphargm S47- Parapet of
12/7/201930613061 SMC4-MA-622 Report on Frequency Test of Reinforcing Steel VGS for Diaphragm S54-S61, Parapet S19R-S30R (MoC&TS dated 02 Dec 20
12/7/201930623062 SMC4-MA-623 Report on Frequency Test of Reinforcing Steel VGS for Super T Girder of Span S54-S58 (MoC&TS dated 3 Dec 2019).pdf
12/7/201930633063 SMC4-MA-624 Report on Frequency Test of Organic Zinc Rich Paint (Epicon Zinc HB2) of High Tensile Bolt for Steel Bridge ( Date
12/7/201930643064 SMC4-MA-625 Characteristic Strength for Concrete Class C of ASEAN BP (new Location) - Report 3(3-31 Oct 2019).pdf
12/7/201930653065 SMC4-MA-626 Characteristic Strength for Concrete Class C of Transmeco BP- Report 9 (1-31 Oct 2019).pdf
12/7/201930663066 SMC4-MA-627 Characteristic Strength for Concrete Class Y of Viet Tiep BP (New Location) - Report 3 (2-25 Oct 2019).pdf
12/7/201930673067 SMC4-MA-628 Characteristic Strength for Concrete Class B of Transmeco BP- Report 3 (1-30 Oct 2019).pdf
12/7/201930683068 SMC4-MA-629 Characteristic Strength for Concrete Class A of Viet Tiep BP (New Location) - Report 5 (1-31 Oct 2019).pdf
12/7/201930693069 SMC4-MA-630 Characteristic Strength for Concrete Class C of Viet Tiep BP- Report 3 (4-31 Oct 2019).pdf
12/7/201930703070 SMC4-LC-928 Equipment Mobilization Document for the Work Scope of 422 Co..pdf
12/9/201930713071 SMC4-MA-631 Report on Frequency Test of Shear Stud Connector for Steel Bridge Taking Sample dated 26 Oct 2019 & Testing Dated
12/9/201930723072 SMC4-MA-632 Material-Reinforced Concrete Pipes D400, Precast Bearing D400, D500, Dicth U, Catch Basin Used for Drainage System
12/9/201930733073 SMC4-LC-926 Acceptance of Substructure Construction Stage & Transfer to Construction of Superstructure Work for P46.pdf
12/9/201930743074 SMC4-LC-929 Acceptance of substructure Constructure Stage & Transfer to Construction of Superstructure Work for P47.pdf
12/9/201930753075 SMC4-AD-112 AD of CIP Concrete Piling D1.2m of P32L.pdf
12/9/201930763076 SMC4-AD-113 AD of Super T Girder Span 47 (P46-P47).pdf
12/9/201930773077 SMC4-WD-463 WD of Superstructure - Deck Slab for Span S45 (1st ).pdf
12/9/201930783078 SMC4-MS-364 Girder Transportation to Site.pdf
12/10/201930793079 SMC4 -MA-633 Frequency Test of Reinforcing Steel VIS for Super T Girder of Span S7 (MoC&TS dated 30 Nov 2019).pdf
12/10/201930803080 SMC4-MC-23 Application for Retention Money Payment ceritificate(Period 11.5.18-20.11.19).pdf
12/10/201930813081 SMC4-LC-932 Proposal for Approval of Capacity Profile of Subcontractor Nam Anh Technology construction Equipment Co.,ltd.pdf
12/10/201930823082 SMC4-MS-360A Report on Loading Test of Pier Head's Supporting System at Pier P54.pdf
12/10/201930833083 SMC4-MS-364A MS for Construction of Pier Head & Outline for Loading Test of Pier Head's Supporting System from P7-P8.pdf
12/23/201930843084 SMC4-MS-365 Resubmission of MS of Mock Up for SCC Deck Slab.pdf
12/10/201930853085 SMC4-MS-366 Resubmission of MS of Pile Cap Abutment A1 (2nd Rev).pdf
12/10/201930863086 SMC4-WD-464 WD of Backfill for Abutment A1 and Piers P43C, P48 (1st Rev).pdf
12/10/201930873087 SMC4-MA-634 Use Aggregate Subbase Course Type II Dmax-37.5mm for Subgrade Material.pdf
12/10/201930883088 SMC4-LC-930 Report on Grouting Work at the Pile No.5 P43C.pdf
12/11/201930893089 SMC4-LC-933 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for
12/11/201930903090 SMC4-MA-635 Report on Frequency Test of PC Strand of Epoxy Coated PC Strand (12th) Zhemao LTD Used for Pier Head.pdf
12/11/201930913091 SMC4-LC-931 Summary Table of Waste Disposal Implemented by the Subcontractors at Nguyen Khe from July.pdf
12/11/201930923092 SMC4-LC-919 Submission of Monthly Report No.19.pdf
12/11/201930933093 SMC4-AD-115 AD of CIP Concrete Pilling D1.2m of Abutment A1.pdf
12/11/201930943094 SMC4-AD-114 AD of Pre Tesioning Pre Stressed Super T Girder Span 57 (P56-P57).pdf
12/11/201930953095 SMC4-LC-934 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for
12/12/201930963096 SMC4-MA-636 Electrical Material of Vonta LTD - HDPE Conduit Pipe.pdf
12/12/201930973097 SMC4-MA-637 Manufacturer & Supplier of Deck Drain Box Trash Rack, Supporting & Steel Gutter.pdf
12/12/201930983098 SMC4-MA-638 Capacity Profile of Supplier & Manufacturer of Angle Steel for Positioning Transverse Rib of SCC Deck Slab Steel B
12/12/201930993099 SMC4-MS-367 Method Drawing for Erection of Super T Girder at Span S42 ( P41-P42).pdf
12/12/201931003100 SMC4-WD-465 WD the Top Elevation of Parapet & Median Barrier at Spans S21(P20-P21) to S26 (P25-P26).pdf
12/12/201931013101 818-CQLXD-DB1 Report on Results of Site Inspection at the HRR3 Construction Project MDSTL Section.pdf
12/13/201931023102 SMC4-LC-935 Notice for Leave for Key Personnel (Project Manager).pdf
12/13/201931033103 SMC4-LC-936 Report on Environment Monitoring In Construction Stage 1st Time in Dec 2019 Based on S1.43.pdf
12/13/201931043104 SMC4-WD-470 WD of Detail of Catch Basin & U Ditch of Drainage System Under Viaduct Section P35-P41.pdf
12/13/201931053105 SMC4-WD-469 WD of Miscellaneous Parapet of MSE Wall (1st).pdf
12/13/201931063106 SMC4-WD-468 WD of Median Barrier of Span P19-P23.pdf
12/13/201931073107 SMC4-WD-467 WD of Elevation & Thickness of Deck Slab at Span S41 (P40-P41), S58 (P57-P58).pdf
12/13/201931083108 SMC4-WD-466 WD of Median Barrier of Spans P23-P27.pdf
12/13/201931093109 SMC4-LC-747A Report of Crack Phenomenon on Pier Column of the Pier P25.pdf
12/16/201931103110 SMC4-LC-939 Cost Estimate of Structure Excavation Item.pdf
12/16/201931113111 SMC4-MS-368 Resubmission of MS of Steel Girder Erection 92nd).pdf
12/16/201931123112 SMC4-AD-116 AD of Pre Tensioning Pre Stressed Super T Girder of Span 42 (P41-P42).pdf
12/16/201931133113 SMC4-MA-642 Report on Frequency Test of PC Strand for Super T Girder (36th).pdf
12/20/201931143114 SMC4-MA-640 Report on Frequency Test of Galbon S-HB PZ L1 of Hai Phong Paint JSC ( Sampling 22 Nov 2019).pdf
12/16/201931153115 SMC4-MA-639 Material-Reinforced Concrete Pipe D400, Precast Bearing D400, D500 Used for Drainage System of Ha Thanh Concrete J
12/16/201931163116 SMC4-MA-641 Additional Submission of Manufacturer of Bridge Expansion Joints.pdf
12/16/201931173117 SMC4-LC-938 Withdrawal of letter SMC4-MA-0632 dated 7Dec2019.pdf
12/16/201931183118 SMC4-LC-937 Notice on New Year Holiday Schedule of the Contractor.pdf
12/16/201931193119 SMC4-WD-471 Changing L40x40x5mm Type Shaped Steel to L50x50x5mm of SCC Seck Slab.pdf
12/16/201931203120 SMC4-WD-472 Calculation Sheet of Camber of Steel Girder (1st Rev).pdf
12/16/201931213121 SMC4-MS-369 MS for Drainage System Under Bridge.pdf
12/16/201931223122 SMC4-MS-370 MS for Construction MSE Wall.pdf
12/16/201931233123 SMC4-LC-940 Notice of Equipment Demobilization - Crawler Crane Hitachi KH180-3 at P49 Area Under Scope of BOT Vinh City Bypass
12/16/201931243124 SMC4-LC-941 Notice of Equipment Demobilization - Drilling Machine Crane Kobelco 7055 at P32 Area Under Scope of 423.pdf
12/16/201931253125 SMC4-LC-942 Notice of Equipment Demobilization - Crane Kato (037LA-0293) at P55 Area Under Scope of 479 Co..pdf
12/16/201931263126 SMC4-MC-24 Submission of Retention Money Security for Retention Money Certificate ( Period 11th May 2018 to 30th Nov 2019).pdf
12/17/201931273127 SMC4-MA-643 Report on Frequency Test of VIS Steel for Super T Girder Span S43, S46 (MoC &TS dated 04th Dec 2019).pdf
12/17/201931283128 SMC4-LC-944 Cost Estimate for Design Modification of Relocation of Abutment A1.pdf
12/17/201931293129 SMC4-LC-943 Submission of Weekly Report No.82.pdf
12/20/201931303130 SMC4-RP-121 Updated Data of Topographic Survey at Section Km0+320-Km0+840.pdf
12/20/201931313131 SMC4-MA-642A Report on Frequency Test of PC Strand for Super T Girder ( 37th).pdf
12/17/201931323132 SMC4-LC-945 Acceptance of Sub Structure Construction Stage & Transfer to Construction of SuperStructure Work for P42.pdf
12/18/201931333133 18-CDECE-BCHIV-MDNTL Report on the Implementation on Dec 2019 HIV-AIDS Prevention Program for HCRR3 Construction Project MDSTL
12/18/201931343134 SMC4-LP-60 Submission of Retention Money Security for Retention Money Payment Certificate ( Period 11th May 2018 to 30th Nov 2
12/18/201931353135 SMC4-MS-371 Report on Loading Test of Pier Head's Supporting System at Pier P50.pdf
12/18/201931363136 SMC4-MS-372 MS for Fabrication of U Ditch.pdf
12/18/201931373137 SMC4-WD-473 WD of Parapet of Spans P32-P36.pdf
12/18/201931383138 SMC4-LC-946 Report on Phenomenon of Gaps under Elastomeric Bearings & Treatment Method.pdf
12/18/201931393139 SMC4-LC-947 Arrangement of HDPE Corrugate Conduit for ITS System in the Median Barrier on the Bridge.pdf
12/18/201931403140 SMC4-LC-948 Execute Fabrication of Transparent Panel (Polycarbonate ) & Install the Embeded Anchor Bolts for Noise Barrier Ite
12/19/201931413141 SMC4-WD-474 WD of Detail for Catch Basin & U Ditch of Drainage System under Viaduct Section P50-P61.pdf
12/19/201931423142 SMC4-WD-475 WD of Parapet of Span P11-P16.pdf
12/19/201931433143 SMC4-WD-476 WD of Parapet of Span P36-P40.pdf
12/19/201931443144 SMC4-LC-949 Additional Supervision Cost of Engineer's Staff (Oct 2019 ).pdf
12/19/201931453145 SMC4-MS-373 Report on Loading Test of Pier Head's Supporting System at Pier P7.pdf
12/19/201931463146 SMC4-MS-374 Report on Loading Test for Supporting System at P17.pdf
12/19/201931473147 SMC4-LC-950 Installation of Crack Induction Joint on A1 Abutment Wall.pdf
12/19/201931483148 SMC4-MA-644 Testing Result of Anchor Bolt D25(M24) of Viet Thang Co.Ltd.pdf
12/19/201931493149 SMC4-MA-645 Electrical Material of Vonta Co.-Luminaires Material.pdf
12/20/201931503150 SMC4-LC-951 Reply to the Engineer's Letter ENG-PK1-1084-1.37 dated 13 Dec 2019 Regarding Reminder on Submission of Outstanding
1/4/202031513151 SMC4-WD-477 Scope of Geotextile Layout for the Pavement Structure of the Expressway in MSE Wall.pdf
12/19/201931523152 12034 BGTVT-CQLXD Strengthening quality control,progress and Labor safety.pdf
12/21/201931533153 SMC4-LC-952 Submission of Weekly Report No.83.pdf
12/24/201931543154 SMC4-LC-953 Report on Environment Monitoring in Construction Stage Dec 2019 (Base on EMP).pdf
12/21/201931553155 SMC4-LC-954 Report on Environment Monitoring in Construction Stage 2nd time in Dec 2019 Based on S1.43.pdf
12/21/201931563156 SMC4-LC-955 Additional Equipment Mobilization Document for Superstructure Work under Scope of 407 Co..pdf
12/30/201931573157 SMC4-LC-956 Additional Equipment Mobilization Document for Construction of Parapet Work at P32-P47 under Scope of 414 Co..pdf
12/25/201931583158 SMC4-MA-646 Report on Trial Mix of Concrete Class D (250Mpa) for Reinforced Concrete Pipes of Ha Thanh JSC.pdf
12/21/201931593159 SMC4-WD-478 WD of Median Barrier of Spans P19-P23 (2nd).pdf
12/21/201931603160 SMC4-WD-479 WD of Median Barrier of Span P23-P27 (2nd).pdf
12/23/201931613161 SMC4-LP-61 Supporting the Contractor on Getting Permission for the Method of Fencing, Traffic Control at Project.pdf
1/8/202031623162 SMC4-MS-375 Loading Test Outline Support System TP2-4, TP6-10, TP12-14 (G1+G2) for Steel Girder Erection.pdf
12/23/201931633163 SMC4-MS-376 Permission for Circulation of Vehicles to Transport Overlength Cargo on Road (Transportation of Steel Pier Head).p
12/23/201931643164 SMC4-LC-957 Report on Incident of Broken Underground Information Cables During the Construction of the MSE Wall.pdf
12/23/201931653165 SMC4-MS-377 Supplement of Method Drawing for Erection of Pre Tensioning Pre Stress Super T Girder Span S42 (P41-P42).pdf
12/24/201931663166 SMC4-WD-480 WD of Median Barrier of Spans P32-P36.pdf
12/24/201931673167 SMC4-WD-481 WD of Median Barrier of Spans P11-P16.pdf
12/23/201931683168 SMC4-LC-959 Acceptance of Sub Structure Construction Stage & Transfer to Constructiron of Superstructure Work for P55.pdf
12/24/201931693169 2726-LD-TM Coordination with Bridge 205 in Settlement of Breakage of Army Communication Cable at No.16 PVD Street.pdf
12/25/201931703170 SMC4-WD-482 WD of Detail for Catch Basin & U-Ditch of Drainage System under Viaduct Section A1-P10.pdf
12/28/201931713171 SMC4-WD-483 WD of Substructure- Design Change of Body Wall, Head Wall & Wing Wall of Abutment A1 (2nd).pdf
12/25/201931723172 SMC4-WD-484 WD of Detail of Deck Drain Box.pdf
12/25/201931733173 SMC4-WD-485 WD of Parapet & Median Barrier of Spans P57-P61.pdf
12/25/201931743174 SMC4-WD-486 WD of Median Barrier of Span P36-P40.pdf
12/25/201931753175 SMC4-MS-376A Calculation of Tendon Cable Elongation for Pier Head P7.pdf
12/25/201931763176 SMC4-MA-647 Report on Frequency Test of Paint Epicon Primer HB Brow & Epicon HB 300 Grey N7 of Hai Phong Paint JSC ( Sample 22
12/25/201931773177 SMC4-MA-648 Report on Frequency Test of Paint Umeguard SX Red Brow CS-511 & Umeguard SX Light Grey CS-614 of Hai Phong Paint J
3/27/202031783178 SMC4-MA-649 Test Result of Dong Anh Cold Reduce Steel Wire D4,D5 used for Drainage Pipes.pdf
12/25/201931793179 SMC4-RP-122 Supplement of 5 Permits from DRVN (fr 9Dec19 to 9 Jan2020, fr 13 Dec19 to 13 Jan 2020, fr 21 Dec19 to 21 Jan 2020,
12/26/201931803180 SMC4-MS-378 MS of Trial Excavation for MSE Wall.pdf
12/27/201931813181 SMC4-WD-487 WD of Detail for Catch Basin & U-Ditch of Drainage System Under Viaduct Section P42-P49.pdf
12/27/201931823182 SMC4-MS-379 MS for Construction of Noise Barrier.pdf
12/28/201931833183 SMC4-MA-650 Report on Frequency Test of Reinforcing Steel VGS for Parapet S36,S37,S38,S39 S40 Right Side ( M0C&TS dated 25 Dec
12/28/201931843184 SMC4-MA-651 Report on Frequency Test of Reinforcing Steel VGS for Pier Column & Pier Head P48, Parapet of Spans S34-S36 Left S
12/27/201931853185 SMC4-LC-961 Report on the Phenomenon of Gaps under Elastomeric Bearing & Treatment Method (2nd).pdf
12/27/201931863186 SMC4-MS-381 Report on Loading Test of Supporting System at Pier P8.pdf
12/27/201931873187 SMC4-MS-380 Report on Loading Test of Pier Head's Supporting System at P53.pdf
1/9/202031883188 SMC4-LC-963 Report on Completion of Eemedial Works for Concrete Surface of Pier Column P25.pdf
12/27/201931893189 SMC4-LC-964 Acceptance of CIP Concrete Pile Foundation Construction Stage & Transfer to Construction of Substructure Work for
12/27/201931903190 SMC4-WD-488 WD Top Elevation of Parapet & Median Barrier at Span S36 9P35-P36).pdf
12/27/201931913191 SMC4-AD-117 AD of CIP Concrete Pile D 1.2m of Pier P32R.pdf
12/27/201931923192 SMC4-LC-962 Submission of Weekly Report No.84.pdf
12/27/201931933193 SMC4-LC-965 Notice of Environmental Monitoring Schedule in Jan 2020 at Construction Phase.pdf
12/30/201931943194 SMC4-LC-966 Notice of EOT for the Comlpetion of the Project & Additional Cost Due to Design Modification for Off Ramp HQV-B.pd
12/30/201931953195 SMC4-MS-382 Calculation of Tendon Cable Elongation for Pier Head P8.pdf
12/30/201931963196 941-GM-SXD Invitation Letter-Attend a Meeting in order to Reach an Argrement on the Plan of Tree Cutting Pruning & Removing fo
1/2/202031973197 SMC4-MA-653 Report on Frequency Test of Reinforcing Steel VIS for Super T Girder of Span S44,S45 ( MoC& TS dated 28 Dec 2019).
12/31/201931983198 SMC4-LC-968-Suplement of the Documents for stage inspection to proceed next work.pdf
12/31/201931993199 SMC4-MA-652 Submission of the minute of checking asphalt concrete plant and updated calibration certificate equipment, materia
12/31/201932003200 SMC4-MA-654 Proposal for approval of Report on frequency test of PC Strand for SuperT Girder (38th time).pdf
12/31/201932013201 SMC4-MS-383 Submission of Method Statement for Anti-Glare Fence.pdf
12/31/201932023202 SMC4-MS-384 Method Statement of Traffic Control for Public Road-Arranging Traffic Control after Opening U-turn P56-P57.pdf
12/31/201932033203 SMC4-AD-118 As-Built Drawings of Superstructure - Steel Bridge - Detail of Segment 7 - Rigid Pier Head P17.pdf
12/31/201932043204 SMC4-AD-119 As-Built Drawings of Pre-Tensioning Pre-Stressed Super T Girder Span S56(P55-P56).pdf
12/31/201932053205 SMC4-MC-25 Interim Payment Certificate No.18(Period 01 st Dec 2019 to 31 st December 2019).pdf
12/31/201932063206 SMC4-LC-969 Engineer's Confirmation for Safety and Environment Satisfaction (Dec 01,2019 to Dec 31,2019).pdf
12/31/201932073207 SMC4-LC-970 Additional Equipment and Manpower Mobilization document for construction of Parapet work at P19-P28 under Scope of
12/31/201932083208 SMC4-MS-385 MS of Steel Girder Erection(3rd ).pdf
12/31/201932093209 SMC4-WD-489 WD of the Elevation and Thickness of Deck slab at Span S57(P56-P57).pdf
12/31/201932103210 SMC4-MA-655 Capacity Profile of Supplier and Manufacturer of Spange Rubber Packing for SCC Deck slab-steel Bridge Kien Kiet Ru
12/31/201932113211 SMC4-MS-886 Supplement of Method Drawing for Erection of Super T girder at Span S56(P55-P56).pdf
1/4/202032123212 SMC4-LC-971 Resubmission of Schedule for Steel Bridge (4th).pdf
1/4/202032133213 SMC4-LC-972 Submission of Weekly Report No.85.pdf
1/4/202032143214 SMC4-LC-973 Report on Environment Monitoring in Construction Stage (3rd in Dec 2019 based on S1.43).pdf
1/4/202032153215 SMC4-LC-974 Additional Equipment Mobilization Document for Construction of Superstructure Works at P32-P53 under Scope of 479
1/4/202032163216 SMC4-WD-490 WD of Parapet & Median Barrier of Spans P8-P11.pdf
1/4/202032173217 SMC4-WD-491 WD of Parapet & Median Barrier at Spans P53-P57.pdf
1/6/202032183218 SMC4-MS-387 MS for Traffic Control for Public Road at Section A1-P24- Vol VIII-Adjusted Arrangement TC at U turn P15-P16 Durin
1/6/202032193219 SMC4-WD-492 WD of Deck Slab Span 32.pdf
1/6/202032203220 SMC4-LC-975 Construction Schedule of Jan 2020.pdf
1/6/202032213221 SMC4-MS-388 Report on Loading Test of Pier Head's Supporting System at P44, P45.pdf
1/6/202032223222 SMC4-AD-120 AD of Substructure of Pier P28.pdf
1/6/202032233223 SMC4-AD-121 AD of Substructure of Pier P29.pdf
1/6/202032243224 SMC4-AD-122 AD of Substructure of Pier P30.pdf
1/7/202032253225 SMC4-MS-389 Supplement Method Drawing for Pier Head Construction at P48.pdf
1/7/202032263226 SMC4-MS-390 MS for Parapet of MSE Wall.pdf
1/7/202032273227 SMC4-WD-493 WD of Pipe Culvert D400, U Ditch & Catch Basin Section Retaining Wall.pdf
1/7/202032283228 SMC4-AD-123 AD of SuperT Girder Span 11 (P10-P11).pdf
1/7/202032293229 SMC4-LC-976 Notice of Demobilization of Crane Kobelco 7055 at P27 under Scope of 407.pdf
1/7/202032303230 SMC4-LC-977 Submission of the Contractor's Programme without Off Ramp HQV-B.pdf
1/7/202032313231 SMC4-LC-978 Countermeasures for the Delayed Progress of Steel Bridge Work.pdf
1/9/202032323232 SMC4-MA-656 Report on Frequency Test of Reinforcing steel-VGS for SuperT Girder of Span S54-S58 (MoC&TS dated 24 Dec 2019).pdf
1/9/202032333233 SMC4-MA-657 Report on Frequency Test of Reinforcing Steel-VGS for Pier Head P8, Body Wall, Head Wall, Wing Wall of Abutment A1
1/9/202032343234 SMC4-MA-658 Report on Frequency Test of Reinforcing Steel-VGS for Deck Slab & Diaphragm S54-S61; Link Slab P53-P61(MoC&TS date
1/8/202032353235 SMC4-LT-32 Capacity Profile of Las -XD 298 of ITST.pdf
3/2/202032363236 SMC4-MA-659 Trial Mix of Concrete Class C2 of Transmeco BP & Site Laboratary Las XD 668 & Proposal to Using Mix Proportion for
1/8/202032373237 SMC4-MA-660 Report on Frequency Test of VGS for Deck Slab, Parapet S41R, Diaphragm S42R, Link Slab P39R, Centre Median S21-S28
1/8/202032383238 SMC4-MA-661 Testing Result Chemical Composition of Dong Anh Cold Reduce Steel Wire D4,D5 Used for Drainage Pipes.pdf
1/8/202032393239 SMC4-MA-662 Characteristic Strength for Concrete Class C of Viet Tiep BP(new Location) - RP 4 (3-30 Nov 2019).pdf
1/8/202032403240 SMC4-MA-663 Characteristic Strength for Concrete Class B of Transmeco BP - RP 4 (1-30 Nov 2019).pdf
1/8/202032413241 SMC4-MA-664 Characteristic Strength for Concrete Class C of Asean BP (new Location) - RP 4 (3-29 Nov 2019).pdf
1/8/202032423242 SMC4-MA-665 Characteristic Strength for Concrete Class C of Transmeco BP - RP 10 (1-30 Nov 2019).pdf
1/8/202032433243 SMC4-MA-666 Characteristic Strength for Concrete Class A of Viet Tiep BP(new Location) - RP 6 (1-30 Nov 2019).pdf
1/8/202032443244 SMC4-MA-667 Characteristic Strength for Concrete Class Y of Viet Tiep BP(new Location)- RP 4 (1-11 Nov 2019).pdf
1/9/202032453245 SMC4-LC-979 Equipment & Manpower Mobilization Document of Subcontractor Thanh Long Group JSC for Erection of Steel Girder - 3
1/9/202032463246 SMC4-LC-980 Submission of Weekly Report No.86.pdf
1/9/202032473247 SMC4-RP-123 Report on Survey of Existing Utilities at Approach Road & MSE Wall Area.pdf
1/9/202032483248 SMC4-AD-124 As-Built Drawings of Substructure of Pier P58.pdf
1/9/202032493249 SMC4-AD-125 As-Built Drawings of Substructure of Pier P57.pdf
1/9/202032503250 SMC4-AD-126 As-Built Drawings of Substructure of Pier P27.pdf
1/9/202032513251 SMC4-AD-127 As-Built Drawings of Substructure of Pier P23.pdf
1/9/202032523252 SMC4-AD-128 As-Built Drawings of Substructure of Pier P24.pdf
1/7/202032533253 92 BGTVT-KHDT Authorization for Approval of Detailed design modification.pdf
1/8/202032543254 SMC4-LC-211 Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P54.pdf
1/9/202032553255 SMC4-MA-669 Report on Frequency Test of Reinforcing Steel-VIS Bar for U Ditch (MoC &TS dated 28 Dec 2019).pdf
1/9/202032563256 SMC4-MA-668 Report on Frequency Test of Reinforcing Steel-VGS for Pier Column & Pier Head of Pier P45, P48, Deck Slab Span S42
1/9/202032573257 SMC4-LC-982 Starting the Construction of Drainage System Under the Viaduct of Section A1-P10 & P19-P25.pdf
1/9/202032583258 SMC4-LC-981 Reply Letter & Withdrawal of the Submitted Letter Regarding Capacity Profile of Subcontractor - Nam anh Technology
1/9/202032593259 SMC4-MA-670 Report on Frequency Test of Bolts Material for Steel Bridge S10T (including Nut & Washer) Taking Sample dated 12 N
1/9/202032603260 81-SGTVT-QLKCHGT Suspension of Construction, Road Excavation in the Projects Located on HN City during Lunar Tet of Year of Ra
1/11/202032613261 SMC4-LC-983 Additional Supervision Cost of Engineer's Staff (Nov 2019).pdf
1/11/202032623262 SMC4-LC-984 Report on the Phenomenon of Crack on Concrete Surface Pier Columns.pdf
1/11/202032633263 SMC4-WD-494 WD of Road Work - Expressway from Km0+494.22-Km0+568.40 ( 1st Rev.).pdf
1/11/202032643264 SMC4-MS-391 MS of Trial Excavation for Drainage System under Bridge.pdf
1/11/202032653265 SMC4-AD-129 AD of Substructure of Pier P35.pdf
1/11/202032663266 SMC4-AD-130 AD of Substructue of Pier P25.pdf
1/11/202032673267 SMC4-AD-131 AD of Substructure of pier P26.pdf
1/11/202032683268 SMC4-LC-989 Acceptance of Substructure Construction Stage & Transfer to Construction of Superstructure Work for P49.pdf
1/11/202032693269 SMC4-LC-990 Acceptance of Sub-Structure Construction Stage & Transfer to Construction of Superstructure Work for P50.pdf
1/11/202032703270 SMC4-LC-985 Report on the Phenomenon of Cracks on the Stem Wall of Abutment A1.pdf
1/11/202032713271 SMC4-LC-986 Additional Equipment Mobilization Document of 1 Tractor & 2 Trailers for Transportation & Erection Work of Super T
1/11/202032723272 SMC4-LC-987 Machine Mobilization Document (Manlifting Machine) of Thanh Long JSC for Erection of Steel Girder (1st).pdf
1/11/202032733273 SMC4-AD-132 AD of Substructure of Pier P36.pdf
1/11/202032743274 SMC4-AD-133 AD of substructure of Pier P37.pdf
1/11/202032753275 SMC4-AD-134 AD of Substructure of Pier P22.pdf
1/11/202032763276 SMC4-AD-135 AD of Substructure of Pier P60.pdf
1/13/202032773277 SMC4-AD-136 AD of Substructure of Pier P21.pdf
1/11/202032783278 SMC4-LC-988 Supplement of Documents for Stage Inspection to Proceed Next Works.pdf
1/13/202032793279 SMC4-AD-137 AD of Substructure of Pier P20.pdf
1/13/202032803280 SMC4-AD-138 AD of substructure of pier P59.pdf
1/13/202032813281 SMC4-AD-139 AD of Substructure of Pier P17.pdf
1/13/202032823282 SMC4-AD-140 AD of Substructure of Pier P18.pdf
1/11/202032833283 SMC4-AD-141 AD of Substructure of Pier P14.pdf
1/13/202032843284 SMC4-AD-142 AD of Substructure of Pier P15.pdf
1/13/202032853285 SMC4-AD-143 AD of Substructure of Pier P38.pdf
1/13/202032863286 SMC4-AD-144 AD of Substructure of Pier P39.pdf
1/13/202032873287 SMC4-AD-145 AD of Substructure of Pier P40.pdf
1/13/202032883288 SMC4-WD-495 WD of Parapet & Median Barrier of Spans P49-P53.pdf
1/13/202032893289 SMC4-WD-496 WD of Median Barrier of Spans P30-P32.pdf
1/13/202032903290 SMC4-MS-392 Method Drawing for Erection of Super T Girder at Span S50.pdf
1/13/202032913291 SMC4-LC-970A Submission of Monthly Report No.20.pdf
1/22/202032923292 SMC4-MA-671 Report on Frequency Test of Materials for Cement Concrete at Viet Tiep BP (22nd to 23rd ).pdf
1/22/202032933293 SMC4-MA-672 Report on Frequency Test of Material for Cement Concrete at Transmeco BP ( 52th-54th).pdf
1/13/202032943294 SMC4-MA-673 Report on Frequency Test of Paint Epicon Primer HB Reddich Brown of Hai Phong Paint JSC (Sample 17Dec19).pdf
1/13/202032953295 SMC4-MA-674 Report on Frequency Test of Paint Galbon S-HB PZ L1 of Hai Phong Paint JSC (Sample 21 Dec19).pdf
1/13/202032963296 SMC4-MA-675 Report on Frequency Test of Paint Fluorex Finish Grey Ral 7035, Fruorex UnderCoat EP Grey Ral 7038 & Epicon Prime
1/13/202032973297 SMC4-MA-676 Update Profile of Noise Barrier Material Product Manufactured by Nippon Steel& Suminkin Metal supplied by Nam Anh
1/14/202032983298 SMC4-MA-677 Frequency Test of VGS to Use for Deck Slab & Parapet S42R, Center Median S35-S37 ( MoC&TS dated 4 Jan2020).pdf
1/14/202032993299 SMC4-MA-678 Frequency Test of VGS to Use for Deck Slab & Diaphragm S54-S61, Link Slab P53-P61 ( M0C& TS dated 3Jan2020).pdf
1/14/202033003300 SMC4-MA-679 Frequency Test of VIS to Use for Super T Girder of Span S54 (MoC & TS 2 Jan 2020).pdf
1/14/202033013301 SMC4-MA-680 Frequency Test of VGS to Use for Deck Slab & Diaphragm S55, S56 (MoC & TS 4 Jan 2020).pdf
1/14/202033023302 SMC4-MA-681 Frequency Test of VIS to use for Super T Girder of Span S32,S49 ( M0C&TS dated 7 Jan 2020).pdf
1/14/202033033303 SMC4-MA-682 Frequency Test of VGS to Use for Deck Slab & Diaphragm S7, S8,S13-S15, Body Wall, Head Wall & Wing Wall of Abutmen
1/14/202033043304 SMC4-LC-993 Notice on Schedule for Tet Holiday 2020.pdf
1/14/202033053305 SMC4-AD-146 AD of Pre Tensioning Pre Stressed Super T Girder Span 50 (P49-P50).pdf
1/14/202033063306 SMC4-MS-395 Relocation & Protection of Existing Utilities Document at Approach Road & MSE Wall Area (11st).pdf
1/14/202033073307 SMC4-MS-394 Supplement of Method for Erection of Super T Girder at Span S55 (P54-P55).pdf
1/14/202033083308 SMC4-MS-393 Calculation of Tendon Cable Elongation of Pier Head P43.pdf
1/14/202033093309 SMC4-RP-124 Report on Loading Test of Pier Head's Supporting System at P48.pdf
1/14/202033103310 SMC4-MA-683 Use Concrete Class C1,C3,C4 -30Mpa at Viet Tiep BP ( New Location) to change Concrete Class E-21 Mpa for Items U D
1/14/202033113311 SMC4-LC-991 Notice for Leave of Contractor Project Manager on 15Jan2020 - Mr Kytayama.pdf
1/14/202033123312 SMC4-LC-992 Notice for Leave of Contractor Project Manager during Tet Holiday- Mr Kytayama.pdf
1/14/202033133313 SMC4-MA-684 Testing Result of HDPE of Vonta Conduit- Vonta Co.Ltd.pdf
1/14/202033143314 SMC4-MA-685 Electrical Material of Vonta Co.LTD - Cable Pulling Box Material.pdf
1/22/202033153315 SMC4-MA-686 Report on Frequency Test of Materials for Cement Concrete at Asean BP (28th-29th).pdf
1/21/202033163316 SMC4-MA-687 Testing Result of Permeable Backfill Material (Cao Duong Quarry, Commune, Exploited by Hien Luong Mineral Exploita
1/14/202033173317 SMC4-LC-994 Reply to the Engineer for Assurance of Safety & Environment during Tet Holiday 2020.pdf
1/14/202033183318 SMC4-AD-147 AD of Super T Girder Span 55 (P54-P55).pdf
1/15/202033193319 SMC4-LP-62 VAT Invoices for Interim Payment Certificate No.13.pdf
1/15/202033203320 SMC4-LP-63 VAT Invoices for Interim Payment Certificate No.14.pdf
1/15/202033213321 SMC4-LP-64 VAT Invoices for Interim Payment Certificate No.15.pdf
1/15/202033223322 SMC4-LP-65 VAT Invoices for Interim Payment Certificate No.16.pdf
1/15/202033233323 SMC4-LP-66 VAT Invoices for Interim Payment Certificate No.17.pdf
1/15/202033243324 SMC4-LP-67 VAT Invoices for Interim Payment Certificate No.18.pdf
1/21/202033253325 SMC4-MS-396 MS for Construction Approach Slab of Abutment A1.pdf
2/11/202033263326 SMC4-MS-397 Method Statement for Construction of Road Work.pdf
1/15/202033273327 112-BQLDATL-DA1 Plan for Construction of HCRR3 Construction Project MD_STL Section during Lunar Tet 2020.pdf
1/18/202033283328 SMC4-MS-398 Resubmission of Permission for Circulation Vehicle to Transport Overlength Cargo on Road ( Transportation of Steel
1/18/202033293329 SMC4-MS-399 Report on Loading Test of Temporary Support TP12, TP13 (G1+G2), TP9 (G3+G4) for Steel Girder Erection.pdf
1/18/202033303330 SMC4-LC-995 Report on Environment Monitoring in Construction Stage (1st in Jan 2020 Based on.pdf
1/18/202033313331 SMC4-LC-996 Submission of Weekly Report No.87.pdf
1/18/202033323332 SMC4-WD-497 WD of Parapet & Median Barrier of Spans at P44-P49.pdf
1/18/202033333333 SMC4-AD-148 AD of Pre Tensioning Super T Girder of Span 10 (P9-P10).pdf
1/18/202033343334 SMC4-MA-688 Cable & Grounding Wire Electrical Material of Thuong Dinh Electrical Wires & Cables JSC & Supplied by Vonta Co.Ltd
1/18/202033353335 SMC4-MA-689 Electrical Material of Vestel Co.Ltd - Luminaires Material.pdf
1/18/202033363336 SMC4-MA-690 Capacity Profile of Supplier New Linh JSC for PVC Pipe Manufactured by Thuan Phat JSC.pdf
1/18/202033373337 SMC4-MA-691 Capacity Profile Vonta Co.Ltd for Material of Lighting Poel & Bolt(2nd).pdf
1/18/202033383338 SMC4-MA-692 Report on Frequency Test of Reinforcing Steel VGS for Pier Head P48, Deck Slab S42L-S44L, Link Slab P41L,P42L, Dia
1/18/202033393339 SMC4-MA-693 Test Result of Angle Steel of SCC Deck Slab- Steel Bridge Thai Nguyen Iron & Steel JSC.pdf
1/18/202033403340 SMC4-LC-997 Permission for Traffic Control of Steel Girder Erection.pdf
1/18/202033413341 SMC4-LC-988 Resubmission of Schedule for Steel Bridge (5th).pdf
1/18/202033423342 SMC4-MS-400 Report on Loading Test of Temporary Support TP14(G1+G2) for Steel Girder Erection.pdf
1/20/202033433343 SMC4-MS-401 Plan view of Method Statement for Cutting Removal & Relocation Trees from begin Point to P6.pdf
1/20/202033443344 SMC4-LC-999 Acceptance of Sub Structure Construction Stage & Transfer to Construction of SuperStructure Work for P10.pdf
1/20/202033453345 SMC4-LC-1000 Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P11.pdf
1/21/202033463346 SMC4-MA-694 Report on Frequency Test of Welding Material -Welding Wire SF71 (Taking Sample dated 7 Jan 2020).pdf
1/21/202033473347 SMC4-LC-1001 Proposal for Manpower Mobilization Document for Superstructure Work.pdf
1/21/202033483348 SMC4-LC-1002 Contractor's Confirmation on Scope of Work of Noise Barrier.pdf
1/21/202033493349 SMC4-WD-498 WD of Parapet of Span P32-P36 (1st Rev).pdf
1/21/202033503350 SMC4-LC-1003 Manpower Mobilization Document of VONTA Co.Ltd for Construction & Installation of Lighting System- 1st.pdf
1/21/202033513351 SMC4-LC-1004 Result Report on Preparation Work for Assurance of Safety, Security & Environmental for Coming Tet Holiday 2020.p
1/21/202033523352 SMC4-LC-1005 Report on Environment Monitoring in Construction Stage 2nd time in Jan 2020 (Based on S1.43).pdf
1/21/202033533353 SMC4-LC-1006 Notice of Environmental Monitoring Schedule in Feb 2020 at Construction Phase.pdf
1/21/202033543354 SMC4-WD-499 WD of Elevation & Thickness of Deck Slab S13(P12-P13), S42(P41-P42), S56(P55-P56).pdf
1/21/202033553355 SMC4-WD-500 WD of Electric & Lighting- Gerneral View of Electric Lighting & ITS System for Expressway ( 2nd).pdf
1/21/202033563356 SMC4-WD-501 WD of Painting for Steel Concrete Composite Deck Slab (1st).pdf
1/22/202033573357 185 TB-BQLDTL Notice on Conclusions given by PMU Thang Long in the Meeting to review the Implementation of Package 1 and Packa
2/4/202033583358 152 PMUTL-DA1 Design change of Drainage under Viaduct.pdf
2/4/202033593359 SMC4-MS-402 Report on Loading Test of Temporary Suport TP10 (G3+G4) for Steel Girder Erection.pdf
2/7/202033603360 SMC4-LC-1007 Additional Machine & Manpower Mobilization Document of Subcontractor Thanh Long Gr JSC for Transportation of Stee
2/7/202033613361 SMC4-LC-1008 Additional Equipment & Manpower Mobilization Document of 3 Truck Cranes of Subcontractor Thanh Long Gr JSC for Er
2/7/202033623362 SMC4-LP-68 Supporting Contractor on Getting Permission for Protection & Relocation of Underground Communication Cable & Draina
2/7/202033633363 SMC4-MS-403 Approval Document of Protection of Underground Communication Cable at Approach Road & MSE Wall Area (1st).pdf
2/8/202033643364 SMC4-MA-695 Used to Aggregate Sub Base Course Type II, Dmax = 37.5mm for SubGrade Material.pdf
2/8/202033653365 SMC4-LP-69 Proposal for PMU Thang Long's Support in Sending a Written Request to Bac Tư Liem Power Co, for Facilitation & Coor
2/7/202033663366 SMC4-LC-1009 Submission of Construction Schedule of Feb 2020.pdf
2/7/202033673367 SMC4-LC-1010 Withdrawal of the Letter MA-0634 dated 9 Dec19.pdf
2/7/202033683368 SMC4-LC-1011 Withdrawal of the Letter WD-0494 dated 9Jan 20.pdf
2/7/202033693369 SMC4-WD-502 WD the Top Elevation of Parapet & Median Barrier at Span S58(P57-P58), S61(P60-P61).pdf
2/10/202033703370 SMC4-LC-1012 Design Change of Connection of Drainage System Under Viaduct with Ring Road No.3 Widening Project & Drainage Pipe
2/10/202033713371 SMC4-WD-501A WD Top Elevation of Parapet & Median Barrier at Span S37( P36-P37).pdf
2/10/202033723372 SMC4-LC-1013 Explanation for the Engineer's Comments of Manpower Mobilization Document for Supporting Works.pdf
2/10/202033733373 SMC4-LC-1014 Report on Environment Monitoring in Construction Stage , 3rd Time in Jan 2020 (Based on S1.43).pdf
2/10/202033743374 SMC4-LC-1015 Submission of Weekly Report No.88.pdf
2/26/202033753375 SMC4-MA-696 Report on Frequency Test of PC Strand for Super T Girder (39th).pdf
2/10/202033763376 SMC4-MA-697 Report on Frequency Test of Paint for Steel Bridge of Hai Phong Paint JSC (Sample dated 3Jan20).pdf
2/10/202033773377 SMC4-MA-698 Update Profile of Noise Barrier Material Product Manufactured by Nippon Steel Metal, Supplied by Nam Anh CO.Ltd (2
2/10/202033783378 SMC4-MA-699 Report on Frequency Test of Angle Steel L75x75x9,L90x90x10 for Steel Bridge of Thai Nguyen JSC(Sample dated 9 Jan
2/10/202033793379 SMC4-MS-405 Report on Loading Test of Temporary Support TP6, TP7, TP8(G3+G4) for Steel Girder Erection.pdf
2/10/202033803380 SMC4-MS-406 Method Drawing for Erection of Super T Girder at S46 (P45-P46).pdf
2/11/202033813381 288-PMUTL-DA1 Reinstatement of Drainage Culvert D1250 for Office of Ministry of Public Security.pdf
2/12/202033823382 SMC4-MA-700 Submission Test Plan for Noise Barrier.pdf
2/12/202033833383 SMC4-MA-701 Report on Frequency Test of Materials for Cement Concrete at Viet Tiep BP (24th to 25th) & Updated R28 (23rd).pdf
2/12/202033843384 SMC4-MA-702 Report on Frequency Test of Materials for Cement Concrete at Asean BP (30th) & Updated R28 (29th).pdf
2/12/202033853385 SMC4-MA-703 Report on Frequency Test of Materials for Cement Concrete at Transmeco BP (55th to 56th) & Updated R28 (54th).pdf
2/12/202033863386 SMC4-MA-704 Capacity Profile of Supplier, Manufacturer of Asphalt Material for Asphalt Concrete.pdf
2/15/202033873387 SMC4-MS-407 Method for Erection of Super T Girder at Span S48(P47-P48).pdf
2/12/202033883388 SMC4-WD-503 WD of Parapet Span P36-P40(1st Rev.).pdf
2/12/202033893389 SMC4-WD-504 WD of Superstructure -Deck Slab for Span 8 & Link Slab at Pier P7 (2nd).pdf
2/12/202033903390 SMC4-WD-505 WD of Superstructure-Deck Slab for Span 9 & Link Slab P9 at Pier P9 (2nd).pdf
2/12/202033913391 SMC4-WD-506 WD of Superstructure- Deck Slab for Span 7 (2nd).pdf
2/12/202033923392 SMC4-WD-507 WD of Parapet (Right Side) of Span P27-P32 (1st Rev.).pdf
2/12/202033933393 SMC4-WD-508 WD of Parapet & Median Barier of Span P57-P61 (2nd).pdf
2/12/202033943394 SMC4-LC-1016 Acceptance of SubStructure Construction Stage & Transfer tro Construction of Superstructure Work for P45.pdf
2/22/202033953395 SMC4-MA-705 Characteristic Strength for Concrete Class G of Transmeco BP- RP 02( fr 12 Oct 19 to 27 Oct 19).pdf
2/13/202033963396 SMC4-MA-706 Characteristic Strength for Concrete Class B of Transmeco BP - RP 05 (fr 2 Dec 19 to 30 Dec 19).pdf
2/13/202033973397 SMC4-MA-707 Characteristic Strength for Concrete Class C of Viet Tiep BP (new Location) - RP 05 (fr 2 Dec 19 to 31 Dec 19).pdf
2/13/202033983398 SMC4-MA-708 Characteristic Strength for Concrete Class C of Asean BP( New Location)- RP 05 (for 01 Dec 19 to 29 Dec 19).pdf
2/13/202033993399 SMC4-MA-709 Characteristic Strengh for Concrete Class C of Transmeco BP- RP 11 (fr 01 Dec19 to 31 Dec 19).pdf
2/13/202034003400 SMC4-LC-1017 Submission of Monthly Report No.21.pdf
2/13/202034013401 SMC4-LC-1018 Checking Record of Equipment & Manpower of Manpower & Equipment Mobilization Document of Thanh Long Gr for Transp
2/13/202034023402 SMC4-LC-1019 Engineer's Confirmation for Safety & Environment Satisfaction (Jan 2020).pdf
2/13/202034033403 SMC4-LC-1020 Request for Instruction on Noise Barrier for P26-P27 Area.pdf
2/13/202034043404 SMC4-LC-1021 Supplement of Document for Stage Inspection to Proceed Next Works.pdf
2/13/202034053405 SMC4-WD-509 WD of General Arrangement of Traffic Sign for Express Way Km0+130 to Km2+812.5(update).pdf
2/13/202034063406 SMC4-WD-510 WD of Road Work - Express Way from Sta.0+320.00-Sta.0+447.90.pdf
2/15/202034073407 SMC4-AD-149 AD of Pre Tensioning Pre Stressed Super T Girder Span 48 (P47-P48).pdf
2/15/202034083408 SMC4-AD-150 AD of Pre Tensioning Pre Stressed Super T Girder Span 46 (P45-P46).pdf
2/15/202034093409 SMC4-WD-511 WD Top Elevation of Parapet & Median Barrier at Span S38 9P37-P38).pdf
2/15/202034103410 SMC4-MS-408 Method for Erection of Super T Girder at Span S43 ( P42-P43).pdf
2/15/202034113411 SMC4-LC-1022 Submission of Weekly Report No.91.pdf
2/21/202034123412 SMC4-LC-1023 Report on Environment Monitoring in Construction Stage (1st Time in Feb 2020, based on S1.43).pdf
2/17/202034133413 SMC4-MA-694A Reply on RC Pipe D400, D500, Precast Bearing D400, D500- Ha Thanh Concrete JSC.pdf
2/17/202034143414 SMC4-LT-33 Updated Document of Independent Laboratories of ITST (Road Lab 1, Vilas 276-Las-XD 831,201).pdf
2/17/202034153415 SMC4-LC-1024 Additional Machine Mobilization Document (1 Crane 200 ton) of Thanh Long JSC for Erection of Steel Bridge- 4th.pd
2/17/202034163416 SMC4-LC-1025 Renewal of the Calibration Certificate of the Approved Truck Crane 180 Ton of Subcontractor Thanh Long JSC for Er
2/17/202034173417 SMC4-MA-710 Testing Result of Augnment Bar Use for Bracing Work of Paraweb Strip.pdf
2/17/202034183418 SMC4-MA-711 Testing Result of Paraweb Strip Material.pdf
2/19/202034193419 SMC4-MS-409 MS of Removal & Relocation of Trees at Section from Beginning Points to P16 (2nd).pdf
2/17/202034203420 SMC4-MS-410 Report on Loading Test of Temporary Support TP13, TP14 (G3+G4) for Steel Girder Erection.pdf
2/21/202034213421 SMC4-MS-411 Changing Screw Jack by H Beam to Support Steel Girder at Temporary Piers Position of TP2 to TP10.pdf
2/19/202034223422 SMC4-MS-412 MS for Construction of MSE Wall.pdf
2/17/202034233423 SMC4-LC-1026 Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P48.pdf
2/15/202034243424 325-GM-BQLDATL Invitation- Meeting on Implementation of Cutting-Removing-Rooting up Green Trees for Construction of HCRR3.pdf
2/15/202034253425 65 QD-BQLDATL Approval Decision for Modification of Detailed Design of On-Off Ramps HCRR3 Construction Project.pdf
2/19/202034263426 SMC4-MS-413 Resubmission of Permission for Circulation of Vehicles to Transport Overlength Cargo on Road (Transportation of St
2/19/202034273427 SMC4-MC-26 Appication for Interim Payment Certificate 19 (Period 01st Jan to 31st Jan 2020).pdf
2/19/202034283428 SMC4-MS-414 Report on Loading Test of Temporary Support TP2 (G3+G4) for Steel Girder Erection.pdf
2/19/202034293429 SMC4-AD-151 AD of Pre Tensioning Pre Stressed Super T Girder Span 43 (P42-P43).pdf
2/19/202034303430 SMC4-MS-415 Method Drawing for Erection of Super T Girder at Span S53(P52-P53) & S54 (P53-P54).pdf
2/19/202034313431 SMC4-WD-512 WD of Road Work -Expressway from Station Km0+494.22-Km0+568.40 (1st Rev.).pdf
2/19/202034323432 SMC4-LC-1027 Calculation Verifying the Construction Sequence for Deck Slab Work & Request to Supply Additional Related Documen
2/19/202034333433 SMC4-MA-712 Capacity Profile of Supplier New Link JSC for PVC Pipe- Thuan Phat JSC (2nd).pdf
2/19/202034343434 SMC4-MA-713 Report on Frequency Test of Bolt Material for Steel Bridge S10T ( Including Nut & Washer) Taking Sample dated 11 D
2/19/202034353435 SMC4-MA-714 Test Result of Stud Bolt of Hangzhou Jiaxiang Bolts Co.,Ltd & Welding Procedure for Steel Bridge.pdf
2/19/202034363436 SMC4-MA-715 Test Result of Shear Stud(D19x155,D19x205) & Welding Procedure for Steel Bridge.pdf
2/19/202034373437 SMC4-MA-716 Capacity Profile of Supplier & Manufacturer of Deck Drain Box, Trash rack-Traffic Sign System (Warning & Regulator
2/19/202034383438 SMC4-MS-416 Notice on Expected Schedule of Removal & Relocation of Trees at Section from Beginning Point to Pier P16.pdf
2/20/202034393439 SMC4-LC-1028 Acceptance of Substructure Construction Stage & Transfer to Construction of Superstructure Work P43.pdf
2/20/202034403440 SMC4-LC-1029 Additional Equipment Mobilization Document for Parapet Work at P56-P60 Under Scope of 414 Co..pdf
2/20/202034413441 SMC4-LC-1030 Additional Supervision Cost of Engineer's Staff (Dec 19).pdf
2/20/202034423442 SMC4-LC-1031 Documents for Stage Inspection Proceed Next Works P23-P26, P28, P38-P40.pdf
2/20/202034433443 SMC4-WD-515 WD of Parapet & Median Barrier of Spans P49-P53 (2nd).pdf
3/3/202034443444 SMC4-MS-417 Document of Protection of Manhole for Water Supply at MSE Wall Righ Side (1st).pdf
2/20/202034453445 SMC4-RP-125 Updated Report on th Phenomenon of Crack on Abutment A1's Stem Wall& Treatment Method.pdf
2/20/202034463446 SMC4-MA-717 Testing Result of Non-Woven Geotextile ART14-Vietnam Geotextile JSC.pdf
2/20/202034473447 SMC4-MA-718 Test Result of Sponge Rubber Packing for SCC Deck Slab of Steel Bridge- Kien Kiet Rubber Mechanical JSC.pdf
2/20/202034483448 SMC4-MA-719 Report on Frequency Test of Paint for Steel Bridge of Hai Phong Paint JSC ( Sampling Dated 17 Jan2020).pdf
2/20/202034493449 SMC4-WD-513 WD of Parapet & Median Barrier of Spans P8-P11 (2nd).pdf
2/27/202034503450 SMC4-WD-514 WD of Parapet & Median Barrier of Spans P53-P57(2nd).pdf
2/20/202034513451 SMC4-MA-720 Report on Frequency Test of Paint for Steel Bridge of Hai Phong Paint JSC ( Sampling dated 9 Jan 2020).pdf
2/20/202034523452 SMC4-LC-1033 Manpower Mobilization Document for Superstructure Work (2nd).pdf
2/21/202034533453 SMC4-LC-1032 Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P53.pdf
3/9/202034543454 SMC4-LC-1034 Machine & Manpower Mobilization Documnet of Hanoi Infrastructure & Cultural Construction Cor. for Cutting & Pruni
2/22/202034553455 SMC4-LC-1035 Acceptance of Substructure Construction Stage & Transfer to Construction of Superstructure Work for P52.pdf
2/22/202034563456 SMC4-MS-402A MS for Production of Precast RC Bearing for Circular Culvert.pdf
2/22/202034573457 SMC4-MS-418 Report on Loading Test of Temporary Support TP6, TP7, TP9 (G1+G2) for Steel Girder Erection.pdf
2/22/202034583458 SMC4-WD-516 WD Top Elevation of Parapet & Median Barrier S39 (P38-P39).pdf
2/22/202034593459 SMC4-WD-517 WD of Elevation & Thickness of Deck Slab S55(P54-P55).pdf
2/22/202034603460 SMC4-WD-518 WD Top Elevation of Parapet & Median Barrier at Spans S12(P11-P12)-S16(P15-P16).pdf
2/22/202034613461 SMC4-LC-1036 Submission of Weekly Report No.92.pdf
2/22/202034623462 SMC4-LC-1037 Additional Machine & Manpower Mobilization Document (Tractor, Trailer,Driver ) of Subcontractor Thanh Long JSC -
2/22/202034633463 SMC4-AD-152 AD of Pre Tensioning Pre Stressed Super T Girder Span 53 (P52-P53).pdf
2/22/202034643464 SMC4-LC-1038 Report on Environment Monitoring in Construction Stage (2nd Time in Feb 2020, Based on S1.43).pdf
2/25/202034653465 SMC4-MA-721 Report on Frequency Test of Reinforcing Steel VIS for Super T Girder Span S52 (MoC&TS dated 13 Feb 2020).pdf
2/25/202034663466 SMC4-MA-722 Report on Frequency Test of Reinforcing Steel VIS for Super T Girder of Span S33 ( MoC&TS dated 11 Feb 2020).pdf
2/25/202034673467 SMC4-AD-153 AD of Pre Tenssioning Pre Stressed Super T Girder Span S54(P53-P54).pdf
2/25/202034683468 SMC4-MS-419 Report on Loading Test of Temporary Support TP10 (G1+G2) for Steel Girder Erection.pdf
2/25/202034693469 SMC4-WD-519 WD Top Elevation of Parapet & Median Barrier at Spans S54(P53-P54) to S57(P56-P57).pdf
2/25/202034703470 SMC4-WD-520 WD of the Elevation & Thickness of Deck Slab at Span S47 (P46-P47).pdf
2/25/202034713471 SMC4-WD-521 WD of Substructure -Upper Part of Pier Head P32 (2nd).pdf
2/25/202034723472 SMC4-WD-522 WD of Parapet & Median Barrier of Spans P44-P49 (2nd).pdf
2/25/202034733473 SMC4-WD-523 WD of Substructure-Elevation of Bearing Pier P43(1st).pdf
2/25/202034743474 SMC4-WD-524 WD of Adjustmetn of Exterior Girder EXT1-G1 & EXT1-G10 Span S44 (P43-P44).pdf
2/25/202034753475 SMC4-LC-1039 Clarification of Pavement Structure for Approach Road & Urban Road form Km0+320.00-Km0+835.70.pdf
2/25/202034763476 SMC4-LC-1040 Acceptance of Sub Structure Construction Stage & Transfer to Construction of Substructure Work for P53.pdf
2/25/202034773477 SMC4-MS-420 Report on Loading Test of Temporary Support TP8 ( G1+G2) for Steel Girder Erection.pdf
2/25/202034783478 SMC4-MS-421 Submission of Changing Diagonal Bracing Bar at Temporary TP2, TP3(G1+G2).pdf
2/25/202034793479 SMC4-LC-1041 Request for Reply of Submitted Documents Regarding Drainage System.pdf
2/25/202034803480 SMC4-MS-422 Method Drawing for Erection of Super T Girder at Span S10 (P9-P10)-S12 (P11-P12).pdf
2/25/202034813481 SMC4-WD-525 WD of Painting for SCC Deck Slab (2nd).pdf
2/27/202034823482 SMC4-MA-670A Notification of Using VIS Steel for Super T Girders of S54.pdf
3/12/202034833483 SMC4-WD-526 WD of Removal & Relocation of Trees at Section from Beginning Point to P16 (1st).pdf
2/27/202034843484 SMC4-WD-527 WD of Parapet & Median Barrier of Spans at A1-P8.pdf
2/27/202034853485 SMC4-WD-528 WD Top Elevation of Parapet & Median Barrier at Span S35 (P34-P35).pdf
2/27/202034863486 SMC4-MA-724 Frequency Test of Angle Steel L50x5x5 for SCC Deck Slab - Steel Bridge of Thai Nguyen Iron & Steel JSC ( Sampling
3/2/202034873487 SMC4-MA-725 Report on Trial Mix Result Concrete Class C2 at Transmeco BP.pdf
2/27/202034883488 SMC4-MA-726 Report on Trial Mix of Concrete Class E at Viet Tiep BP & Proposal for Using Mix Proportion for Construction of PK
2/27/202034893489 SMC4-LC-1042 Manpower Mobilization of Subcontractor Hiep An JSC for Painting Work for Concrete Structures on Main Site.pdf
2/27/202034903490 SMC4-LC-1043 Cost Estimate for Design Change of Drainage under Viaduct Design Change of Drainage Pipe Culvert D500.pdf
2/27/202034913491 SMC4-LC-1044 Proposal to Replacement of Some Pre Tennsionging Pre Stressed Super T Girders of S49 by Girders of the Span S45 f
2/27/202034923492 SMC4-LC-1045 Notice of Environmental Monitoring Schedule Mar 2020 at Construction Phase.pdf
2/27/202034933493 SMC4-MA-727 Notification on Transfering VGS Steel for the Use of Deck Slab S47.pdf
2/27/202034943494 SMC4-MA-728 Testing Result of Waterproofing Material Haseal 5 of Manufacturer Ha An JSC.pdf
2/27/202034953495 SMC4-MA-729 Capacity Profile of Supplier New Link for PVC Pipe Material of Manufacturer Thuan Phat JSC (3rd).pdf
3/2/202034963496 SMC4-LC-1046 Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P51.pdf
3/2/202034973497 SMC4-MS-423 Report on Loading Test of Temporary Support TP4 (G1+G2) for Steel Girder Erection.pdf
3/2/202034983498 SMC4-LC-1047 Additional Machine & Manpower Mobilization Document (Man Lift Machine) of Thanh Long JSC (2nd).pdf
2/29/202034993499 SMC4-MC-27 Resubmit for Interim Payment Certificate No.19 ( Period 01st -31st Jan 2020).pdf
3/2/202035003500 SMC4-MS-424 Method Drawing for Erection of Super T Girder at Span S49 (P48-P49).pdf
3/2/202035013501 SMC4-MA-730 Report on Frequency Test of Paint for Steel Bridge of Hai Phong Paint JSC ( Sampling dated 11 Feb 2020).pdf
3/2/202035023502 SMC4-MA-731 Capacity Profile of Supplier Transport Materials Equipment Trading Transmeco for Steel Material of Manufacturer of
3/2/202035033503 SMC4-RP-126 Report on Digging Roots for Survey of the Root’s Elevation & Underground Utilities (From Abutment A1 to Pier P15).
3/2/202035043504 SMC4-LC-1049 Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P8.pdf
3/2/202035053505 SMC4-LC-1048 Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P9.pdf
3/2/202035063506 SMC4-LC-1050 Acceptance of Sub structure Construction Stage & Transfer to Construction of Superstructure Work for P7.pdf
3/2/202035073507 SMC4-LC-1051 Submission Weekly Report No.93.pdf
3/2/202035083508 491-GM-BQLDATL Monthly Meeting Thursday 5 Mar 2020.pdf
3/3/202035093509 SMC4-MS-426 Report on Loading Test of Temporary Support TP2 (G1+G2) for Steel Girder Erection.pdf
3/3/202035103510 SMC4-MS-425 Report on Loading Test of Temporary Support TP3 (G1+G2) for Steel Girder Erection.pdf
3/4/202035113511 SMC4-AD-154 AD of Pre Tensioning Pre Stressed Super T Girder Span 49 ( P48-P49).pdf
3/4/202035123512 SMC4-LC-1054 Construction Schedule of March- 2020.pdf
3/4/202035133513 SMC4-LC-1053 Notice for Leave for Key Personnel (Safety Manager) - MR Thai Binh Duong 16 Mar to 1 Apr 2020.pdf
3/4/202035143514 SMC4-LP-70 Proposal for Extension of Advance Payment Security.pdf
3/4/202035153515 SMC4-LC-1052 Clarification of the Location of Basement for Traffic Sign Board at Pier P7.pdf
3/4/202035163516 505 PMUTL-DA1 Scope of Work on Central Median.pdf
3/4/202035173517 SMC4-RP-127 Supplement for Report on Digging Roots Survey of the Root's Elevation & Underground Utilities ( from Abutment A1 t
3/4/202035183518 SMC4-WD-529 WD of Miscellaneous -Drainage Layout for Steel Bridge (1st).pdf
3/4/202035193519 SMC4-MS-427 Supplement Method Drawing for Super t Girder Erection at Span S12.pdf
3/4/202035203520 SMC4-LC-1055 Report on Environment Monitoring in Construction Stage (3rd Time in Feb 2020 Based on S1.42).pdf
3/4/202035213521 SMC4-MA-733 Report on Frequency Test of Elastomeric Bearing Manufactured by Kawakin Core Tech VN Co., Ltd & Supplier by THQ Gl
3/6/202035223522 SMC4-WD-528A WD of Median Barrier of Spans P53-P57 (1st).pdf
3/13/202035233523 SMC4-MS-426A Method Drawing for Construction Layer of Road Work at Exressway from Station Km0+494.22 to Km0+568.04.pdf
3/6/202035243524 SMC4-MA-734 Report on Frequency Test of Paint for Steel Bridge of Hai Phong Paint JSC Sampling dated 13 Feb 2020.pdf
3/6/202035253525 SMC4-LC-1057 Additional Machine& Manpower Mobilization Document of Subcontractor Hanoi Infrastructure & Culture for Cutting &
3/12/202035263526 SMC4-WD-530 Report on Checking Installation of MSE Wall on Left Side & Replacement of the Existing C7L Panel with the New One.
3/6/202035273527 SMC4-MA-732 Using Type uPVC D160 to Replace uPVC D150 of Mechanically Stabilized Earth ( MSE) Retaining Wall.pdf
3/6/202035283528 SMC4-LC-1056 Notice of Equipment Demobilization Crawler Crane Hitachi KH180-3 at P23-P27 Area Under Scope of 412 Co..pdf
3/6/202035293529 SMC4-LC-1058 Notice of Equipment Demobilization- Excavator CAT 320D at P534 Area Under Scope of 423 Co..pdf
3/6/202035303530 SMC4-LC-1060 Withdrawal of the letter LC-1053 dated 3 Mar 2020.pdf
3/6/202035313531 TEDI Clarification of Pavement Structure Used for the Approach Road & Uban Road from Km0+320.00 to Km-+835.700.pdf
3/7/202035323532 SMC4-WD-531 WD of Elevation & Thickness of Deck Slab at Span S54(P53-P54).pdf
3/7/202035333533 SMC4-WD-532 WD of Top Elevation of Parapet & Median Barier at Span S40 (P39-P40).pdf
3/7/202035343534 SMC4-WD-533 WD of Superstructure -Deck Slab for S43 and Link Slab P43 (1st).pdf
3/7/202035353535 SMC4-WD-534 WD of Miscellaneous- Parapet & Median Barrier of Spans P16-P19 (1st).pdf
3/9/202035363536 SMC4-MS-428 Supplement the Method Drawing for Super T Girder Erection at Span S11.pdf
3/6/202035373537 SMC4-LC-1061 Notice for Leave for Key Personnel ( Safety Manager).pdf
3/7/202035383538 SMC4-MA-735 Report on Frequency Test of Reinforcing Steel VGS for Deck Slab S46-S48 , Diaphram Span S45-S49, Parapet S30, S53-
3/7/202035393539 SMC4-MA-736 Report on Frequency Test of Reinforing Steel VIS Steel Bar for Super T Girder Span S51, S52 (MoC&TS 25 Feb 2020).p
3/7/202035403540 SMC4-MA-737 Report on Frequency Test of Reinforcing Steel VGS Steel for Catch Basin CB-2B Section A1-P10,Section P18-P25,Catc
3/7/202035413541 SMC4-MA-738 Report on Frequency Test of Reinforcing Steel VGS for Pier Head P32 & Catch Basin Section P18-P25 ( M0C&TS dated 2
3/9/202035423542 SMC4-LC-1059 Acceptance of Substructure Construction Stage & Transfer to Construction of Superstructure Work P44.pdf
3/9/202035433543 SMC4-LC-1062 Submission of Weekly Report No.94.pdf
3/9/202035443544 SMC4-WD-535 WD of Detail of Noise Barrier (2nd).pdf
3/9/202035453545 SMC4-WD-536 WD of General Layout of Noise Barrier (3rd).pdf
3/10/202035463546 SMC4-MS-429 Method Drawing for Super T Girder Erection at Span S10.pdf
3/13/202035473547 SMC4-MS-430 Method Drawing for Erection of Super T Girder at S52 (P51-P52).pdf
3/11/202035483548 SMC4-LC-1063 Acceptance of Substructure Construction Stage & Transfer to Construction of Superstructure Work for P51.pdf
3/11/202035493549 SMC4-WD-537 WD of Median Barrier of Spans P40-P44.pdf
3/11/202035503550 SMC4-WD-538 WD of Painting of Parapet for Main Bridge.pdf
3/11/202035513551 SMC4-WD-539 WD of Parapet of Spans P40-P43.pdf
3/13/202035523552 SMC4-MA-739 Capacity Profile of Manufacturer & Supplier of Pull Box & U Bolt for Lighting Hai Anh Co.Ltd.pdf
3/27/202035533553 SMC4-MS-431 Method Statement of Lighting Base on Median Barrier.pdf
3/12/202035543554 SMC4-LT-34 Updated Equipment of Site Laboratory LAS-XD 668 Quality Verification.pdf
3/11/202035553555 SMC4-LC-1064 Submission of Monthly Report No.22.pdf
3/12/202035563556 SMC4-LC-1065 Documents of Losses Caused by the Happent Incident on 23 Aug 2019 during Construction of CIP Concrete Pile No. C9
3/11/202035573557 SMC4-LC-1066 Notice of Deadline for Starting Production of Noise Barrier.pdf
3/11/202035583558 51-PMUTL-DA1 Approval for Subcontractor for Relocation, Cutting & Pruning Trees.pdf
3/12/202035593559 SMC4-LC-1067 Acceptance of Sub Structure Constructure Stage & transfer to Construction of Superstructure Work for P9.pdf
3/12/202035603560 SMC4-LC-1068 Report on Environment Monitoring in Construction Stage (1st Time in Mar 2020, based on S1.43).pdf
3/12/202035613561 SMC4-LC-1069 Withdrawal of the Letter SMC4-LC-1065-20 dated 10 Mar 2020.pdf
3/12/202035623562 SMC4-LC-1070 Acceptance of Sub Structure Construction Stage & Transfer to Construction of Superstructure Work for P8.pdf
3/12/202035633563 SMC4-LT-35 Updated Document of Independent Laboratories of IBST ( LAS-XD 01, LAS-XD 03, LAS-XD 05).pdf
3/12/202035643564 SMC4-WD-540 WD of Detail of Pipe Culvert D500 & Catch Basin Type (CB-A) under Viaduct Section A1-P61.pdf
3/30/202035653565 SMC4-WD-541 WD of Detail of Pipe Culvert D400, U-ditch& Catch Basin in the Section of Retaining Wall.pdf
3/30/202035663566 SMC4-WD-542 WD of Detail of Catch Basin U-ditch of Drainage System under Viaduct Section A1-P10.pdf
3/12/202035673567 SMC4-WD-543 WD of General Layout of Drainage System from Km0+400-Km2+812.50.pdf
3/30/202035683568 SMC4-WD-544 WD of Detail for Catch Basin U-ditch of Drainage System under Viaduct Section P18-P25.pdf
3/12/202035693569 SMC4-MA-740 Characteristic Strength for Concrete Class A of Viet Tiep BP (New Location) - RP No.7 (from 1 Dec to 31 Dec 2019).
3/12/202035703570 SMC4-MA-741 Characteristic Strength for Concrete Class C of Transmeco BP- Rp No.2 (from 3 Jan to 19 Jan 2020).pdf
3/12/202035713571 SMC4-MA-742 Characteristic Strength for Concrete Class B of Transmeco BP-RP No.6 (from 3 Jan to 18 Jan 2020).pdf
3/12/202035723572 SMC4-AD-155 AD of Substructure of Pier P55.pdf
3/12/202035733573 SMC4-AD-156 AD of Substructure of Pier P56.pdf
3/13/202035743574 SMC4-RP-128 Report on Completion of Remedial Works for Crack on A1 Abutment's Stem Wall.pdf
3/13/202035753575 SMC4-LC-1074 Regarding the Submission of AD for Tranfering Stage of Substructure P7,P8,P9,P44,P51.pdf
3/13/202035763576 SMC4-LC-1071 Acceptance of Substructure Construction Stage & Transfer to Construction of Superstructure Work for P7.pdf
3/13/202035773577 SMC4-LC-1072 Withdrawal of letter SMC4-LC-1061.20.pdf
3/13/202035783578 SMC4-LC-1073 Summary Table of Waste Disposal Implemented by the Subcontractors at Nguyen Khe Disposal Area from Oct to Dec 201
3/14/202035793579 SMC4-MA-744 Electrical Material- Luminaires.pdf
3/13/202035803580 SMC4-MS-432 Erection Method of Deck Panel for Steel Bridge.pdf
3/14/202035813581 SMC4-AD-157 AD of Pre Tensioning Pre Stressed Super T Girder of Span 9 (P8-P9).pdf
3/13/202035823582 SMC4-AD-158 AD of Pre Tensioning Pre Stressed Super T Girder Span S52 (P51-P52).pdf
3/13/202035833583 SMC4-MA-745 Report on Frequency Test of VGS to Use for Diaphragm S53L-S56L, Parapet P41R-P45R (the MoC&TS dated 29 Feb 2020).p
3/13/202035843584 SMC4-MA-746 Report on Frequency Test of VGS to Use for Deck Slab S53-S54, Link Slab P54 (the MoC&TS dated 3 Mar 2020).pdf
3/13/202035853585 SMC4-MA-747 Report on Frequency Test of VGS to Use for Deck Slab & Diaphragm S54-S61, Link Slab P53-P61 ( the MoC&TS dated 3 M
3/13/202035863586 SMC4-MA-748 Report on Frequency Test of VIS to Use for Super T Girder Span S32,S49 ( the MoC&TS dated 6 Mar 2020).pdf
3/16/202035873587 320 PMUTL-DA1 Design Change of Drainage under Viaduct.pdf
3/16/202035883588 SMC4-MA-743 Report on Test Result of Deck Drain Box, Trash Rack Material Manufactured by Tran Duc Hung Co.Ltd & Supplied by H
3/13/202035893589 SMC4-LC-1076 Submission of Weekly Report No.95.pdf
3/13/202035903590 SMC4-LC-1075 Confirmation for Safety & Environment Satisfaction (1 to 29 Feb 2020.pdf
3/13/202035913591 SMC4-MS-433 Method Drawing for Erection of Super T Girder at Span S9 (P8-P9).pdf
3/13/202035923592 SMC4-MA-434 Calculation of Tendon Cable Elongation of Pier Head P32.pdf
3/13/202035933593 SMC4-WD-545 WD of Elevation & Thickness Deck Slab at Span S43 (P42-P43), S48 (P47-P48), S53 (P52-P53).pdf
3/13/202035943594 SMC4-MA-749 Updated Profile of Noise Barrier of Nippon Supplied by Nam Anh (3rd).pdf
3/13/202035953595 SMC4-MA-750 Report on Frequency Test of Materials for Cement Concrete at Transmeco BP(57th).pdf
3/13/202035963596 SMC4-MA-751 Report on Frequency Test of Materials for Cement Concrete at Viet Tiep BP (26th,27th) & Updated Result Cement R28
3/16/202035973597 SMC4-WD-546 Calculation Sheet for Camber of Steel Girder (2nd Rev.).pdf
3/16/202035983598 SMC4-AD-159 AD of Pre Tensioning Pre Stressed Super T Girder of Span 8 (P7-P8).pdf
3/16/202035993599 SMC4-MA-752 Test Result of Stainless Steel Bolt (SUS 304) Material of Tongheer Fassterners Co.SND.BHD (Malaysia).pdf
3/16/202036003600 SMC4-MA-753 Report on Frequency Test Paint for Steel Bridge of Hai Phong JSC (Sampling dated 25 Feb 2020).pdf
3/16/202036013601 SMC4-MA-754 Notification on Transfering VGS Steel for the Use of Diaphragm S43, Link Slab at Pier P51,P52.pdf
3/16/202036023602 SMC4-MA-755 Notification on Transfering VGS Steel for the Use off Deck lab, Diaphragm S12.pdf
3/16/202036033603 SMC4-MA-756 Notification on Transfering VIS Steel for the Use of Super T Girder off G10- Span S44 of 414 Co.Ltd.pdf
3/16/202036043604 SMC4-LC-1077 Mobilization Document of Bolt Tension Meter.pdf
3/16/202036053605 SMC4-LC-1078 Reply on Engineer's Warning about Construction Quality of Drainage Pipe Culvert.pdf
3/16/202036063606 611 TB-BQLDATL Notice on Conclusions given by PMU Thang Long in the Meeting.pdf
3/16/202036073607 95 TB-BGTVT Notice on Conclusions given by Vice Minister Nguyen Ngoc Dong in the Site Visit(n).pdf
3/17/202036083608 SMC4-MA-757 Freqquency Test of Stud Bolts of Hanzhou Jiaxiang Gaogiang Bolts Co. Ltd & Welding Procedure for Steel Bridge.pdf
3/17/202036093609 SMC4-MA-758 Frequency Test of Shear Stud Connector for Steel Bridge Taking Sample dated 2 Mar 2020.pdf
3/17/202036103610 SMC4-MA-759 Testing Result of Bolt Used for Lighting Pole Vonta Co.Ltd.pdf
3/17/202036113611 SMC4-MS-435 Supplement of Sequence for Construction of Pier Head at P16, P19.pdf
3/17/202036123612 SMC4-WD-547 WD of Parapet of Spans P53-P57 (1st).pdf
3/17/202036133613 SMC4-WD-548 WD of Parapet of Spans P49-P53 (1st).pdf
3/17/202036143614 SMC4-WD -549 WD of Median Barrier of Spans P49-P53 (1st).pdf
3/17/202036153615 SMC4-LC-1079 Concrete Compressive Strength Testing R7 of Super T Girder of Span S52.pdf
3/18/202036163616 SMC4-LC-1080 Submission of Weekly Report No.96.pdf
3/18/202036173617 SMC4-LC-1081 Document for Mobilization of Subcontractor Thanh Long Group JSC for Construction of Steel Bridge.pdf
3/18/202036183618 SMC4-LC-1082 Contractor's Clarification on Choise of Anchor Bolt for Noise Barriers.pdf
3/18/202036193619 SMC4-AD-160 AD of Pre Tensioning Pre Stressed Super T Girder of Span 7 (A1-P7).pdf
3/19/202036203620 SMC4-WD-550 WD of Electric & Lighting - Conduit Layout of Electric Lighting & ITS System for Expressway (1st).pdf
3/19/202036213621 SMC4-MA-760 Notification on Transfering VIS Steel for the Use of Super T Girder G7- Span S32 of 422 Co..pdf
3/19/202036223622 SMC4-LC-1083 Machine & Manpower Mobilization Document for Finishing Work of Structure at Project.pdf
3/19/202036233623 SMC4-MS-436 Document of Reconnecting Culvert Pipe D1250 of Ministry of Police Sercurity ( 1st).pdf
3/30/202036243624 SMC4-LC-1084 Respond to Galvanized Bolts Delivered at Factory for the Steel Bridge.pdf
3/24/202036253625 SMC4-MA-761 Approval of Electrical Material- Luminaires( Slighting ... JSC).pdf
3/19/202036263626 SMC4-LC-1085 Construction Plan of Drainage under Viaduct and Site Hand over plan.pdf
3/20/202036273627 SMC4-LC-1086 Mobilization Document of Subcontractor Thanh Long Group JSC for Construction of Steel Bridge.pdf
3/20/202036283628 SMC4-LC-1088 Withdrawal of the Letter SMC4-MS-0436 dated 18Mar2020.pdf
3/28/202036293629 SMC4-WD-551 WD of Detail for Catch Basin U-Ditch of Drainage System under Viaduct Section P42-P49.pdf
3/20/202036303630 SMC4-WD-552 WD of Miscellaneus- Parapet of Spans P8-P11 (1st).pdf
3/20/202036313631 SMC4-WD-553 WD of Miscellaneous-Median Barrier of Span P44-P49 (1st).pdf
3/20/202036323632 SMC4-WD-554 WD of Detail for Catch Basin U Ditch of Drainage System under Viaduct Section P11-P17.pdf
3/20/202036333633 SMC4-MC-28 Application for Interim Payment Certificate No. 20 ( Period 1-29 Feb 2020).pdf
3/20/202036343634 SMC4-LC-1087 Acceptance of Sub Structure Constructure Stage & Transfer to Construction of Superstructure Work for P44.pdf
3/21/202036353635 SMC4-WD-557 WD of Electric & Lighting Equipment & Facilities of Electruc for Lighting & ITS System for Expressaway (1st).pdf
3/21/202036363636 SMC4-WD-556 WD of Antiglare Fence from A1-P61.pdf
3/21/202036373637 SMC4-WD-555 WD of Elevation & Thickness of Deck Slab S11(P10-P11), S12(P11-P12).pdf
3/21/202036383638 SMC4-LC-1089 Additional Machine & Manpower Mobilization Document(1 Crane 220Ton) of Subcontractor Thanh Long JSC for Erection
3/21/202036393639 SMC4-LC-1090 TOR & Cost Estimate for General Traffic Control for Public Road for Construction Stage 2.pdf
3/23/202036403640 SMC4-MS-437 Resubmission of Erection Method of Deck Panel for Steel Bridge (2nd).pdf
3/23/202036413641 SMC4-LC-1092 Supplement of As-built Documents for Substructure P29, P30.pdf
3/23/202036423642 SMC4-WD-558 WD of Miscellaneous-Parapet of Spans P44-P49 (1st).pdf
3/23/202036433643 SMC4-MA-762 Report on Frequency Test of Reinforcing Steel VGS for Deck Slab Span S9,P10,P12-Diaphragm S9,S10-S12,S16- Parapet
3/23/202036443644 SMC4-MA-763 Report on Frequency Test of Stud Bolt Hangzhou Jiaxiang Gaoqiang Boilts Co.Ltd (Sampling dated 7 Mar 2020).pdf
3/30/202036453645 SMC4-MA-764 Report on Frequency Test of Bolt Material for Steel Bridge S10T (including Nut & Washer) Taking Sample dated 7 Mar
3/23/202036463646 SMC4-MA-765 Report on Frequency Test of Paint for Steel Bridge of Hai Phong Paint JSC (Sample dated 7 Mar 2020).pdf
3/23/202036473647 SMC4-MS-438 Structure Calculation Sheet for Erection Method of Deck Panel for Steel Bridge (1st).pdf
3/23/202036483648 SMC4-LC-1091 Additional Supervision Cost of Engineer's Staff in Jan2020.pdf
3/24/202036493649 SMC4-MS-439 Resubmission of the Supplement of Sequence for Construction of Pier Head at P16, P19 (rev.2).pdf
3/23/202036503650 SMC4-1093 Construction Plan of Drainage under Viaduct & Site Hand Over Plan ( Rev.1).pdf
3/24/202036513651 SMC4-MA-766 Report on Frequency Test of Material for Cement Concrete at Asean BP (31st) & Updated Result of Cement R28 (30th).
3/25/202036523652 SMC4-MA-767 Testing Result of Paraweb Strip Material.pdf
3/25/202036533653 SMC4-MA-768 Proposal to Use Concrete Class D - 25MPa ( Ha Thanh) to Change Concrete Class E - 21 MPa for RC in Ha Thanh.pdf
3/25/202036543654 SMC4-MA-769 Mix Proporation for Trial Mix Class C2 at Asean BP.pdf
3/25/202036553655 SMC4-MA-770 Report on Frequency Test of Material for Reinforced Concrete Structure Manufactured in Ha Thanh.pdf
3/30/202036563656 SMC4-MA-771 Report on Frequency Test of Shear Stud Connector for Steel Bridge ( Taking Sample dated 14 Mar 2020).pdf
3/25/202036573657 SMC4-MA-772 Test Result of Hot Dipped Galvanized Bolts by KPF Vina ( Boils)& Anh Duong JSC (Nut& Washer) & Supplied by Tan Co
3/25/202036583658 SMC4-MA-773 Capacity Profile of Manufacturer & Supplie of Mechanical Product Material- Hai Anh Co.Ltd.pdf
3/25/202036593659 SMC4-WD-559 WD the Top Elevation of Parapet & Median Barrier at Span S41 (P40-P41).pdf
3/25/202036603660 SMC4-WD-560 WD of Superstructure- Deck Slab for Span 33.pdf
3/25/202036613661 SMC4-WD-561 WD of Superstructure - Deck Slab for Span 44.pdf
3/25/202036623662 SMC4-MS-440 MS for Erection of Super T Girder S44 (P43-P44), S45 (P44-P45).pdf
3/25/202036633663 SMC4-AD-161 AD ofPre Tensioning Pre Stressed Super T Girder Span 45 (P44-P45).pdf
3/25/202036643664 SMC4-LC-1094 Submission of Weekly Report No.97.pdf
3/25/202036653665 SMC4-LC-1095 Supplement of AD for Substructure Pier P23-26, P28, P38.pdf
3/25/202036663666 SMC4-LC-1096 Document Status for WD of Parapet& Center Median.pdf
3/25/202036673667 SMC4-LC-1097 Notice of Equipment Demobilization of Crane Kobelco 7055 for Construction of Substructure Under Score of Co.423.p
3/25/202036683668 SMC4-AD-162 AD of Pre Tensioning Pre Stressed Super T Girder Span 44 (P43-P44).pdf
3/26/202036693669 SMC4-LC-1098 Report on Environment Monitoring in Construction Stage 2nd time in March 2020 (base on S1.43).pdf
3/26/202036703670 SMC4-MA-774 Supplement of Capacity Profile of Electrical Material of Vestel Trade Co.& Osram- Luminaires.pdf
3/26/202036713671 SMC4-WD-562 WD of Miscellaneous- Detail of Road Marking on Expressway.pdf
3/26/202036723672 SMC4-WD-563 WD of Median Barrier of Spans A1-P8 (1st).pdf
3/26/202036733673 SMC4-WD-564 WD of Median Barrier of Spans P8-P11 (1st).pdf
3/26/202036743674 SMC4-WD-565 WD of Parapet of Spans A1-P8 (1st).pdf
3/27/202036753675 SMC4-MA-775 Report on Frequency Test of Reinforcing Steel VGS for Parapet of Span S47-S61 ( MoC & TS dated 15 Mar 2020).pdf
3/27/202036763676 SMC4-MA-776 Report on Frequency Test of Reinforcing Steel VIS Bar for Super T Girder Span S51 (M0C& TS dated 18 Mar 2020).pdf
3/28/202036773677 SMC4-MA-777 Report on Frequency Test of Reinforcing Steel VGS for Deck Slab S46-S49 ( MoC& TS dated 17 Mar 2020).pdf
3/26/202036783678 SMC4-MA-778 Report on Frequency Test of Reinforcing Steel VGS for Deck Slab & Parapet S43R,S44R,S45R-Link Slab P42R,P43R-Diaph
3/26/202036793679 SMC4-MA-779 Updated Capacity Profile of Electrical Cable & Ground Wire Material of Thuong Dinh Electrical Wire & Cable JSC.pdf
3/27/202036803680 SMC4-MA-780 Updated Capacity Profile of Supplier, Manufacturer Bitumen, Bitumen Emulsion Used for Asphalt Concrete.pdf
3/26/202036813681 SMC4-WD-566 WD of the Elevation & Thickness of Deck Slab at Spans S49 (P48-P49), S52 (P51-P52).pdf
3/31/202036823682 SMC4-WD-567 WD of Detail for Catch Basin Uditch of Drainage System under Viaduct Section P35-P41.pdf
3/27/202036833683 SMC4-WD-568 WD of Miscellaneous-General Layout of Signboard & Road Marking on the Expressway.pdf
3/27/202036843684 SMC4-RP-129 Report on Updated Data of Topographic Survey Pham Van Dong Street at Section From Km0+440 to Km0+494.22.pdf
3/27/202036853685 SMC4-LC-1099 Notice of Environment Monitoring Schedule in Apr 2020 at Construction Phase.pdf
3/27/202036863686 SMC4-LC-1100 Supplement of AD for Substructures P27, P36, P37,P57.pdf
3/27/202036873687 SMC4-LC-1101 Notice of Equipment Demobilization- Crawler Crane Hitachi KH 180-3 & Drilling Machine Kobelco 7055 R10 under Scop
3/28/202036883688 SMC4-MC-29 Resubmit for Interim Payment Certificate No.20 ( Period 1-29 Feb 2020).pdf
3/31/202036893689 SMC4-MA-783 Report on Frequency Test of Reinforcing Steel VIS for Super T Girder of Span S33, Uditch (MoC&TS dated 17 Mar 2020
3/31/202036903690 SMC4-MA-781 Report on Frequency Test of Galvanized Bolt Material & Galvanized Nut & Washer Used for Steel Bridge ( Sampling da
3/30/202036913691 SMC4-MS-441 MS for Construction of Deck Drainage System.pdf
3/30/202036923692 SMC4-MS-442 MS of Painting of Concrete Surface of Parapet, SPT Girder & Retaining Wall.pdf
3/30/202036933693 SMC4-LC-1102 Notice on Isolation of 2 Staffs & Prevention Methods Against COVID19 of the Contractor.pdf
3/30/202036943694 SMC4-WD-569 WD of Parapet of Spans P40-P43 (2nd).pdf
3/30/202036953695 SMC4-WD-570 WD of Elevation & Thickness of Deck Slab at Spans S16 (P15-P16), S20 (P19-P20).pdf
3/30/202036963696 SMC4-AD-163 As Built Drawings of Pre Tensioning Pre Stressed Super T Girder Span 44 ( P43-P44).pdf
3/30/202036973697 SMC4-LC-1103 Supplement for Construction Plan of Drainage Under Viaduct & Site Hand over Plan ( Rev.1).pdf
3/30/202036983698 SMC4-LC-1104 Supplement of AD for Substructure Pier P21, P22, P59, P60.pdf
3/30/202036993699 SMC4-LC-1105 Report on Phenomenon of Gaps Under Elastomeric Bearings & Treatment Method (3rd).pdf
3/30/202037003700 SMC4-MA-785 Material- Reinforced Concrete Pipes D1250, Precast Bearing D1250 Used for Drainage System- Ha Thanh Concrete JSC.p
11/23/201711A11A 2107-PMUTL-DA1 Approval for Replacement of project Manager.pdf
11/23/201711A11A-2107-PMUTL-DA1 Approval for Replacement of project Manager.pdf